Second Notice | | 9/16/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
First Notice | 8/16/2018 | 8/16/2018 | 9/6/2018 | | DONE |
Jim Storey
|
|
|
Mailed 9-10-18
|
BLD-Final | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Jim Storey
|
|
|
Shane Phone #: ###-####
|
DOC - Permit Finaled | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Jim Page
|
|
|
Fire alarm inspection complete, no fire sprinkler modifications, fire extinguishers are placed with current inspection tags, knox box is located by the front main entry on the east side. Final life fire safety nispection complete for area of work.
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Jim Storey
|
|
|
Shane Phone #: ###-####
|
Plan assigned to (RMH) | 7/9/2018 | 7/9/2018 | 7/10/2018 | | PASS |
Ron Hill
|
|
|
ECI - Tenant Improvement ePlan**
|
1st review completed | | | 7/10/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
MET
Need
GC Form
Revised Cert of Value
|
Issue PAID IN FULL permit | | | 7/10/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/10/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/29/2018 | | 7/10/2018 | | PASS |
Javier Guzman
|
|
|
|
Plan assigned to (JG) | 6/29/2018 | 6/29/2018 | 7/9/2018 | | DEFR |
Javier Guzman
|
|
|
7/05 L1 ECI - Tenant Improvement ePlan**
|
Intake Approval | | | 6/29/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 6/29/2018 | | 6/29/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/29/2018 | | 6/29/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 6/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2018 10:02AM
|
Intake Approval | | | 6/7/2018 | | FAIL |
Brian McGowan
|
|
|
Form # 304 not included.
The addition of a wall requires wall schedule and bracing method.
Please provide dimensions on the Floor Plan.
The doors are labeled but no door schedule was provided.
No symbol schedule was provided for the Electrical Plan specifying what the symbols stand for.
|