BLD-Final | 10/22/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Tell Riley
|
|
|
Patrick Phone #: ###-####//final complete per plans//trades finals complete//
|
DOC - Permit Finaled | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 3/28/2019 | 3/28/2019 | 3/29/2019 | | CANC |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Jim Sly
|
|
|
after 9 am please- Patrick Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Jim Sly
|
|
|
Patrick Phone #: ###-#### Frame and Shear.....OK
|
BLD-Framing/Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | NR |
Brandon Shaw
|
|
|
Need trades rough in
|
BLD-Foundation | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PART |
Jim Sly
|
|
|
Patrick Phone #: ###-#### Select CMU walls ...verified rebar in place.
|
BLD-Footing | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Jim Sly
|
|
|
Patrick Phone #: ###-####
|
Routing Walk-In (BLD) | 7/3/2018 | 7/3/2018 | 7/3/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/3/2018 | 7/3/2018 | 7/3/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/3/2018 | | 7/3/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/3/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2018 | | DONE |
Josh Bogle
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/3/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/3/2018 | | DONE |
|
|
|
walk in plan mod for JAB-changing basement floor plan
|
OVERRIDE | | | 6/19/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/19/2018 | 6/19/2018 | 6/19/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/19/2018 | | 6/19/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/19/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/19/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | FAIL |
Josh Bogle
|
|
|
plans need more detail
|
Routing Walk-In (BLD) | 6/12/2018 | 6/12/2018 | 6/12/2018 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/12/2018 | | 6/12/2018 | | FAIL |
Josh Bogle
|
|
|
lacking structural details
|
1st review completed | | | 6/12/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Application received | | 6/11/2018 | | | |
|
|
|
|