BLD-Conference | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Mike Jordan
|
|
|
Travis Phone #: ###-####
|
BLD-Footing | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Mike Jordan
|
|
|
call for access-Rick Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/9/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2018 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 6/5/2018 | 6/5/2018 | 7/3/2018 | | DONE |
Rob Patrick
|
|
|
5/7 Patio Cover...6/6: Failed. Needs multiple details. 6/28..Requires Engineering.
|
Routing - PLAN CHECK | 7/3/2018 | | 7/3/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/3/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/28/2018 | | 6/28/2018 | | FAIL |
Rob Patrick
|
|
|
Project will require engineering.
|
1st review completed | | | 6/6/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 6/6/2018 | | 6/6/2018 | | FAIL |
Rob Patrick
|
|
|
|
Plan assigned to (JAB) Josh | 6/1/2018 | 6/1/2018 | 6/5/2018 | | DEFR |
Josh Bogle
|
|
|
due 5/7 - patio cover
|
Routing - PLANNING | 6/1/2018 | | 6/1/2018 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 6/1/2018 | | FAIL |
|
|
|
upload plans as separate sheets in drawings folder, plan sheets must be names according to info on sheet, provide cross section detail.
|
Intake Approval | | | 6/1/2018 | | FAIL |
|
|
|
1. Please Separate Existing roof plan into individual sheets.
2. Please provided a cross section of the patio as if you were looking at it from the side. (height of roof, post, connections, footings, depth, sheathing and roof cover)
|
Plans ACCEPTED BY PLAN TECH | | | 6/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/1/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/1/2018 | | DONE |
|
|
|
|
Application received | | | 5/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 31 2018 4:56PM
|