BLD-Wall cover | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Tony Young
|
|
|
screened // Bill Phone #: ###-####
|
BLD-Wall cover | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Tony Young
|
|
|
Bill **cleared** Phone #: ###-####// needs bath fans ducted out prior to cover// ok to insulate
|
BLD-Framing/Rough-in | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | NR |
Tony Young
|
|
|
screened - home empty // Bill Phone #: ###-####// conf. walk through only
|
Routing - MECHANICAL | 3/2/2020 | | 3/2/2020 | | PASS |
Troy James
|
|
|
Manual j report submitted.
|
BLD-Wall Bracing | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PART |
Tony Young
|
|
|
Dale Phone #: ###-####,, garage exterior ok to cover
|
(F) Reprint permit | | | 11/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2019 | | DONE |
|
|
|
|
BLD-Conference | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PART |
Tony Young
|
|
|
call 1st,, patty,, check on status; Phone #: ###-####,, walk through with possible new buyer
|
BLD-Conference | 10/2/2018 | 10/4/2018 | 10/4/2018 | A | PART |
Tony Young
|
|
|
Please call ahead for access - Josh Phone #: ###-####,, frame walk through
|
BLD-Framing/Rough-in | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | NR |
Jim Sly
|
|
|
Josh Phone #: ###-####-call for access and plans Need Electrical
|
BLD-Footing | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/19/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/19/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/5/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 6/5/2018 | 6/5/2018 | 6/5/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/5/2018 | | 6/5/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/5/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/5/2018 | | DONE |
|
|
|
Need met
GC Form
|
Application received | | 6/5/2018 | | | |
|
|
|
|