Permit Information
Permit NumberBLD18-02134
StatusFinaled
Name WR GANN COMPANY
Site Address 2954 S MILLBROOK WAY
Project NameL16B53 Gann Spec
Customer Number 
ePlanReviewYes
Description
***Prescriptive component energy approach*** Permit for the construction of a new 3,000 sq. ft., one story single family dwelling with 3 bedrooms, 3 and a half bathrooms, approximately 225 sq. ft. of covered patio/porch and a 1,028 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
Bill Phone #: ###-####
DOC - Permit Finaled2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results2/25/20192/25/20192/25/2019PDONE
DetailsBrandon Shaw
ACH50- 3.38
BLD-Energy code compliance11/7/201811/7/201811/7/2018PPASS
DetailsBrandon Shaw
Work in progess
BLD-Framing/Rough-in11/2/201811/5/201811/5/2018APASS
DetailsJim Storey
Bill Phone #: ###-#### ok pending mech
BLD-Other10/19/201810/19/201810/19/2018PPASS
DetailsTony Young
sheet rock sofit // Bill Phone #: ###-####
BLD-Other9/25/20189/25/20189/25/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Wall Bracing9/19/20189/19/20189/19/2018PPASS
DetailsBrandon Shaw
Bill Phone #: ###-####
BLD-Foundation8/21/20188/21/20188/21/2018APASS
DetailsBrandon Shaw
As early as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
BLD-Footing8/15/20188/16/20188/16/2018APASS
DetailsBrandon Shaw
Work in progress
Issue PAID IN FULL permit  7/16/2018 DONE
Inspection Record Card- Bld  7/16/2018 DONE
Inspection Record Card- Bld  7/16/2018 DONE
OVERRIDE  6/29/2018  
Routing - PLAN CHECK6/29/2018 6/29/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/29/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/29/2018 DONE
DetailsChristina Prado
All met
Plan assigned to (M_H)6/18/2018 6/29/2018 DONE
DetailsMichael Hanson
06/29 sfd L2 ePlan. 1st review completed - Roof drainage and foam insulation ICC-ES report. MDH
Routing - PLAN CHECK6/18/2018 6/26/2018 FAIL
DetailsMichael Hanson
Roof drainage and foam insulation ICC-ES report. MDH
Plan Reviewer's activity  6/26/2018 DONE
DetailsMichael Hanson
1st review completed  6/26/2018 FAIL
DetailsMichael Hanson
Roof drainage and foam insulation ICC-ES report. MDH
Routing - PLANNING6/20/2018 6/20/2018 PASS
DetailsJeff Lowe
10-foot front setback met with new site plan
Route to Impact Fee Review6/18/20186/21/20186/19/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/18/2018 6/19/2018 PASS
DetailsTroy James
Routing - PLANNING6/18/2018 6/19/2018 FAIL
DetailsJeff Lowe
front setback needs to be 10-feet from back of sidewalk.
Routing - Erosion and Sediment6/18/2018 6/19/2018 PASS
DetailsMichael Zawacki
Property comes near warm spring creek. 25' natural buffer or perimeter BMPs needed in rear of lot.
Routing PW Flood Plain6/18/2018 6/18/2018 PASS
DetailsJason C. Taylor
Approved LOMR in file. No floodplain review required. JCT
Plans ACCEPTED BY PLAN TECH  6/18/2018 DONE
Recd Pcfee & Taken To Pln CK  6/18/2018 DONE
Intake Approval  6/18/2018 PASS
Routing - Addressing6/18/2018 6/18/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/18/2018 6/18/2018 PASS
DetailsMorgan Webb
Application received  6/17/2018 DONE
Application submitted via PDS Online on Jun 17 2018 8:16AM