Permit NumberBLD18-01993
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 1897 S WINDSTAR PL
Project NameNelson Residence
Customer Number 
ePlanReviewNo
Description
***Prescriptive component energy approach*** WUI Zone A requirements*** Permit for the construction of a new 4533 sq. ft., three story (first story 2507 sq. ft., second story 777 sq. ft., basement 1249) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 480 sq. ft. of covered patio/porch and a 1009 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. MDH
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/11/20199/13/20199/13/2019APASS
DetailsBrandon Shaw
Just realized you need to look at exterior handrails please give 30 minutes notice Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled9/13/20199/13/20199/13/2019PPASS
DetailsBrandon Shaw
BLD-Final3/11/20193/11/20193/11/2019PPEND
DetailsDave Hannah
Please call me 30 minutes prior to going thank you Phone #: ###-#### Inspection requested via web by bryan murdoch inside of home is ok but needs ext gaurd rails and drive way
PubWorks Occupancy Approval3/6/20193/6/20193/6/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Conference3/4/20193/4/20193/4/2019PDONE
DetailsBrandon Shaw
Courtesy inspection please. Need to check over the home and discuss any bonds needed please. Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Final2/27/20193/1/20193/1/2019APEND
DetailsJim Sly
Need temporary occupancy until driveway can be poured due to weather Phone #: ###-#### Inspection requested via web by bryan murdoch
Need 2 Electr. Permits Finaled. Blessing from Public Works. and Bond.
BLD-Energy code compliance11/29/201811/29/201811/29/2018PPASS
DetailsDave Hannah
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in11/26/201811/26/201811/26/2018APART
DetailsDave Hannah
Framer said he took the truss engineering out there sorry about that Phone #: ###-#### Inspection requested via web by bryan murdoch ok to insulate c/n on site
BLD-Framing/Rough-in11/23/201811/23/201811/23/2018PPEND
DetailsBrandon Shaw
No Truss Engineering on site...
BLD-Wall Bracing11/20/201811/21/201811/21/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Foundation8/7/20188/8/20188/8/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing7/24/20187/25/20187/25/2018APASS
DetailsDave Hannah
Eric Phone #: ###-####
PubWorks Subgrade Approval7/16/20187/16/20187/16/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
OVERRIDE  7/11/2018  
Telephone call  7/11/2018 DONE
called Bryan and told him permit is ready and fee due.
Issue PAID IN FULL permit  7/11/2018 DONE
Inspection Record Card- Bld  7/11/2018 DONE
Routing - MECHANICAL7/11/2018 7/11/2018 PASS
DetailsChad Schwendiman
Permit Ready to Issue  7/11/2018 DONE
met
Routing - FIRE7/10/20187/10/20187/10/2018 FAIL
DetailsTim Frost
Routing - FIRE7/10/20187/10/20187/10/2018 PASS
DetailsTim Frost
Case Summary (BLD)  7/10/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/10/2018 DONE
DetailsMichael Hanson
Routing - PUBLIC WORKS7/10/2018 7/10/2018 PASS
DetailsMorgan Webb
Plan assigned to (M_H)6/5/2018 7/10/2018 DONE
DetailsMichael Hanson
06/22 sfd L2 Paper. 1st review completed - See my email and review documents from Fire, PW, PW hillside for corrections required. MDH
Routing - PLAN CHECK6/22/2018 7/10/2018 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside7/9/2018 7/9/2018 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
Routing - PLANNING6/29/2018 7/2/2018 PASS
DetailsLeon Letson
No Planning Review Required for Requested Changes
Plan resubmittals received  7/2/2018 DONE
resubmittals recieved 3 sets of C1 & calcs-talked to Carl M since M_H is out all week he said it was ok to take to PW because per Bryan resubmittal is for Melissa-took it to Melissa but she needs the whole permit so I emailed Carl M about it and set the resubmittals on Michaels chair
Routing PW Grading-Hillside6/27/2018 6/29/2018 FAIL
DetailsMelissa Jannusch
Doug,

I have received the resubmittals for BLD18-01993. Thank you for providing the retaining wall calculations. Please submit 3 copies of the updated grading and drainage plans to the PDS front counter. Each application must stand alone and have all the require documents, so although you have provided them for the grading permit application we will still need the updated plans to be submitted for the building permit as well.

Best,

Melissa
Routing - PUBLIC WORKS6/29/2018 6/29/2018 FAIL
DetailsMorgan Webb
SEE HILLSIDE FOR FAIL
Plan resubmittals received  6/28/2018 DONE
Resubmittals received 2 manuals, 2 letters from Suez & took to Michael
Routing Walk-In (Zoning)6/27/20186/27/20186/27/2018PPASS
DetailsLeon Letson
Resubmittal Approved
Plan resubmittals received  6/27/2018 DONE
Two copies of Structural Engineering packets. Took to Mike H
Plan resubmittals received  6/26/2018 DONE
Resubmittals received 2 ests of sheets A-101, A-102, A-103, S-101, S-107 & letter from engineer-took to M_H
1st review completed  6/22/2018 FAIL
DetailsMichael Hanson
See my email and review documents from Fire, PW, PW hillside for corrections required. MDH
Routing - PLAN CHECK6/5/2018 6/22/2018 FAIL
DetailsMichael Hanson
See my email and review documents from Fire, PW, PW hillside for corrections required. MDH
Routing - MECHANICAL6/5/2018 6/21/2018 FAIL
DetailsChad Schwendiman
A/C for (rest of house) is undersized. Emailed Legands Mechanical
Routing - PLANNING6/5/2015 6/21/2018 PASS
DetailsLeon Letson
Routing - FIRE6/19/2018 6/20/2018 FAIL
DetailsTim Frost
6/22 New SFH paper

See review
Application received 6/5/20186/19/2018 DONE
DetailsAndy J. Long
ESC plan approved. Certified RP listed. Site preparation inspection is REQUIRED prior to excavation.
Routing - Erosion and Sediment6/18/2018 6/19/2018 PASS
DetailsAndy J. Long
ESC plan approved. Certified RP listed. Site preparation inspection is REQUIRED prior to excavation. Please check edits on ESC site plan.
Routing - PUBLIC WORKS6/15/2018 6/18/2018 FAIL
DetailsMorgan Webb
Routing PW Grading-Hillside6/6/2018 6/15/2018 FAIL
DetailsMelissa Jannusch
E-mailed the applicant with revision requests. Discussed the drainage system revisions with the engineer.
Route to Impact Fee Review6/5/20186/8/20186/6/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing6/5/2018 6/6/2018 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  6/5/2018 DONE
Intake Approval  6/5/2018 PASS
Recd Pcfee & Taken To Pln CK  6/5/2018 DONE