BLD-Final | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 12/18/2018 | 12/18/2018 | 12/18/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Wall cover | 10/5/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Dave Hannah
|
|
|
David Phone #: ###-#### c/n on site fire blk furred out walls
|
BLD-Other | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Dave Hannah
|
|
|
fire rated sheetrock // David Phone #: ###-####
|
BLD-Wall Bracing | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to cover exterior
|
BLD-Foundation | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Dave Hannah
|
|
|
wall // Tim Phone #: ###-####
|
BLD-Footing | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
PubWorks Subgrade Approval | 7/31/2018 | 7/31/2018 | 7/31/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | CANC |
Dave Hannah
|
|
|
Tim Phone #: ###-#### needs hillside geo tec report
|
OVERRIDE | | | 7/10/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/13/2018 | 6/13/2018 | 7/10/2018 | | PASS |
Josh Bogle
|
|
|
1st done - Hillside addition
|
Issue PAID IN FULL permit | | | 7/10/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/9/2018 | | 7/10/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/14/2018 | | 6/21/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills remodel. Site prep inspection meeting with RP required.
|
1st review completed | | | 6/21/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 6/13/2018 | | 6/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing - PLAN CHECK | 6/13/2018 | | 6/18/2018 | | FAIL |
Josh Bogle
|
|
|
needs 2015 engineering, ES reports, class A roof, one-hour rated walls at reduced setback, rear stoop?
|
Routing - PUBLIC WORKS | 6/13/2018 | | 6/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 6/13/2018 | | 6/13/2018 | | PASS |
Jeff Lowe
|
|
|
pursuant to CVA17-00029
|
Plans ACCEPTED BY PLAN TECH | | | 6/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2018 | | DONE |
|
|
|
no fees paid at intake
|
Application received | | | 6/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 8 2018 3:29PM
|