BLD-Final | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Correction SAT...
|
DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 4/23/2019 | 4/23/2019 | 4/23/2019 | A | FAIL |
Brandon Shaw
|
|
|
Continuity of handrail- no less than 1 1/2" between wall and handrail... Stair riser- greatest height within any flight of strairs not to exceed 3/8"... Window fall protection, no more than a 4" opening for windows more than 72" above grade, and less than 24" above floor...
|
BLD-Blower Door Test Results | 4/23/2019 | 4/23/2019 | 4/23/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 1.6
|
PubWorks Occupancy Approval | 4/19/2019 | 4/19/2019 | 4/19/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Correction SAT...
|
BLD-Framing/Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PEND |
Brandon Shaw
|
|
|
Pending corrections, see wall brace entry...
OK to insulate
|
BLD-Wall Bracing | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | FAIL |
Brandon Shaw
|
|
|
Fire block Mech. and fire place chase's... Hold downs to be nailed as per Man. recommendations... Interior shear walls to be as per plans... Blocking for PHF in be positively secured to beam...
|
BLD-Foundation | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/29/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
PubWorks Subgrade Approval | 7/19/2018 | 7/19/2018 | 7/19/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/27/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 6/1/2018 | 6/1/2018 | 6/27/2018 | | DONE |
Brian McGowan
|
|
|
6-20 sfd L2 paper
|
Routing - PLAN CHECK | | | 6/27/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 6/27/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/27/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/27/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Inspection Record Card- Bld | | | 6/27/2018 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2018 | | DONE |
|
|
|
called Doug Lasher and left vm permit is ready and fee due.
|
Routing - FIRE | | 6/1/2018 | 6/8/2018 | | PASS |
Tim Frost
|
|
|
6/20 New SFH R3 paper plan
|
Routing PW Grading-Hillside | 6/1/2018 | | 6/6/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - MECHANICAL | 6/6/2018 | | 6/6/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/6/2018 | | 6/6/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 6/1/2018 | | 6/6/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/6/2018 | | 6/6/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Route to Impact Fee Review | 6/1/2018 | 6/4/2018 | 6/4/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 6/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/1/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/1/2018 | | DONE |
|
|
|
|
Routing - Addressing | 6/1/2018 | | 6/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Sewer Rating | 6/1/2018 | | 6/1/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | 6/1/2018 | | | |
|
|
|
|