Permit Information
Permit NumberBLD18-02078
StatusFinaled
Name IDAHO TOWER CONSTRUCTION CO
Site Address 621 N ALLUMBAUGH ST
Project NameAT&T Allumbaugh St.
Customer Number 
ePlanReviewYes
Description
(AT&T CELL TOWER - ALLUMBAUGH) Permit for the modifications to the existing monopole cell tower with work to include: Install (2) +24VCD to -48VDC converter shelves (NEQ. 13289). Install (7) +24VDC converter modules (NEQ.12371). Install (3) 30A, 1-pole, -48VDC breakers for the (P) RRHs. Replace (3) SBNHH-1D65C antennas w/ (3) Kathrein 800-10992K antennas. Replace (3) airscale dual RRH 4T4R B12/14 320W AHLBA RRHs. No changes to the heights of the tower. There will be minor equipment modifications with in the existing equipment area. Structural engineering and plans provided. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice3/1/20193/1/20194/16/2019 DONE
DetailsJim Sly
This permit finaled on the web by Dwayne Robinson
BLD-Final2/28/20193/1/20193/1/2019APASS
DetailsJim Sly
Jake Phone #: 2###-####
DOC - Permit Finaled3/1/20193/1/20193/1/2019PPASS
DetailsJim Sly
Issue PAID IN FULL permit  6/29/2018 DONE
Inspection Record Card- Bld  6/29/2018 DONE
Plan assigned to (M_H)6/14/2018 6/27/2018 DONE
DetailsMichael Hanson
06/26 #518 L2 ATT Wireless ePlan. 1st review completed waiting for appeals period to lapse. MDH
Routing - PLANNING6/27/2018 6/27/2018 PASS
DetailsNicolette Womack
PLANS/APPL TAKEN TO FRONT DESK  6/27/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/27/2018 DONE
met
Route to Impact Fee Review6/20/20186/23/20186/21/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  6/20/2018 DONE
DetailsMichael Hanson
Routing - PLAN CHECK6/14/2018 6/20/2018 PASS
DetailsMichael Hanson
Routing - PLANNING6/14/2018 6/15/2018 FAIL
DetailsNicolette Womack
Appeal Period does not end until June 21st.
Plan assigned to (JG)6/14/20186/14/20186/14/2018 DEFR
DetailsJavier Guzman
6/26 L2 ATT Wireless ePlan
Intake Approval  6/14/2018 PASS
DetailsJavier Guzman
Application received  6/12/2018 DONE
Application submitted via PDS Online on Jun 12 2018 7:20AM