BLD-Framing/Rough-in | 6/28/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Jim Sly
|
|
|
Crystal Phone #: ###-#### Electrical and new Gas Line pressure test OK. Range hood duct was listed on Mech permit........No duct installed......they said they were going to rock over hole?
|
Routing Walk-In (BLD) | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/11/2018 | | 6/11/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/11/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/11/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/11/2018 | | DONE |
|
|
|
|
Application received | | 6/11/2018 | | | |
|
|
|
|