Information based on query as of Saturday, June 15, 2024.
Permit Information
Permit NumberBLD18-01943
StatusFinaled
Name ZAK CUTLER CONSTRUCTION
Site Address 10272 W ARNOLD RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2346 sq. ft., two story (first story 1580 sq. ft., second story 766 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 239 sq. ft. of covered patio/porch and a 737 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. Prescriptive Energy Code is proposed (Subnote k values). ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/2/201811/2/201811/2/2018PPASS
DetailsJim Sly
call for garage code // Zak Phone #: ###-####
DOC - Permit Finaled11/2/201811/2/201811/2/2018PPASS
DetailsJim Sly
BLD-Blower Door Test Results10/31/201811/2/201811/2/2018PDONE
DetailsJim Sly
call for garage code // Zak Phone #: ###-####
3.66
BLD-Blower Door Test Results10/30/201810/31/201810/31/2018ANR
DetailsTony Young
call for garage code // Zak Phone #: ###-####
BLD-Final10/30/201810/31/201810/31/2018APART
DetailsTony Young
call for garage code // Zak Phone #: ###-####,, all ok except needs blower door test,, also recomend that the address #s face the road
BLD-Final10/30/201810/30/201810/30/2018PDEFR
DetailsTony Young
call for garage code // Zak Phone #: ###-####
PAST DUE BALANCE10/26/201810/26/201810/30/2018 DONE
DetailsTony Young
Sewer fees due on SWR18-00764 prior to final occupancy.
Telephone call  10/30/2018 DONE
GC called to request final inspection-told him they were notified in July that there was still a few due-he's going to pay and then will call back in for the final
BLD-Energy code compliance8/22/20188/23/20188/23/2018APASS
DetailsJim Sly
Zak Phone #: ###-####
BLD-Framing/Rough-in8/21/20188/21/20188/21/2018PPASS
DetailsTony Young
Zack Phone #: ###-####
BLD-Wall Bracing8/1/20188/1/20188/1/2018PPASS
DetailsBrandon Shaw
Zak Phone #: ###-####
BLD-Wall Bracing7/31/20188/1/20188/1/2018ANR
DetailsMike Jordan
Zak Phone #: ###-####
BLD-Foundation6/28/20186/29/20186/29/2018APASS
DetailsTony Young
Sebastian Phone #: ###-####
BLD-Footing6/27/20186/28/20186/28/2018PPASS
DetailsJim Sly
1pm please- Zack Phone #: ###-####
OVERRIDE  6/27/2018  
Plan assigned to (BJM)6/1/20186/1/20186/27/2018 DONE
DetailsBrian McGowan
6-14 sfd L1 paper
Routing - PLAN CHECK6/7/2018 6/27/2018 PASS
DetailsBrian McGowan
Telephone call  6/27/2018 DONE
Zak called to see if this was ready-i told him it was and he could come pick it up
Issue PAID IN FULL permit  6/27/2018 DONE
1st review completed  6/27/2018 DONE
DetailsBrian McGowan
Case Summary (BLD)  6/27/2018 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  6/27/2018 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  6/27/2018 DONE
Permit Ready to Issue  6/27/2018 DONE
met
Routing - MECHANICAL6/12/2018 6/12/2018 PASS
DetailsTroy James
Routing - MECHANICAL6/1/2018 6/7/2018 FAIL
DetailsTroy James
emailed corrections to ryan vanderwood
Route to Impact Fee Review6/1/20186/4/20186/4/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING6/1/2018 6/1/2018 PASS
DetailsSue Cummings
Routing - Addressing6/1/2018 6/1/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/1/2018 6/1/2018 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  6/1/2018 DONE
Intake Approval  6/1/2018 PASS
Recd Pcfee & Taken To Pln CK  6/1/2018 DONE
Application received 6/1/2018