BLD-Final | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kassi Moore
|
DOC - Permit Finaled | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 8/15/2018 | 8/16/2018 | 8/17/2018 | P | PASS |
Jim Sly
|
|
|
Framing inspection for Hanners on 8/16/2018 please contact the office with any questions at ###-#### Phone #: ###-#### Inspection requested via web by kassi Moore
|
BLD-Conference | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | DONE |
Jim Sly
|
|
|
No one on site....Left C/N. Do not continue work until Tesoro Pipeline inspector verifies that new structure is not encroaching into setback.
|
BLD-Footing | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Mike Jordan
|
|
|
Kassi Phone #: ###-####
|
OVERRIDE | | | 8/2/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 8/2/2018 | 8/2/2018 | 8/2/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 8/2/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Josh Bogle
|
|
|
no new review required
|
Permit Ready to Issue | | | 8/2/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/2/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/15/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/15/2018 | | 6/15/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/15/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/15/2018 | | DONE |
|
|
|
|
Application received | | 6/15/2018 | | | |
|
|
|
|