Permit Information
Permit NumberBLD18-02133
StatusFinaled
Name SCHNEIDER CUSTOM HOMES
Site Address 2113 N 30TH ST
Project Name2113 N 30th St
Customer NumberDEMO BLD18-01195
ePlanReviewYes
Description
***Prescriptive component energy approach***BONUS TRUSSES ABOVE GARAGE NOT APPROVED FOR AN ADU*** Permit for the construction of a new 2025 sq. ft., two story (first story 1304 sq. ft., second story 721 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 136 sq. ft. of covered patio/porch and a 566 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval1/29/20191/29/20191/29/2019 PASS
DetailsKatelyn Menuge
BLD-Final1/11/20191/15/20191/15/2019PPASS
DetailsTony Young
Dylan Phone #: ###-####,, ok after adding hand rails to garage storage
DOC - Permit Finaled1/15/20191/15/20191/15/2019PPASS
DetailsTony Young
BLD-Final1/9/20191/11/20191/11/2019APART
DetailsTony Young
Dylan Phone #: ###-####,, house ok,, garage ok after hand rails
BLD-Blower Door Test Results1/9/20191/11/20191/11/2019APASS
DetailsTony Young
Dylan Phone #: ###-####,, 4.0
BLD-Final1/8/20191/9/20191/9/2019APART
DetailsTony Young
Dylan Phone #: ###-####,, needs handrails in garage,, blower door test results
Zoning Approval Temp1/8/20191/8/20191/8/2019 DONE
DetailsKatelyn Menuge
Bond for Landscape - BND19-00007
BLD-Energy code compliance9/13/20189/13/20189/13/2018PPASS
DetailsJim Sly
Dillion Phone #: ###-####
BLD-Energy code compliance9/11/20189/12/20189/12/2018ANR
DetailsJim Storey
Dylan Phone #: ###-#### 3 locations fire blk ceilling of unusable spaces// vappor barrior need 2nd floor.
BLD-Framing/Rough-in9/7/20189/10/20189/10/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing8/24/20188/27/20188/27/2018APASS
DetailsTony Young
Dylan Phone #: ###-####
BLD-Foundation7/18/20187/18/20187/18/2018PPART
DetailsTony Young
Dillon Phone #: ###-####
BLD-Foundation7/13/20187/16/20187/16/2018APASS
DetailsTony Young
Andy Phone #: ###-####,, footing for house and detached garage ok
OVERRIDE  7/9/2018  
Issue PAID IN FULL permit  7/9/2018 DONE
Inspection Record Card- Bld  7/9/2018 DONE
Routing - PLANNING7/9/2018 7/9/2018 PASS
DetailsKatelyn Menuge
DRH18-00153
Routing - PLAN CHECK7/9/2018 7/9/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/9/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  7/9/2018 DONE
Met
Plan assigned to (M_H)6/18/2018 7/9/2018 DONE
DetailsMichael Hanson
06/29 sfd L1 ePlan. 1st review completed - Design review, Structural, and energy correction required. MDH
Routing - PLAN CHECK  6/26/2018 FAIL
DetailsMichael Hanson
Design review, Structural, and energy correction required. MDH
Plan Reviewer's activity  6/26/2018 DONE
DetailsMichael Hanson
1st review completed  6/26/2018 FAIL
DetailsMichael Hanson
Design review, Structural, and energy correction required. MDH
Route to Impact Fee Review6/18/20186/21/20186/19/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL  6/18/2018 PASS
DetailsTroy James
Routing - PLANNING  6/18/2018 FAIL
Please make corrections and submit written Idaho Power approval.
Routing - Addressing6/18/2018 6/18/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  6/18/2018 PASS
Intake Approval  6/18/2018 FAIL
asked Dylan to look at the checklist and make all corrections required and resubmitt-quite a lot of items were not on the plans-a new prescreen will need to be done-no rooms were labeld so didn't do the description
Plans ACCEPTED BY PLAN TECH  6/18/2018 DONE
Intake Approval  6/18/2018 PASS
Recd Pcfee & Taken To Pln CK  6/18/2018 DONE
Application received  6/16/2018 DONE
Application submitted via PDS Online on Jun 16 2018 12:29PM