BLD-Final | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Tony Young
|
|
|
Please give me a call when you are headed this way. Thanks! Phone #: ###-#### Inspection requested via web by Clayton Conner
|
DOC - Permit Finaled | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Tony Young
|
|
|
Please give me a call when you are headed this way. Thanks! Phone #: ###-#### Inspection requested via web by Clayton Conner,, ok pending hillside pass
|
BLD-Blower Door Test Results | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | DONE |
Tony Young
|
|
|
Please give me a call when you are headed this way. Thanks! Phone #: ###-#### Inspection requested via web by Clayton Conner/// 3.42
|
PubWorks Occupancy Approval | 5/13/2019 | 5/13/2019 | 5/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PART |
Tony Young
|
|
|
Please call before arrival as the permit plans are locked in a trailer. Thank you Phone #: ###-#### Inspection requested via web by Clayton Conner,, ok to insulate,, see corrections,, walked with framer
|
BLD-Framing/Rough-in | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | FAIL |
Brandon Shaw
|
|
|
Air/foam seal OK... No approved city plans on site...
|
Plan Modification Accepted | | | 11/20/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 11/20/2018 | | 11/20/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 11/7/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to cover exterior...
|
BLD-Wall Bracing | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | CANC |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Foundation | 8/23/2018 | 8/24/2018 | 8/24/2018 | P | PART |
Tony Young
|
|
|
Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
BLD-Foundation | 8/24/2018 | 8/24/2018 | 8/24/2018 | A | PART |
Tony Young
|
|
|
Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
BLD-Foundation | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | CANC |
Tony Young
|
|
|
Wes Phone #: ###-####
|
BLD-Foundation | 8/22/2018 | 8/23/2018 | 8/23/2018 | P | NR |
Tony Young
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Tony Young
|
|
|
As early as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
PubWorks Subgrade Approval | 8/17/2018 | 8/17/2018 | 8/17/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 8/6/2018 | | |
|
|
|
|
Routing - FIRE | 8/3/2018 | 8/3/2018 | 8/6/2018 | | PASS |
Tim Frost
|
|
|
Resubmittal New SFH ePlan
An alternate was approved by the Fire Marshal based on additonal information supplied by Suez.
|
Plan assigned to (JAB) Josh | 7/6/2018 | 7/6/2018 | 8/6/2018 | | PASS |
Josh Bogle
|
|
|
07/06 sfd L2 ePlan - Plan Check PASS, waiting fir Fire review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/6/2018 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 8/6/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2018 | | DONE |
|
|
|
|
Routing - FIRE | 7/24/2018 | 7/24/2018 | 8/2/2018 | | FAIL |
Tim Frost
|
|
|
Resubmittal New SFH ePlan
Previous comment has not been addressed see annoated drawng CVR. Fire flow availability letter is required.
|
Routing PW Grading-Hillside | 7/24/2018 | | 7/31/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
|
Routing - PLAN CHECK | 7/24/2018 | | 7/30/2018 | | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (RDP) | 6/19/2018 | 6/19/2018 | 7/6/2018 | | DEFR |
Rob Patrick
|
|
|
7/6 sfd L2 ePlan
|
Routing - PLAN CHECK | 6/19/2018 | | 7/6/2018 | | FAIL |
Josh Bogle
|
|
|
good looking plans, minor details missing
|
1st review completed | | | 7/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
Route to Impact Fee Review | 6/19/2018 | 6/22/2018 | 6/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 6/19/2018 | | 6/20/2018 | | FAIL |
Melissa Jannusch
|
|
|
See changemark in ePlan
|
Routing - FIRE | 6/19/2018 | 6/19/2018 | 6/19/2018 | | FAIL |
Tim Frost
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/19/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/19/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 6/19/2018 | | 6/19/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/19/2018 | | 6/19/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 6/19/2018 | | 6/19/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/19/2018 | | 6/19/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/19/2018 | | 6/19/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home. Site prep inspection required.
|
Application received | | | 6/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 15 2018 3:04PM
|