BLD-Conference | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 2/1/2019 | 2/1/2019 | 2/6/2019 | | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | DONE |
Jim Sly
|
|
|
The plans are on the picnic table, please call if you have questions Phone #: ###-#### Inspection requested via web by Tim Frey Shear and Frame.......OK.
|
BLD-Foundation | 9/20/2018 | 9/20/2018 | 9/20/2018 | A | PASS |
Jim Sly
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 9/19/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Jim Sly
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
OVERRIDE | | | 8/23/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/23/2018 | | 8/23/2018 | | PASS |
Josh Bogle
|
|
|
modification of shop location
|
Case Summary (BLD) | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/23/2018 | | DONE |
|
|
|
Plan mod approved
|
CHANGE STATUS TO (ISS) | | | 8/23/2018 | | DONE |
|
|
|
|
BLD-Footing | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Jim Sly
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
OVERRIDE | | | 6/26/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 6/4/2018 | 6/4/2018 | 6/26/2018 | | PASS |
Josh Bogle
|
|
|
1st done - pole barn - needs engineering
|
Routing - PLAN CHECK | 6/26/2018 | | 6/26/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/26/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/26/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/26/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/4/2018 | | 6/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 6/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 6/4/2018 | | | |
|
|
|
|