BLD-Final | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Jim Sly
|
|
|
Justin Phone #: ###-#### Blower door test 4.7
|
DOC - Permit Finaled | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | FAIL |
Jim Sly
|
|
|
Justin Phone #: ###-#### C/N....blower door and holes at Garage ceiling near furnace.....both units.
|
BLD-Energy code compliance | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Jim Sly
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | NR |
Jim Storey
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | FAIL |
Brandon Shaw
|
|
|
Corrections not all done... Fire caulk, not foam seal penetrations in fire wall, both sides... A6.1, details 3 and 4 not followed, need mineral wool or letter from Engineer of record approving as built...
|
BLD-Framing/Rough-in | 1/16/2019 | 1/17/2019 | 1/17/2019 | A | FAIL |
Brandon Shaw
|
|
|
Fire caulk all penetrations in fire wall... 3 ply truss to bear down to foundation... Provide strap at break in double top plate... Provide truss Engineering... As per pg A6.1, detail 4- install mineral wool at fire wall... See red paint...
|
BLD-Framing/Rough-in | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | FAIL |
Brandon Shaw
|
|
|
No plumbing permit showing for this address... No rough-in approved...
|
Issue PAID IN FULL permit | | | 7/16/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/2/2018 | | |
|
|
|
|
Plan assigned to (BJM) | | 6/1/2018 | 7/2/2018 | | DONE |
Brian McGowan
|
|
|
6-20 sfd-duplex L2 paper
|
Inspection Record Card- Bld | | | 7/2/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/2/2018 | | DONE |
|
|
|
Spoke with Justin informing him that this permit is ready and the fee amount due for issuance
|
1st review completed | | | 7/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/2/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/2/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 6/28/2018 | | 6/28/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 6/7/2018 | | 6/28/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 6/5/2018 | | 6/7/2018 | | FAIL |
Troy James
|
|
|
emailed corrections to integrity
|
Routing - PLANNING | 6/4/2018 | | 6/5/2018 | | PASS |
Todd Tucker
|
|
|
|
Route to Impact Fee Review | 6/1/2018 | 6/4/2018 | 6/4/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/1/2018 | | 6/4/2018 | | PASS |
Laura Hunter
|
|
|
Added additional address fee for duplex
Unit C: 8710 W Northview St
Unit D: 8704 W Northview St
|
Routing - PUBLIC WORKS | | | 6/4/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/1/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/1/2018 | | DONE |
|
|
|
|
Application received | | 6/1/2018 | | | |
|
|
|
|