BLD-Final | 2/26/2019 | 2/28/2019 | 2/28/2019 | A | DONE |
Tony Young
|
|
|
Final case if work complete. No further PW inspections required.
|
DOC - Permit Finaled | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Conference | 11/28/2018 | 11/30/2018 | 11/30/2018 | A | PEND |
Tony Young
|
|
|
Check status// wall is mostly completed,, I have a picture if needed
|
PubWorks Subgrade Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 6/25/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/14/2018 | 6/14/2018 | 6/20/2018 | | PASS |
Josh Bogle
|
|
|
due 6/20 - Hillside retaining wall, keystones
|
Routing - PLAN CHECK | | | 6/20/2018 | | PASS |
Josh Bogle
|
|
|
|
Telephone call | | | 6/20/2018 | | DONE |
|
|
|
called Mark to let know permit is ready and how much is owed-left message on phone
|
1st review completed | | | 6/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/20/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/20/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/18/2018 | | 6/19/2018 | | PASS |
Michael Zawacki
|
|
|
Hillside lot. Please update work dates in ESC narrative. Please print map on 11x17, half has been cut off.
|
Routing - PUBLIC WORKS | 6/15/2018 | | 6/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 6/14/2018 | | 6/15/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing - Addressing | 6/14/2018 | | 6/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing Walk-In (Zoning) | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | FAIL |
Josh Bogle
|
|
|
needed larger copies for legibility
|
Application received | | 6/12/2018 | | | |
|
|
|
|