Permit Information
Permit NumberBLD18-01930
StatusFinaled
Name LIGHTHOUSE HOMES AND REMODELING
Site Address 1702 N MOCKBEE PL
Project Name1702 Mockbee Home
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED.
|> FIRE SPRINKLERS are required and SHALL be provided. <|
***PLAN UPDATED TO AS-BUILT TO SHOW SIGNIFICANT CHANGES TO THE PERMITTED PLANS ON FILE 12-11-19*** ***PLAN MODIFICATION 11-13-19 - Modified Front, stair case to concrete stairs. See Engineering *** PLAN MODIFICATION 6/20/19 - APPLICANT IS GOING TO FINISH THE ELECTRICAL, MECHANICAL, ROUGH-IN PLUMBING, INSULATE AND COVER THE PREVIOUSLY NOTED UNFINISHED BASEMENT. NO RANGE/KITCHEN IS ALLOWED. ***BJM*** Permit for the construction of a new 3091 sq. ft., three level (basement floor 842 sq. ft., first floor 1567 sq. ft., second floor 682 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, 614 sq ft deck/patio and a 679 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning.
***BJM***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/30/20207/31/20207/31/2020APASS
DetailsBrandon Shaw
Chris - */Requesting Virtual Inspection*/ Phone #: ###-####
DOC - Permit Finaled7/31/20207/31/20207/31/2020PPASS
DetailsBrandon Shaw
BLD-Aging Inspection7/27/20207/27/20207/30/2020 DEFR
DetailsBrandon Shaw
Telephone call  7/15/2020 DONE
emailed contractor to let them know the TCO has expired and they need to request an extension.
Temporary Occupancy5/28/20208/26/20205/28/2020 DONE
DetailsGemma Flores
Change Expiration Date Only  5/28/2020 DONE
BLD-Final5/27/20205/27/20205/27/2020PPEND
DetailsBrandon Shaw
Temp Co of O is approved for basement and main house...
Corrections to be completed before C of O is to be issued- hand rail to be continuous(up stairsflight) and garage door self closing hinge...
Front entry strairs, hand and guard rails, PW approval for landscaping...
Telephone call  5/21/2020 DONE
called and left a VM as well as an email letting them know that the TMP expires tomorrow and that they have to request an extension.
Change Expiration Date Only  5/21/2020 DONE
30 days extension per Jason Blais. See DOCs
Telephone call  4/23/2020 DONE
emailed GC that TCO will expire on May 22, 2020 and to either final out the permit or email Jason Blais to request an extension.
BLD-Aging Inspection4/20/20204/20/20204/20/2020 DEFR
DetailsBrandon Shaw
See previous entry...
emailed GC that TCO will expired on 5/22/2020. See DOCs
Telephone call  4/14/2020 DONE
emailed GC that TCO will expired on 5/22/2020. See DOCs
Change Expiration Date Only  2/25/2020 DONE
add 90 days from 2/22/20 per Jason Blais
Telephone call  2/25/2020 DONE
TCO extended 90 day from 2/22/20 per Jason Blais. See DOCS
Change Expiration Date Only  2/24/2020 DONE
Telephone call  2/24/2020 DONE
called and left a message letting them know that their permit has expired.
Telephone call  2/24/2020 DONE
emailed Jason Blais regarding expired permit
Telephone call  2/24/2020 DONE
Emailed Jason to let him know this had expired. He referred me to Brian McGowan and Brandon Shaw to see if they are aware of any progress on the outstanding issues: Hand rail to be continuous (up stairs flight) and garage door self closing hinge.
Front entry stairs, hand and guard rails to be installed before C of O is issued.
BLD-Aging Inspection2/17/20202/17/20202/18/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days2/18/20202/18/20202/18/2020PDONE
DetailsBrandon Shaw
Telephone call  2/4/2020 DONE
called and left message asking when the tasks might be completed to final this permit
BLD-Final12/18/20191/20/20201/21/2020ADEFR
DetailsBrandon Shaw
Temp C of O to be extended for 30 days, 22Feb2020...
Temporary Occupancy12/19/20193/18/202012/19/2019 DONE
DetailsGemma Flores
PubWorks Subgrade Approval12/19/201912/19/201912/19/2019 DONE
DetailsMelissa Jannusch
*STAIR AND DECK FOOTINGS. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Final12/18/201912/18/201912/18/2019PPART
DetailsBrandon Shaw
Temp C of O is ok for 30 days...
20Jan20 final has been scheduled, corrections- hand rail to be continuous(up stairsflight) and garage door self closing hinge...
Front entry strairs, hand and guard rails to be installed before CofO is issued...
PubWorks Occupancy Approval12/18/201912/18/201912/18/2019 DONE
DetailsJason C. Taylor

A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final12/17/201912/17/201912/17/2019PCANC
DetailsBrandon Shaw
Chris Phone #: ###-####
BLD-Final12/12/201912/12/201912/12/2019PNR
DetailsBrandon Shaw
Chris Phone #: ###-####
OVERRIDE  12/11/2019  
Plan assigned to (BJM)7/16/20197/16/201912/11/2019 DONE
DetailsBrian McGowan
12/12- 7th Review Complete- Updating Plans to what was built- did not resolve all issues.
CHANGE STATUS TO (ISS)  12/11/2019 DONE
Routing - PLAN CHECK12/11/2019 12/11/2019 PASS
DetailsBrian McGowan
Permit Ready to Issue  12/11/2019 DONE
**DO NOT REISSUE - PLAN MOD**
Routing PW Grading-Hillside12/10/2019 12/10/2019 PASS
DetailsMelissa Jannusch
PLAN MOD.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PLANNING12/9/2019 12/9/2019 PASS
DetailsNicolette Womack
As verified by Inspector, overall building height is below 35'.
FIRE-Final Inspection11/26/201911/27/201911/27/2019PCANC
DetailsJim Page
As noted in permit details, no life fire safety signature required for this project, this request is cancelled.

chris Phone #: ###-####
Routing PW Grading-Hillside11/26/2019 11/26/2019 FAIL
DetailsMelissa Jannusch
Stairs on Grading and Drainge plan do not match the site plan please revise.
Routing - PLAN CHECK11/26/2019 11/26/2019 FAIL
DetailsBrian McGowan
Plan Reviewer's activity  11/22/2019  
DetailsBrian McGowan
Replied to an email from Chris stating that the updated elevations he had me upload only had the dimension changed to try and show compliance. Reminded him that the drawings must show compliance, altering one dimension will not suffice when the actual drawing does not match.
Plan Reviewer's activity  11/22/2019  
DetailsBrian McGowan
Brandon did a Site Inspection to verify the height of the home. It measures 34'-10" as per Brandon. He will send me an email to upload into the file.
Routing - PLANNING11/21/2019 11/21/2019 FAIL
DetailsNicolette Womack
Plans scale building height taller than 35'. Required to be less than 35' in overall height.
Plan Reviewer's activity  11/18/2019 DONE
DetailsBrian McGowan
Resubmittals received
Plan Reviewer's activity  11/15/2019  
DetailsBrian McGowan
Emailed Chris, had to tell him again that the drawings being submitted MUST match what he built. He is still trying to upload original, incorrect drawings.
Plan Reviewer's activity  11/13/2019 DONE
DetailsBrian McGowan
Recieved signed letter of Clarification- processed the individual sheets required for Chris to continue constructing the stairs.
This is for the stairs only; more drawings and information are required to resolve other corrections.
Plan Reviewer's activity  11/13/2019  
DetailsBrian McGowan
Put drawings and engineering calculations for the front concrete stairs in the approved documents so Chris can print them off. I emailed him so he can upload/resubmit any new drawings and documents.
Plan Reviewer's activity  11/12/2019 DONE
DetailsBrian McGowan
Replied to Chris's email concerning a temp c of o and what is required for his permit being placed back into an "Issued" status.
Routing - PLAN CHECK11/4/2019 11/4/2019 FAIL
DetailsBrian McGowan
Routing - PLANNING10/31/2019 11/4/2019 FAIL
DetailsNicolette Womack
Building height cannot exceed 35' from finished grade.
Routing PW Grading-Hillside11/1/2019 11/1/2019 PASS
DetailsMelissa Jannusch
No changes to grading and drainage
Plan Reviewer's activity  11/1/2019  
DetailsBrian McGowan
Deleting files Chris uploaded on 10/25/19 without the Engineer's stamp and signature. Uploading the proper ones by versioning over the originally submitted plan sheets.
Plan Reviewer's activity  10/29/2019  
DetailsBrian McGowan
Sent Chris an email detailing what is needed for drawings in order for him to proceed with the construction of the stairs.
Routing - PLAN CHECK10/29/2019 10/29/2019 FAIL
DetailsBrian McGowan
Attempting to get enough info so he can continue building the stairs. Need stamp and signature of engineer and other items.
Plan Reviewer's activity  10/25/2019  
DetailsBrian McGowan
Returned Chris's phone call and emails. Told him he has a Task on his side to upload any new drawings and engineering, if it is not there, call me or a permit tech back.
Plan Reviewer's activity  10/15/2019 DONE
DetailsBrian McGowan
Spoke with Chris on the phone. Told him a video conference is not prefered. Also called his designer to help verify what the stair section needs to show.
Plan Reviewer's activity  10/10/2019  
DetailsBrian McGowan
Emailed and had phone conversations with Chris about meeting and stair design
Routing - PLAN CHECK10/9/2019 10/9/2019 FAIL
DetailsBrian McGowan
Routing - PLANNING10/8/2019 10/8/2019 FAIL
DetailsSue Cummings
Directional sign too big
Plan Reviewer's activity  9/5/2019  
DetailsBrian McGowan
Called and left a message for Dave at AHJ asking if he had been on site to verify the Garage ceiling height. His drawings still indicate and 8'-4" Garage ceiling. As per conversations with Chris, the ceiling height is actually 9'-4" and is not reflected in his sections/details.
I asked him to call me back.
Routing - PLAN CHECK9/5/2019 9/5/2019 FAIL
DetailsBrian McGowan
Did not resolve all issues.
Plan Reviewer's activity  9/5/2019  
Reassigned Planning to Jeff Lowe so he can Fail it in order to send it back to Chris for corrections before next Tuesday.
Sue can do her Review when she returns next week or when Chris resubmits.
Routing PW Grading-Hillside9/5/2019 9/5/2019 PASS
DetailsMelissa Jannusch
No changes to the grading and drainge
Routing PW Grading-Hillside8/29/2019 8/29/2019 PASS
DetailsMelissa Jannusch
GRADING PLAN MOD
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLAN CHECK8/28/2019 8/28/2019 FAIL
DetailsBrian McGowan
Corrections required. Still need the height of the Garage ceiling to be verified.
Routing - PLANNING8/20/2019 8/20/2019 FAIL
DetailsSue Cummings
Please provide correct stair on site plan (front and back) Thanks
Plan Reviewer's activity  8/12/2019  
DetailsBrian McGowan
Received email from Chris stating he was hoping to resubmit soon and asking if the plans need to be stamped and signed. I said yes.
Also received a phone call from his engineer verifying what we were looking for. I told him to treat it as a brand new Hillside submittal and stamp and sign the calculations, details and sheets as he would for a new Permit.
Plan Reviewer's activity  8/9/2019  
DetailsBrian McGowan
Spoke with Brandon about this Permit this morning. He asked if Chris had submitted any drawings. To date Chris has only submitted a Floor Plan showing the modified stairs, that the deck was concrete and an elevation view of the proposed stairs. No actual plans for the changes, no engineering, no details or engineering calculations as requested.
Routing - PLAN CHECK8/6/2019 8/6/2019 FAIL
DetailsBrian McGowan
Incomplete drawings and inforamtion
Plan Reviewer's activity  8/6/2019 
DetailsBrian McGowan
Meeting with Chris and Melissa. Explained what the city needs as far as resubmitted plans. The plans must reflect what he has built.
Plan Reviewer's activity  8/5/2019  
DetailsBrian McGowan
Email from Chris saying he is coming in today. He also sent some engineering for the stairs and a letter concerning the deck construction from an Engineer.
Plan Reviewer's activity  8/2/2019  
DetailsBrian McGowan
Email from Chris stating he was planning on coming in today. I told him I was only working until 1:00. He did not make it before then and did not reschedule.
Plan Reviewer's activity  7/31/2019  
DetailsBrian McGowan
Received email from Chris that he is coming in today to discuss his project.
Plan Reviewer's activity  7/30/2019  
Email from Chris requesting a meeting after my lunch (1:00). He did not show or email to reschedule.
Routing - MECHANICAL7/25/2019 7/25/2019 PASS
DetailsTroy James
Resubmitted manual j report
Plan Reviewer's activity  7/22/2019  
DetailsBrian McGowan
Recieved email from Chris saying he uploaded the requested drawings. I have no task on my end. The three sheets I did see will not be sufficient. Foundation plan was not signed, no footing details for porch, etc.
CHANGE STATUS TO (REV)  7/16/2019 DONE
Plan Modification Accepted  7/16/2019 DONE
per Brian for Chris Majors to submit plan mod for items discussed with Brandon
BLD-Conference7/15/20197/15/20197/15/2019PDONE
DetailsBrandon Shaw
No changes to the interior, no revisions needed...
Submit Geo soil subgrade to PW for review and approval, deck post footing and Main enrty stairs...
Submit revisions or Engineering approval for deck...
Main enrty stairs to be revised and submitted for approval...
CHANGE STATUS TO (ISS)  7/15/2019 DONE
Plan Reviewer's activity  7/10/2019  
DetailsBrian McGowan
On a site visit with Brandon today for a MIS several issues concerning the permit were apparent. Deck and exterior main stair design had been modified, grading plan not matching, additional stairs inside the home, additional ceiling height in the garage, exterior not stucco. I could not verify anything since no plans were on site. I sent an email to Brandon and cc Melissa and my supervisors.
OVERRIDE  6/20/2019  
Plan assigned to (BJM)6/18/20196/18/20196/20/2019 DONE
DetailsBrian McGowan
Routing - PLAN CHECK6/19/2019 6/20/2019 PASS
DetailsBrian McGowan
Plan Reviewer's activity  6/20/2019 DONE
DetailsBrian McGowan
Added (1) hour review fee (see sheet in agency docs)
Permit Ready to Issue  6/20/2019 DONE
plan mod
CHANGE STATUS TO (REV)  6/19/2019 DONE
per plan mod started on 6/18/19
Plan Reviewer's activity  6/18/2019  
DetailsBrian McGowan
Chris called and wants to make a plan modification of adding electrical, mechanical, insul and covering the previously proposed unfinished basement. I asked him to bring in a scope of work and a basement plan.
Plan Modification Accepted  6/18/2019 DONE
plan mod per brian
BLD-Energy code compliance3/28/20193/28/20193/28/2019PPASS
DetailsTony Young
Chris Phone #: ###-####
BLD-Framing/Rough-in3/27/20193/28/20193/28/2019APASS
DetailsTony Young
Chris Phone #: ###-####
BLD-Framing/Rough-in3/22/20193/22/20193/22/2019PPART
DetailsTony Young
Chris Phone #: ###-####,, interior ok to insulate,, exterior not ready,, unfinished basement living area
BLD-Framing/Rough-in3/20/20193/20/20193/20/2019PNR
DetailsTony Young
Chris Phone #: ###-####,, extensive walk through only,, needs trades,, needs engineer to clarify some of the shear
BLD-Conference3/18/20193/19/20193/19/2019APEND
DetailsTony Young
verify scope of work (garage area),, plans show an unfinished basement area,, plan notes that ADU is NOT allowed
BLD-Conference3/15/20193/18/20193/18/2019ADEFR
DetailsTony Young
verify scope of work (garage area)
BLD-Foundation12/18/201812/19/201812/19/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation12/17/201812/18/201812/18/2018ANR
DetailsMike Jordan
wall- Chris Phone #: ###-####
BLD-Footing12/13/201812/13/201812/13/2018PPASS
DetailsDave Hannah
late morning .. pour at 3 // Chris Phone #: ###-####
BLD-Footing12/12/201812/13/201812/13/2018ANR
DetailsDave Hannah
late morning .. pour at 3 // Chris Phone #: ###-####
PubWorks Subgrade Approval12/13/201812/13/201812/13/2018 DONE
DetailsMelissa Jannusch
All footings A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  12/3/2018  
Issue PAID IN FULL permit  12/3/2018 DONE
Permit Ready to Issue  12/3/2018 DONE
OVERRIDE  11/30/2018  
Plan assigned to (BJM)7/23/20187/23/201811/30/2018 DONE
DetailsBrian McGowan
08/09 sfd L2 ePlan - Corrections Required
Routing - PLAN CHECK11/30/2018 11/30/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/30/2018 DONE
DetailsBrian McGowan
Please add 3 hours of additional Plan review.
Permit Ready to Issue  11/30/2018 DONE
met
Plan Reviewer's activity  11/29/2018 DONE
DetailsBrian McGowan
Called The Engineer to verify the detail on A10.0 was accurate and left a message to return my call (it does not show alternating hooks to the footing). Chris (AHJ) called back and wanted to have the detail and the footing notes updated. Sent the project back for corrections.
Routing - PLAN CHECK11/29/2018 11/29/2018 FAIL
DetailsBrian McGowan
Plan Reviewer's activity  11/16/2018 DONE
DetailsBrian McGowan
Met with Chris this morning to personally show him what I am asking for regarding TOW, TOF, plans matching floor joist layouts, engineering, etc.
Routing - PLAN CHECK11/16/2018 11/16/2018 FAIL
DetailsBrian McGowan
Plan Reviewer's activity  10/16/2018  
DetailsBrian McGowan
Spoke with Chris and told him the floor truss layout needs to be given to his design to put on the plans. Those plans need to go back to the Engineer for review before he can resubmit.
Routing - PLAN CHECK10/12/2018 10/12/2018 FAIL
DetailsBrian McGowan
Need FIRE to verify Defensible space on Site Plan.
Routing - FIRE10/3/201810/3/201810/3/2018 PASS
DetailsTim Frost
Fire Sprinklers are required and SHALL be provided.
1st review completed  8/9/2018 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK7/23/2018 8/9/2018 FAIL
DetailsBrian McGowan
Routing - FIRE8/7/20188/7/20188/7/2018 FAIL
DetailsTim Frost
Fire flow is inadequate, Requires 2000 Gpm has 1000 Gpm
Sent email to contractor 8/07/2018.
Routing - FIRE7/23/20187/23/20187/25/2018 FAIL
DetailsTim Frost
8/03 New SFH L1 ePlan
Please, see attached review
Emailed review to contractor
Route to Impact Fee Review7/23/20187/26/20187/24/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Grading-Hillside7/23/2018 7/24/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - MECHANICAL7/23/2018 7/23/2018 PASS
DetailsTroy James
Routing - PLANNING7/23/2018 7/23/2018 FAIL
DetailsSue Cummings
inacurate site plan
Routing - Addressing7/23/2018 7/23/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/23/2018 7/23/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment7/23/2018 7/23/2018 PASS
DetailsMichael Zawacki
Foothills lot, site prep inspection required.
Intake Approval  7/23/2018 FAIL
DetailsChristina Prado
All prescreen items met, now needs to version the sheets
Plans ACCEPTED BY PLAN TECH  7/23/2018 DONE
Recd Pcfee & Taken To Pln CK  7/23/2018 DONE
Intake Approval  7/23/2018 PASS
DetailsChristina Prado
Intake Approval  7/20/2018 FAIL
1) Struc calcs for foundation and shear. 2)Fir out basement detail (insulation on basement concrete walls)
Intake Approval  7/18/2018 FAIL
1) Title page has 2012 IRC in notes and prescriptive table. 2)Insulation values need called out on cross section. 3)Full size ESC plan in drawings. 4) Struc calcs for foundation and shear. 5)Fir out basement detail (insulation on basement concrete walls). 6)WUI details for eaves, deck, cantilevered floor.
Application received  5/31/2018 DONE
Application submitted via PDS Online on May 31 2018 4:04PM
Routing PW Grading-Hillside8/21/2019    
Routing - PLANNING9/5/2019    
DetailsSue Cummings
I didn't know if you saw that this was back in our que.
Thought I would add you in on Tidemark to be sure.