BLD-Final | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Dave Hannah
|
|
|
2nd floor bar Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Framing/Rough-in | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Dave Hannah
|
|
|
2nd floor bar Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Final | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones
|
FIRE-Final Inspection | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no troubles on fire panel at time of inspection, fire alarm inspection complete, fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Final | 10/17/2018 | 10/18/2018 | 10/18/2018 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Steve Jones Inspection cancelled from web by: Steve Jones
|
FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 | P | FAIL |
Jim Page
|
|
|
Fire panel was showing troubles at time of inspection, fire alarm system needs to be repaired and panel showing normal before life fire safety inspection is perfromed. Kitchen and dining room were in use at time of inspection, mentioned areas have not had final inspections completed, kitchen staff was informed to cease operation in areas were inspections need to be completed, no occupancy in areas of work is allowed until final inspections are complete and a C of O has been issued.
Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Conference | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | DONE |
Dave Hannah
|
|
|
Max occupancy sign locations determination Phone #: ###-#### Inspection requested via web by Steve Jones
|
CHANGE STATUS TO (ISS) | | | 10/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/10/2018 | | |
|
|
|
|
OVERRIDE | | | 10/10/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 10/3/2018 | 10/3/2018 | 10/10/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/4/2018 | | 10/10/2018 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 10/10/2018 | | DONE |
|
|
|
Plan Mod Approved
Do Not ReIssue (plan mod fees due)
|
Routing - MECHANICAL | 10/4/2018 | | 10/9/2018 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 10/3/2018 | | DONE |
|
|
|
upgrade 2 existing kichen hoods with MAU
|
Meeting | | | 10/3/2018 | | DONE |
|
|
|
waiting for over all project value to be sent in on 306
|
BLD-Conference | 9/25/2018 | 9/25/2018 | 10/1/2018 | P | PASS |
Dave Hannah
|
|
|
Intent is to re open bar Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Other | 9/4/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Dave Hannah
|
|
|
Intent is to reopen main entrance to pedestrian traffic Phone #: ###-#### Inspection requested via web by Steve Jones
|
FIRE-Alarm Testing | 9/4/2018 | 9/6/2018 | 9/6/2018 | A | CANC |
Jim Page
|
|
|
Fire alarm inspection needs to be completed for requested areas before life fire safety inspection can be completed, permit holding comtractor needs to request the inspection, life safety can be scheduled for the same time as fire alarm as discussed with point of contact. I did not receive a return phone call from general contractor before PM inspection start, this request will need to be rescheduled to coincide with fire alarm inspection, this request is cancelled.
Intent is to reopen main entrance to pedestrian traffic Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Other | 9/4/2018 | 9/5/2018 | 9/4/2018 | P | CANC |
Dave Hannah
|
|
|
Intent is to open lobby to pedestrian traffic Phone #: ###-#### >> Inspection requested via web by Steve Jones Inspection cancelled from web by: Steve Jones
|
FIRE-Alarm Testing | 9/4/2018 | 9/5/2018 | 9/4/2018 | A | CANC |
Jim Page
|
|
|
Intent is to open lobby to pedestrian traffic Phone #: ###-#### >> Inspection requested via web by Steve Jones Inspection cancelled from web by: Steve Jones
|
FIRE-Conference | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete, new kitchen cooking equipment is being installed under kitchen hoods, a FIR permit will be required for modifications that will need to be made to existing hood system.
Look at code compliance of kitchen hoods Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Energy code compliance | 8/15/2018 | 8/15/2018 | 8/16/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones
|
CHANGE STATUS TO (ISS) | | | 8/13/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/13/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/10/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 7/27/2018 | 7/27/2018 | 8/10/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/1/2018 | | 8/10/2018 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 8/10/2018 | | DONE |
|
|
|
PLAN MOD
|
Routing - MECHANICAL | 8/1/2018 | | 8/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 8/1/2018 | 8/1/2018 | 8/6/2018 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case for plan mod
|
Routing - PUBLIC WORKS | 8/2/2018 | | 8/2/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 8/1/2018 | | 8/2/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Plan Modification Accepted | | | 7/27/2018 | | DONE |
|
|
|
addition of bar on second floor and new walk-in coolers for ground floor kitchen
|
BLD-Conference | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | DONE |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/19/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/16/2018 | | |
|
|
|
|
Route to Impact Fee Review | 7/14/2018 | 7/17/2018 | 7/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (CDM) | 7/13/2018 | 7/13/2018 | 7/16/2018 | | PASS |
Carl D Madsen
|
|
|
Grove Hotel Lobby
|
Routing - FIRE | 6/20/2018 | 6/20/2018 | 7/16/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan resubmittals received | | | 7/16/2018 | | DONE |
Carl D Madsen
|
|
|
Sheet A53 Millwork details
|
Routing - PLAN CHECK | 7/16/2018 | | 7/16/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/16/2018 | | DONE |
|
|
|
NEED - all met
RP
GC- met
rev cert of val- met
(suzanne.crane@zelham.com)
|
Plan assigned to (CJW) | 6/20/2018 | 6/20/2018 | 7/13/2018 | | DEFR |
Carl Westfall
|
|
|
(July 6 - 15 days) (46 sheets) Grove Hotel Lobby/Bar L-3
|
Routing - PLAN CHECK | 6/20/2018 | | 7/13/2018 | | FAIL |
Carl D Madsen
|
|
|
Contacted the architect to prove an accessible detail for the valet station on the inside of th lobby.
|
1st review completed | | | 7/13/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 6/20/2018 | | 6/28/2018 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 6/20/2018 | | 6/22/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. ESC Responsible Person listed is not certified, must get interim RP or certified RP.
|
Routing - Design Review | 6/20/2018 | | 6/21/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLUMBING | 6/20/2018 | | 6/20/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 6/20/2018 | | 6/20/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2018 | | 6/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 6/18/2018 | | PASS |
|
|
|
|
Intake Approval | | | 6/14/2018 | | FAIL |
Julie Romig
|
|
|
Need Zoning Certificate for exterior changes.
|
Application received | | | 6/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 13 2018 1:39PM
|