BLD-Energy code compliance | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/7/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 8/6/2018 | 8/6/2018 | 8/6/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 8/6/2018 | 8/6/2018 | 8/6/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
KayCee Babb
|
|
|
|
Routing - PLAN CHECK | 8/6/2018 | | 8/6/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - Design Review | 8/6/2018 | | 8/6/2018 | | PASS |
KayCee Babb
|
|
|
per DRH18-00243
|
Case Summary (BLD) | | | 8/6/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2018 | | DONE |
Josh Bogle
|
|
|
min. Plan Mod Fee
|
Permit Ready to Issue | | | 8/6/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | DONE |
Josh Bogle
|
|
|
|
Meeting | | | 6/13/2018 | | DONE |
|
|
|
as per Ted V-appeal perior for the windows is until June 22 after 5:00-this building permit excludes the windows and he will do a pan mod after June 22, 2018 so he can get to work on the interoir portion
|
Routing - PLAN CHECK | 6/13/2018 | | 6/13/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/13/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/13/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/13/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/13/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/2018 | | DONE |
|
|
|
|
Application received | | 6/13/2018 | | | |
|
|
|
|