BLD-Final | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Other | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | FAIL |
Brandon Shaw
|
|
|
Per detail A-A, pg A-5; 2hr wall to be 2 layers 5/8" Type-X Gypsum... OSB applied to studs, remove and apply as per plans...
|
BLD-Energy code compliance | 10/25/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Jim Storey
|
|
|
Insulation Inspection Phone #: ###-#### Inspection requested via web by Mike Cook
|
BLD-Framing/Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 | A | PART |
Jim Storey
|
|
|
nail hanger at stair support. ok to insulate
|
BLD-Other | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Soffit - Mike Phone #: ###-####
|
BLD-Wall Bracing | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Wall Bracing | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### house only
|
BLD-Footing | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Footing | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PASS |
Jim Storey
|
|
|
as close to noon as possible Mike Phone #: ###-####
|
BLD-Foundation | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
Place hold on job | 7/6/2018 | | 7/9/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
waiting for signed permit back
|
Issue PAID IN FULL permit | | | 7/5/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/27/2018 | | |
|
|
|
|
MISC ACTIONS | | | 6/27/2018 | | DONE |
|
|
|
Per MIS18-00248 demo bond amount $2,500.
|
Permit Ready to Issue | | | 6/27/2018 | | DONE |
|
|
|
met
|
Plan assigned to (RDP) | 6/6/2018 | 6/6/2018 | 6/26/2018 | | DONE |
Rob Patrick
|
|
|
6/19 sfd L1 ePlan...6/14 Failed: Corrections required...6/22 Failed for PFH detail.
|
Routing - PLAN CHECK | 6/26/2018 | | 6/26/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2018 | | DONE |
Rob Patrick
|
|
|
|
Routing - PLANNING | 6/22/2018 | | 6/25/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 6/25/2018 | | 6/25/2018 | | FAIL |
Rob Patrick
|
|
|
Needs to update Portal Frame Detail
|
Routing - PLAN CHECK | 6/22/2018 | | 6/22/2018 | | FAIL |
Rob Patrick
|
|
|
|
1st review completed | | | 6/14/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 6/6/2018 | | 6/14/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections required
|
Routing - MECHANICAL | 6/6/2018 | | 6/11/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 6/6/2018 | 6/9/2018 | 6/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 6/6/2018 | | 6/7/2018 | | FAIL |
Leon Letson
|
|
|
Driveways must be separated a minimum of 3' and an additional/different siding material is required for the 2nd story of each home per PUD17-00020.
|
Routing - Addressing | 6/6/2018 | | 6/6/2018 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/6/2018 | | 6/6/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/6/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/6/2018 | | DONE |
|
|
|
|
Application received | | | 6/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 5 2018 10:22AM
|
Intake Approval | | | 6/5/2018 | | FAIL |
|
|
|
NEED
2015 IECC
electircal plan
hand rail/headroom detail for stairs
crawl space/attic access
Site plan showing walk ways
|
Intake Approval | | | 6/5/2018 | | FAIL |
|
|
|
Please show measurements from walk ways/driveways to the property lines. Please show handrail location and measurement for stairs
|