Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-02099
StatusIssued
Name ZELHAM INC
Site Address 245 S CAPITOL BLVD
Project NameGrove Hotel
Customer Number 
ePlanReviewYes
Description
(GROVE HOTEL) ::PLAN MODIFICATION #2 FOR THE INSTALLATION OF MAKEUP AIR UNITS"" PLAN MODIFICATION FOR A BAR AREA ON THE SECOND STORY AND THE ADDITION OF WALK-IN COOLERS ON THE FIRST STORY."" The bar on the second floor is not a public access bar with the public waited on by hotel and arena staff with public sales not occuring at the bar. Permit for tenant improvements to the lobby, kitchen and dining/bar areas of the existing Grove Hotel. The scope of work includes approx. 12,000 square feet of the existing space. Work to include demolition of non-bearing interior partition walls, existing vestibule, interior doors, and other minor interior elements. Construction to include new main entry vestibule, new non-bearing interior partition walls and glazing walls, interior lighting, new finishes, new bar area, and new restaurant layout and design. With improvements to electrical systems, HVAC systems, and plumbing systems. This building has a post tensioned slab and is required to have the tendons located prior to any penetraions of the slab being made. This building is fully fire sprinklered and alarmed. Any alterations to the sprinkler or alarm system are required to comply with NFPA 13 as 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/201812/19/201812/19/2018PPASS
DetailsDave Hannah
2nd floor bar Phone #: ###-#### Inspection requested via web by Steve Jones
BLD-Framing/Rough-in10/29/201810/30/201810/30/2018APASS
DetailsDave Hannah
2nd floor bar Phone #: ###-#### Inspection requested via web by Steve Jones
BLD-Final10/18/201810/19/201810/19/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Steve Jones
FIRE-Final Inspection10/18/201810/19/201810/19/2018APASS
DetailsJim Page
Previously noted items have been corrected, no troubles on fire panel at time of inspection, fire alarm inspection complete, fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Steve Jones
BLD-Final10/17/201810/18/201810/18/2018PCANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Steve Jones Inspection cancelled from web by: Steve Jones
FIRE-Final Inspection10/17/201810/18/201810/18/2018PFAIL
DetailsJim Page
Fire panel was showing troubles at time of inspection, fire alarm system needs to be repaired and panel showing normal before life fire safety inspection is perfromed. Kitchen and dining room were in use at time of inspection, mentioned areas have not had final inspections completed, kitchen staff was informed to cease operation in areas were inspections need to be completed, no occupancy in areas of work is allowed until final inspections are complete and a C of O has been issued.

Phone #: ###-#### Inspection requested via web by Steve Jones
BLD-Conference10/11/201810/11/201810/11/2018PDONE
DetailsDave Hannah
Max occupancy sign locations determination Phone #: ###-#### Inspection requested via web by Steve Jones
CHANGE STATUS TO (ISS)  10/11/2018 DONE
OVERRIDE  10/10/2018  
OVERRIDE  10/10/2018  
Plan assigned to (CDM)10/3/201810/3/201810/10/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/4/2018 10/10/2018 PASS
DetailsCarl D Madsen
Permit Ready to Issue  10/10/2018 DONE
Plan Mod Approved
Do Not ReIssue (plan mod fees due)
Routing - MECHANICAL10/4/2018 10/9/2018 PASS
DetailsTroy James
Plan Modification Accepted  10/3/2018 DONE
upgrade 2 existing kichen hoods with MAU
Meeting  10/3/2018 DONE
waiting for over all project value to be sent in on 306
BLD-Conference9/25/20189/25/201810/1/2018PPASS
DetailsDave Hannah
Intent is to re open bar Phone #: ###-#### Inspection requested via web by Steve Jones
BLD-Other9/4/20189/6/20189/6/2018PPASS
DetailsDave Hannah
Intent is to reopen main entrance to pedestrian traffic Phone #: ###-#### Inspection requested via web by Steve Jones
FIRE-Alarm Testing9/4/20189/6/20189/6/2018ACANC
DetailsJim Page
Fire alarm inspection needs to be completed for requested areas before life fire safety inspection can be completed, permit holding comtractor needs to request the inspection, life safety can be scheduled for the same time as fire alarm as discussed with point of contact. I did not receive a return phone call from general contractor before PM inspection start, this request will need to be rescheduled to coincide with fire alarm inspection, this request is cancelled.

Intent is to reopen main entrance to pedestrian traffic Phone #: ###-#### Inspection requested via web by Steve Jones
BLD-Other9/4/20189/5/20189/4/2018PCANC
DetailsDave Hannah
Intent is to open lobby to pedestrian traffic Phone #: ###-#### >> Inspection requested via web by Steve Jones Inspection cancelled from web by: Steve Jones
FIRE-Alarm Testing9/4/20189/5/20189/4/2018ACANC
DetailsJim Page
Intent is to open lobby to pedestrian traffic Phone #: ###-#### >> Inspection requested via web by Steve Jones Inspection cancelled from web by: Steve Jones
FIRE-Conference8/15/20188/16/20188/16/2018ADONE
DetailsJim Page
Fire conference complete, new kitchen cooking equipment is being installed under kitchen hoods, a FIR permit will be required for modifications that will need to be made to existing hood system.

Look at code compliance of kitchen hoods Phone #: ###-#### Inspection requested via web by Steve Jones
BLD-Energy code compliance8/15/20188/15/20188/16/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Steve Jones
CHANGE STATUS TO (ISS)  8/13/2018 DONE
Print Occupancy Form  8/13/2018 DONE
OVERRIDE  8/10/2018  
Plan assigned to (CDM)7/27/20187/27/20188/10/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK8/1/2018 8/10/2018 PASS
DetailsCarl D Madsen
Permit Ready to Issue  8/10/2018 DONE
PLAN MOD
Routing - MECHANICAL8/1/2018 8/7/2018 PASS
DetailsTroy James
Routing - FIRE8/1/20188/1/20188/6/2018 PASS
DetailsErika Akin
Attached revised comments to case for plan mod
Routing - PUBLIC WORKS8/2/2018 8/2/2018 PASS
DetailsMorgan Webb
Routing - PLUMBING8/1/2018 8/2/2018 PASS
DetailsBill VanDegrift
Plan Modification Accepted  7/27/2018 DONE
addition of bar on second floor and new walk-in coolers for ground floor kitchen
BLD-Conference7/23/20187/23/20187/23/2018PDONE
DetailsDave Hannah
Steve Phone #: ###-####
Issue PAID IN FULL permit  7/19/2018 DONE
Print Occupancy Form  7/19/2018 DONE
OVERRIDE  7/16/2018  
Route to Impact Fee Review7/14/20187/17/20187/16/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (CDM)7/13/20187/13/20187/16/2018 PASS
DetailsCarl D Madsen
Grove Hotel Lobby
Routing - FIRE6/20/20186/20/20187/16/2018 PASS
DetailsErika Akin
Attached comments to case
Plan resubmittals received  7/16/2018 DONE
DetailsCarl D Madsen
Sheet A53 Millwork details
Routing - PLAN CHECK7/16/2018 7/16/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/16/2018 DONE
Permit Ready to Issue  7/16/2018 DONE
NEED - all met
RP
GC- met
rev cert of val- met

(suzanne.crane@zelham.com)
Plan assigned to (CJW)6/20/20186/20/20187/13/2018 DEFR
DetailsCarl Westfall
(July 6 - 15 days) (46 sheets) Grove Hotel Lobby/Bar L-3
Routing - PLAN CHECK6/20/2018 7/13/2018 FAIL
DetailsCarl D Madsen
Contacted the architect to prove an accessible detail for the valet station on the inside of th lobby.
1st review completed  7/13/2018 DONE
Routing - MECHANICAL6/20/2018 6/28/2018 PASS
DetailsTroy James
Routing - Erosion and Sediment6/20/2018 6/22/2018 PASS
DetailsAndy J. Long
ESC plan waiver approved. ESC Responsible Person listed is not certified, must get interim RP or certified RP.
Routing - Design Review6/20/2018 6/21/2018 PASS
DetailsAndrea Tuning
Routing - PLUMBING6/20/2018 6/20/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing6/20/2018 6/20/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/20/2018 6/20/2018 PASS
DetailsMorgan Webb
Intake Approval  6/18/2018 PASS
Intake Approval  6/14/2018 FAIL
DetailsJulie Romig
Need Zoning Certificate for exterior changes.
Application received  6/13/2018 DONE
Application submitted via PDS Online on Jun 13 2018 1:39PM