PubWorks Subgrade Approval | 1/29/2020 | 1/29/2020 | 1/29/2020 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | A | DONE |
Bob Archibald
|
|
|
Bond received by PW
|
DOC - C/O Approved | | | 1/29/2020 | | DONE |
|
|
|
COC to be mailed to permit holder
|
BLD-Final | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PEND |
Bob Archibald
|
|
|
Bob Phone #: ###-####. Ok for final occupancy pending PW signoff
|
BLD-Aging Inspection | 8/22/2019 | 8/22/2019 | 8/28/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/23/2019 | 8/23/2019 | 8/26/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 4/9/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Tony Young
|
|
|
Bob, block wall prior to grout; Phone #: ###-####
|
BLD-Footing | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PART |
Tony Young
|
|
|
Bill-retaining wall Phone #: ###-####,, footing,, work in progress
|
PubWorks Subgrade Approval | 4/2/2019 | 4/2/2019 | 4/2/2019 | | DONE |
Melissa Jannusch
|
|
|
RETAINING WALL A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Framing/Rough-in | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PASS |
Tony Young
|
|
|
Sean Phone #: ###-####,, frame ok,, ok to insulate,, will foam all walls
|
Routing - MECHANICAL | 3/11/2019 | | 3/11/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Other | 2/21/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, soffit cover ok now
|
BLD-Conference | 2/21/2019 | 2/21/2019 | 2/22/2019 | P | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, soffit walk through,, nail off hangers,, needs elec pass,,
|
BLD-Wall Bracing | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | PASS |
Dave Hannah
|
|
|
Sean Phone #: ###-#### ok to cover ext
|
BLD-Foundation | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PASS |
Tony Young
|
|
|
Sean Phone #: ###-####
|
BLD-Footing | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 10/5/2018 | 10/8/2018 | 10/8/2018 | P | NR |
Tony Young
|
|
|
Phone #: ###-####
|
PubWorks Subgrade Approval | 10/8/2018 | 10/8/2018 | 10/8/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 10/5/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/5/2018 | | DONE |
|
|
|
as per JAB-no fees due-plan mod was to reduce sq ft of home
|
Inspection Record Card- Bld | | | 10/5/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2018 | | DONE |
|
|
|
as per JAB-no fees due as the house was reduced sq ft.-permit is in the new SFD drawers under S
|
Plan assigned to (M_H) | 9/18/2018 | | 10/5/2018 | | DONE |
Michael Hanson
|
|
|
Plan Modification
|
Routing - PLAN CHECK | 10/4/2018 | | 10/4/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/4/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2018 | | DONE |
Josh Bogle
|
|
|
Plan Mod fees waived because of reduced value of work, per conversation with applicant
|
Routing - FIRE | 9/28/2018 | 9/18/2018 | 10/1/2018 | | PASS |
Erika Akin
|
|
|
Fire flow of 2500 gpm sufficient for additional square footage
|
Routing - MECHANICAL | 10/1/2018 | | 10/1/2018 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 9/24/2018 | | 9/28/2018 | | FAIL |
Troy James
|
|
|
emailed corrections to heating supply
|
Routing - PUBLIC WORKS | 9/21/2018 | | 9/24/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 9/18/2018 | | 9/21/2018 | | PASS |
Melissa Jannusch
|
|
|
PLAT MOD APPROVED A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Plan Modification Accepted | | | 9/17/2018 | | DONE |
|
|
|
Making house 2,000 sqft smaller
|
Plan assigned to (M_H) | 6/5/2018 | | 7/9/2018 | | DONE |
Michael Hanson
|
|
|
06/22 sfd L2 paper. 1st review completed - See email from building, PW, and PW hillside for corrections required. MDH
|
OVERRIDE | | | 7/5/2018 | | |
|
|
|
|
OVERRIDE | | | 7/5/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 7/5/2018 | | DONE |
|
|
|
called Sean and told him permit is ready and fee due
|
Issue PAID IN FULL permit | | | 7/5/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/5/2018 | | 7/5/2018 | | PASS |
Josh Bogle
|
|
|
I finished this for Micheal - applicant chomping the bit
|
Inspection Record Card- Bld | | | 7/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/5/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/5/2018 | | DONE |
|
|
|
met
|
Routing - FIRE | 7/3/2018 | | 7/5/2018 | | PASS |
Tim Frost
|
|
|
Resubmittal SFH paper
|
Routing - MECHANICAL | 7/3/2018 | | 7/3/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing PW Grading-Hillside | 7/2/2018 | | 7/3/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PUBLIC WORKS | 7/3/2018 | | 7/3/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 6/26/2018 | | 7/2/2018 | | FAIL |
Melissa Jannusch
|
|
|
Dean,
Thanks for talking with me this morning about the project as a follow up to our conversation the following revisions are needed prior to approval of the building permit.
1. The roof drainage system cannot be piped across property lines to the privately owned stormwater pond. Please revise the drawing to eliminate the concentrated flow.
2. Please update the design infiltration rate
3. Please revise the groundwater clearance note to 60” of separation with ASTM C-33 sand as per the City’s stormwater manual.
4. For residential homes there is not inspection required on seepage beds from the City. The engineer’s letter of approval of the grading and drainage provided at the completion of the project is sufficient.
I have received the shallow injection well form and added it to the permit documents.
Please feel free to reach out to me with any questions.
Best,
Melissa
|
Routing - PUBLIC WORKS | 7/2/2018 | | 7/2/2018 | | FAIL |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 7/2/2018 | | DONE |
|
|
|
Three copies of C1.0 Grading and Drainage Plan, stamped and taken to public works for routing.
|
Plan resubmittals received | | | 6/29/2018 | | DONE |
|
|
|
two letters from Suez, two letters from beth lassenResidential Design, three copies of sheet A1.1. Taken to Mike H
|
Routing - FIRE | | | 6/25/2018 | | FAIL |
|
|
|
6/26 New SFH paper
The project is located within the WUI zone. Therefore, a 30' defensible space is required around the home. The east side does not have the required space.
|
Plan Reviewer's activity | | | 6/25/2018 | | DONE |
|
|
|
Email contractor failed Fire Code Plan Review
|
Plan resubmittals received | | | 6/25/2018 | | DONE |
|
|
|
Received two sets of sheet A3.3 and revised manual J; plans stamped and taken to M_H for review
|
Plan resubmittals received | | | 6/22/2018 | | DONE |
|
|
|
received two sets of infiltration testing documents; took to M_H for review
|
1st review completed | | | 6/22/2018 | | FAIL |
Michael Hanson
|
|
|
See email from building, PW, and PW hillside for corrections required. MDH
|
Routing - PLAN CHECK | 6/22/2018 | | 6/22/2018 | | FAIL |
Michael Hanson
|
|
|
See email from building, PW, and PW hillside for corrections required. MDH
|
Routing - MECHANICAL | 6/21/2018 | | 6/21/2018 | | FAIL |
Chad Schwendiman
|
|
|
Emailed corrections to Heating supply and applicant
|
Routing - Erosion and Sediment | 6/21/2018 | | 6/21/2018 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Certified PD and RP designated. Site preparation inspection required.
|
Plan resubmittals received | | | 6/21/2018 | | DONE |
|
|
|
Received two sets of revised site plan, three grading plans & two calculations for retaining wall; taken to M_H for review
|
Routing - PLANNING | 6/20/2018 | | 6/20/2018 | | PASS |
Nicolette Womack
|
|
|
CFH18-00044
|
Routing PW Grading-Hillside | 6/7/2018 | | 6/20/2018 | | FAIL |
Melissa Jannusch
|
|
|
e-mail and meeting with the applicant to discuss revisions 6-20-2018
|
Routing - PUBLIC WORKS | | | 6/20/2018 | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL
|
Route to Impact Fee Review | 6/6/2018 | 6/9/2018 | 6/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/6/2018 | | 6/7/2018 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 6/5/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/5/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/5/2018 | | DONE |
|
|
|
|
Application received | | 6/5/2018 | | | |
|
|
|
|