BLD-Aging Inspection | 5/29/2020 | 5/29/2020 | 6/3/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/28/2020 | 5/28/2020 | 5/29/2020 | | DONE |
Tony Young
|
|
|
|
BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Dave Hannah
|
|
|
call for access, Mark Phone #: ###-####
|
BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | P | PART |
Tony Young
|
|
|
call for access, Mark Phone #: ###-####,, needs zoning
|
FIRE-Final Inspection | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is compete, signature card not found at time of inspection.
call for access, Mark Phone #: ###-####
|
FIRE-Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 | A | DONE |
Jim Page
|
|
|
Allowed 1 double keyed deadbolt for building, recommend using wets door for employee entrance and leave signage that is in place. North door that was existing on door schedule was changed, due to newer door it has to meet IFC 2015 edition requirements listed under 1010.1.9.
|
FIRE-Final Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | CANC |
Jim Page
|
|
|
Request was for a conference, this request is cancelled.
call for access / Mark Phone #: ###-####
|
FIRE-Final Inspection | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | FAIL |
Jim Page
|
|
|
Provide code compliant door hardware on the north and the west exit dooes, both doors have thumbturn deadbolts, a double key deadbolt is allowed on the door that will be the main entry. Provide annual inspection for fire extinguishers as discussed.
call for access code // Mark Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/19/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/18/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 12/9/2019 | 12/9/2019 | 12/18/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - Plan Mod Mossman Law Office - plan mod reflects the removal of the loft space, spiral stair and associated railings. This reduces the occupant load by 1
Modified the handrail extension that exteded in to hall #103
|
Routing - PLAN CHECK | 12/16/2019 | | 12/18/2019 | | PASS |
Julie Romig
|
|
|
Plan Mod 2nd Review
|
Permit Ready to Issue | | | 12/18/2019 | | DONE |
|
|
|
PLAN MOD DO NOT REISSUE
|
Routing - PLAN CHECK | 12/16/2019 | | 12/16/2019 | | FAIL |
Julie Romig
|
|
|
Plan Mod 12/10/19 - 1st Review - Refer to changemarks in ePlanReview
|
Plan Modification Accepted | | | 12/9/2019 | | DONE |
|
|
|
plan mod #4 request to open via Brian Garrett
|
Zoning Approval | 12/5/2019 | 12/5/2019 | 12/5/2019 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete.
Mark -please if possible call prior Phone #: ###-####
|
BLD-Conference | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PART |
Tony Young
|
|
|
Call ahead // Mark Phone #: ###-####,, general ?s,, architect may revise plans and re-submit
|
BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Brandon Shaw
|
|
|
call before coming- Mark Phone #: ###-####
|
BLD-Conference | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | DONE |
Dave Hannah
|
|
|
MARK Phone #: ###-####
|
BLD-Conference | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PEND |
Tony Young
|
|
|
Mark- please call for access to meet at site Phone #: ###-####..?s on storage room/loft headroom
|
BLD-Wall Bracing | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 5/23/2019 | | DONE |
|
|
|
PLAN MOD
|
OVERRIDE | | | 5/22/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 5/22/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JAR) | 4/25/2019 | 4/25/2019 | 5/21/2019 | | DONE |
Julie Romig
|
|
|
05/16 - Plan Mod Mossman Law Office Deferred Submittal for Stairs
|
Routing - PLAN CHECK | 5/3/2019 | | 5/21/2019 | | PASS |
Julie Romig
|
|
|
Plan Mod for Sprail Stair Engineering Deferred Submittal
|
Plan Modification Accepted | | | 4/25/2019 | | DONE |
|
|
|
Show detailied information pertaining to the spiral stair and handrail
|
OVERRIDE | | | 3/18/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 1/25/2019 | 1/25/2019 | 3/18/2019 | | DONE |
Julie Romig
|
|
|
03/07 - 1st Rev Comp - 3rd Rev - Plan Mod Mossman Law Office 2nd Flr Loft
|
Print Occupancy Form | | | 3/18/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/18/2019 | | DONE |
|
|
|
PLAN MOD
|
Routing - PLAN CHECK | 3/13/2019 | | 3/18/2019 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 3/18/2019 | | DONE |
|
|
|
Plan mod please do not re issue
need rev cert of val
|
Routing - PLAN CHECK | 3/5/2019 | | 3/6/2019 | | FAIL |
Julie Romig
|
|
|
|
BLD-Foundation | 2/21/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Tony Young
|
|
|
rebar for basement- Mike Phone #: ###-####,, upper section of masonary wall ok
|
Routing - PLAN CHECK | 1/28/2019 | | 2/14/2019 | | FAIL |
Julie Romig
|
|
|
Plan Mod #2 - 1st Review
|
Routing - FIRE | 1/28/2019 | 1/28/2019 | 2/13/2019 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing Off Site - STRUCTURAL | 1/28/2019 | | 2/12/2019 | | PASS |
|
|
|
AHJ
|
Routing - MECHANICAL | 1/28/2019 | | 2/4/2019 | | PASS |
Troy James
|
|
|
|
BLD-Foundation | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PART |
Tony Young
|
|
|
Mike-this insp has nothing to do woithg the plan mod on permit Phone #: ###-####,, 1st 4' 8" of masonary wall,, 2 bond beams included
|
Routing - PLUMBING | 1/28/2019 | | 1/31/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 1/28/2019 | | 1/29/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00556 and DRH17-0056
|
Plan Modification Accepted | | | 1/25/2019 | | DONE |
|
|
|
Alter the remodel and addition application to include a 241 sq. ft. loft above the new office
|
BLD-Footing | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PART |
Tony Young
|
|
|
Ready close to noon // James Phone #: ###-####,, work in progress,, ok,, will provide cold weather concrete provisions
|
CHANGE STATUS TO (ISS) | | | 12/11/2018 | | DONE |
|
|
|
paid plan mod fees
|
Print Occupancy Form | | | 12/11/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 12/10/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 11/7/2018 | 11/7/2018 | 12/10/2018 | | DONE |
Julie Romig
|
|
|
*12/06 - IBC Rev Comp - 2nd Rev - 1st Rev Comp - Plan Mod Mossman Law Office - Foundation Revisions
|
Permit Ready to Issue | | | 12/10/2018 | | DONE |
|
|
|
Plan MOd-do not issue-need cert of val for plan mod
|
Routing Off Site - STRUCTURAL | 11/30/2018 | | 12/7/2018 | | PASS |
Julie Romig
|
|
|
AHJ
|
Routing - PLAN CHECK | 11/30/2018 | | 12/6/2018 | | PASS |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 11/13/2018 | | 11/27/2018 | | FAIL |
Julie Romig
|
|
|
AHJ
|
Routing - PLAN CHECK | 11/13/2018 | | 11/26/2018 | | FAIL |
Julie Romig
|
|
|
Comments emailed to architect.
|
Routing - Design Review | 11/13/2018 | | 11/13/2018 | | PASS |
KayCee Babb
|
|
|
Foundation Revisions: The new foundation shall not result in the structure being taller than previously constructed. The footprint of the building shall not be altered beyond the approved addition. Plans redlined.
|
Plan Modification Accepted | | | 11/7/2018 | | DONE |
|
|
|
Alter the remodel and addition application to include a full, instead of partial footing and foundation demolition and rebuild. this allows us to pour additional office. We are also adding a few beam to support roof and floor joists that were discovered to be non continuous in the demolition process
|
Issue PAID IN FULL permit | | | 9/27/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/27/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/20/2018 | | 9/11/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Interior and exterior TI. ESC site preparation inspection required. RP listed is expired, should become a Interim RP.
|
Plan assigned to (JAR) | 6/20/2018 | 6/20/2018 | 9/10/2018 | | DONE |
Julie Romig
|
|
|
09/07 - 2nd Rev - 1st Rev Comp - L3 Mossman Law
|
Routing - PLAN CHECK | 9/4/2018 | | 9/10/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/10/2018 | | DONE |
|
|
|
MET
NEED
GC FORM
REVISED VALUE
|
Routing - PLANNING | 9/7/2018 | | 9/7/2018 | | PASS |
KayCee Babb
|
|
|
per DRH17-00561 revised 9-7-18
|
Routing - PLUMBING | 9/4/2018 | | 9/4/2018 | | PASS |
Daryl Spivey
|
|
|
See red line marks and install per ISPC.
|
Route to Impact Fee Review | 8/8/2018 | 8/11/2018 | 8/9/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 6/20/2018 | | 8/8/2018 | | FAIL |
Julie Romig
|
|
|
|
1st review completed | | | 8/8/2018 | | DONE |
Julie Romig
|
|
|
|
Routing - FIRE | 6/20/2018 | 6/20/2018 | 7/19/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 6/20/2018 | | 7/4/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 6/20/2018 | | 6/28/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 6/20/2018 | | 6/21/2018 | | PASS |
Brian Murphy
|
|
|
bld < 1000sqft existing parking lot
|
Routing PW Street Lights | 6/20/2018 | | 6/21/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 6/20/2018 | | 6/20/2018 | | PASS |
KayCee Babb
|
|
|
per DRH17-00561
|
Routing - PLUMBING | 6/20/2018 | | 6/20/2018 | | FAIL |
Bill VanDegrift
|
|
|
breakroom sink is below waste line in this area, rout to sump in storage room.
|
Routing - PLANNING | 6/20/2018 | | 6/20/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 6/20/2018 | | 6/20/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2018 | | 6/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 6/20/2018 | | PASS |
|
|
|
|
Intake Approval | | | 6/16/2018 | | FAIL |
Julie Romig
|
|
|
Need 1. Completed 520 checklist and any additional information as required by checklist.
3. Rotate all structural sheets to horizontal and reupload.
|
Intake Approval | | | 6/14/2018 | | FAIL |
Julie Romig
|
|
|
Need 1. Completed 520 checklist and any additional information as required by checklist.
2. Erosion and Sediment Control Plan is only one page. Please upload complete document and ESC plan.
3. Rotate all structural sheets to horizontal and reupload.
|
Application received | | | 6/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 11 2018 11:59AM
|