BLD-Final | 9/11/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Just realized you need to look at exterior handrails please give 30 minutes notice Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PEND |
Dave Hannah
|
|
|
Please call me 30 minutes prior to going thank you Phone #: ###-#### Inspection requested via web by bryan murdoch inside of home is ok but needs ext gaurd rails and drive way
|
PubWorks Occupancy Approval | 3/6/2019 | 3/6/2019 | 3/6/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | DONE |
Brandon Shaw
|
|
|
Courtesy inspection please. Need to check over the home and discuss any bonds needed please. Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Final | 2/27/2019 | 3/1/2019 | 3/1/2019 | A | PEND |
Jim Sly
|
|
|
Need temporary occupancy until driveway can be poured due to weather Phone #: ###-#### Inspection requested via web by bryan murdoch Need 2 Electr. Permits Finaled. Blessing from Public Works. and Bond.
|
BLD-Energy code compliance | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Dave Hannah
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 11/26/2018 | 11/26/2018 | 11/26/2018 | A | PART |
Dave Hannah
|
|
|
Framer said he took the truss engineering out there sorry about that Phone #: ###-#### Inspection requested via web by bryan murdoch ok to insulate c/n on site
|
BLD-Framing/Rough-in | 11/23/2018 | 11/23/2018 | 11/23/2018 | P | PEND |
Brandon Shaw
|
|
|
No Truss Engineering on site...
|
BLD-Wall Bracing | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 8/7/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
PubWorks Subgrade Approval | 7/16/2018 | 7/16/2018 | 7/16/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 7/11/2018 | | |
|
|
|
|
Telephone call | | | 7/11/2018 | | DONE |
|
|
|
called Bryan and told him permit is ready and fee due.
|
Issue PAID IN FULL permit | | | 7/11/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/11/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 7/11/2018 | | 7/11/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Permit Ready to Issue | | | 7/11/2018 | | DONE |
|
|
|
met
|
Routing - FIRE | 7/10/2018 | 7/10/2018 | 7/10/2018 | | FAIL |
Tim Frost
|
|
|
|
Routing - FIRE | 7/10/2018 | 7/10/2018 | 7/10/2018 | | PASS |
Tim Frost
|
|
|
|
Case Summary (BLD) | | | 7/10/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - PUBLIC WORKS | 7/10/2018 | | 7/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan assigned to (M_H) | 6/5/2018 | | 7/10/2018 | | DONE |
Michael Hanson
|
|
|
06/22 sfd L2 Paper. 1st review completed - See my email and review documents from Fire, PW, PW hillside for corrections required. MDH
|
Routing - PLAN CHECK | 6/22/2018 | | 7/10/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Grading-Hillside | 7/9/2018 | | 7/9/2018 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
|
Routing - PLANNING | 6/29/2018 | | 7/2/2018 | | PASS |
Leon Letson
|
|
|
No Planning Review Required for Requested Changes
|
Plan resubmittals received | | | 7/2/2018 | | DONE |
|
|
|
resubmittals recieved 3 sets of C1 & calcs-talked to Carl M since M_H is out all week he said it was ok to take to PW because per Bryan resubmittal is for Melissa-took it to Melissa but she needs the whole permit so I emailed Carl M about it and set the resubmittals on Michaels chair
|
Routing PW Grading-Hillside | 6/27/2018 | | 6/29/2018 | | FAIL |
Melissa Jannusch
|
|
|
Doug,
I have received the resubmittals for BLD18-01993. Thank you for providing the retaining wall calculations. Please submit 3 copies of the updated grading and drainage plans to the PDS front counter. Each application must stand alone and have all the require documents, so although you have provided them for the grading permit application we will still need the updated plans to be submitted for the building permit as well.
Best,
Melissa
|
Routing - PUBLIC WORKS | 6/29/2018 | | 6/29/2018 | | FAIL |
Morgan Webb
|
|
|
SEE HILLSIDE FOR FAIL
|
Plan resubmittals received | | | 6/28/2018 | | DONE |
|
|
|
Resubmittals received 2 manuals, 2 letters from Suez & took to Michael
|
Routing Walk-In (Zoning) | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Leon Letson
|
|
|
Resubmittal Approved
|
Plan resubmittals received | | | 6/27/2018 | | DONE |
|
|
|
Two copies of Structural Engineering packets. Took to Mike H
|
Plan resubmittals received | | | 6/26/2018 | | DONE |
|
|
|
Resubmittals received 2 ests of sheets A-101, A-102, A-103, S-101, S-107 & letter from engineer-took to M_H
|
1st review completed | | | 6/22/2018 | | FAIL |
Michael Hanson
|
|
|
See my email and review documents from Fire, PW, PW hillside for corrections required. MDH
|
Routing - PLAN CHECK | 6/5/2018 | | 6/22/2018 | | FAIL |
Michael Hanson
|
|
|
See my email and review documents from Fire, PW, PW hillside for corrections required. MDH
|
Routing - MECHANICAL | 6/5/2018 | | 6/21/2018 | | FAIL |
Chad Schwendiman
|
|
|
A/C for (rest of house) is undersized. Emailed Legands Mechanical
|
Routing - PLANNING | 6/5/2015 | | 6/21/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - FIRE | 6/19/2018 | | 6/20/2018 | | FAIL |
Tim Frost
|
|
|
6/22 New SFH paper
See review
|
Application received | | 6/5/2018 | 6/19/2018 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Certified RP listed. Site preparation inspection is REQUIRED prior to excavation.
|
Routing - Erosion and Sediment | 6/18/2018 | | 6/19/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP listed. Site preparation inspection is REQUIRED prior to excavation. Please check edits on ESC site plan.
|
Routing - PUBLIC WORKS | 6/15/2018 | | 6/18/2018 | | FAIL |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 6/6/2018 | | 6/15/2018 | | FAIL |
Melissa Jannusch
|
|
|
E-mailed the applicant with revision requests. Discussed the drainage system revisions with the engineer.
|
Route to Impact Fee Review | 6/5/2018 | 6/8/2018 | 6/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/5/2018 | | 6/6/2018 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/5/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/5/2018 | | DONE |
|
|
|
|