Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-02047
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 720 E PARK BLVD Unit: B102
Project NameSt Lukes WGCP - Suite #B102
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGCP - BASEMENT SUITE #B102) Permit is to remodel an existing 727 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select suspended ceiling, construction of interior non-bearing walls to create a demising walls, select new door/doorframe, millwork, select new suspended acoustic ceiling, light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/11/20192/18/2019 DONE
This permit finaled on the web by Curtis Weedop
Third Notice 1/13/20192/6/2019 DONE
emailed curtis 2-6-19
Second Notice 12/24/20181/8/2019 DONE
emailed value to curtis
First Notice 12/8/201812/14/2018 DONE
MAILED 12-17
Print Occupancy Form  11/28/2018 DONE
Permanent Occupancy  11/28/2018 DONE
BLD-Final9/25/20189/25/20189/25/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rocky donica
FIRE-Final Inspection9/24/20189/24/20189/24/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Ceiling Grid Inspection8/21/20188/21/20188/21/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rocky donica
BLD-Framing/Rough-in7/24/20187/24/20187/24/2018PPASS
DetailsDave Hannah
Zac Phone #: ###-####
Issue PAID IN FULL permit  7/13/2018 DONE
Print Occupancy Form  7/13/2018 DONE
Print Occupancy Form  7/13/2018 DONE
Plan assigned to (JG)6/13/20186/13/20186/20/2018 PASS
DetailsJavier Guzman
6/19 L1 WGCP - Bsmnt Rev Cyc Mail Rm ePlan pend mech
Routing - PLAN CHECK6/13/2018 6/20/2018 PASS
DetailsJavier Guzman
Routing - MECHANICAL6/13/2018 6/20/2018 PASS
DetailsTroy James
1st review completed  6/20/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/20/2018 DONE
Permit Ready to Issue  6/20/2018 DONE
Need - all met
GC Form
Revised Cert of Value
Routing - Addressing6/13/2018 6/13/2018 PASS
DetailsDoug Chausow
Suite B102
Routing - PUBLIC WORKS6/13/2018 6/13/2018 PASS
DetailsRachael Beierle
Intake Approval  6/13/2018 PASS
DetailsJavier Guzman
Intake Approval  6/11/2018 FAIL
DetailsJulie Romig
Need: 1. Stamped/sign all architectural drawings.
2. Door numbers on hardware schedule do not match plan. Hardware sets are not identified on door schedule. Provide missing information.
Application received  6/8/2018 DONE
Application submitted via PDS Online on Jun 8 2018 2:54PM