BLD-Final | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
DOC - Permit Finaled | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Conference | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PART |
Tony Young
|
|
|
Jeff Phone #: ###-####,, met stair railing guy on site,, went over code provisions
|
BLD-Final | 5/9/2019 | 5/13/2019 | 5/13/2019 | A | FAIL |
Tony Young
|
|
|
Jeff Phone #: ###-####,, correction posted,, needs protection of gas lines in garage (vehicle barrier) hand and guard rails per code
|
BLD-Blower Door Test Results | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | DONE |
Tony Young
|
|
|
Jeff Phone #: ###-####/// 4.62
|
BLD-Final | 5/2/2019 | 5/6/2019 | 5/6/2019 | A | CANC |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
Inspection Record Card- Bld | | | 5/2/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/6/2018 | 12/6/2018 | 12/7/2018 | P | DONE |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | DONE |
Tony Young
|
|
|
Jeff Phone #: ###-####, already completed,, wrong permit called in
|
BLD-Energy code compliance | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
Plan Modification Accepted | | | 11/16/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 11/16/2018 | | 11/16/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Dave Hannah
|
|
|
shear // Bob Phone #: ###-####
|
BLD-Foundation | 8/13/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Conference | 8/13/2018 | 8/14/2018 | 8/13/2018 | P | CANC |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Inspection cancelled via mobile web on Monday, August 13, 2018.
|
BLD-Footing | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Place hold on job | 7/6/2018 | | 7/11/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
waiting for signed permit back
|
Telephone call | | | 7/11/2018 | | DONE |
|
|
|
Left voicemail for Cody to check the email. Sent two emails since 7/5/18 for the permit to be signed and emailed back.
|
OVERRIDE | | | 7/5/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 5/30/2018 | 5/30/2018 | 7/5/2018 | | DONE |
Rob Patrick
|
|
|
6/12 sfd L1 ePlan...6/11 Failed: Corrections Required
|
Issue PAID IN FULL permit | | | 7/5/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/5/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/5/2018 | | 7/5/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/5/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/2/2018 | | 7/2/2018 | | FAIL |
Rob Patrick
|
|
|
Need more detail on walk-way cover.
|
1st review completed | | | 6/11/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 5/30/2018 | | 6/11/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - MECHANICAL | 5/30/2018 | | 6/1/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 5/30/2018 | 6/2/2018 | 5/31/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Application received | | | 5/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 30 2018 8:54AM
|
Intake Approval | | | 5/30/2018 | | FAIL |
|
|
|
1.Please upload the plans with the drawing file names showing the first characters of the sheet name, followed by the sheet number. (example A.1 Site Plan or Framing A.4) For clarity all plans have been deleted from the drawings folder.
2.Please upload the REScheck or provide the table for prescriptive methods shown on plans.
(prescreen done, plans were deleted. New quick prescreen needed after plans uploaded again)
|
Plans ACCEPTED BY PLAN TECH | | | 5/30/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/30/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/30/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 5/30/2018 | | 5/30/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/30/2018 | | 5/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/30/2018 | | 5/30/2018 | | PASS |
Rachael Beierle
|
|
|
|