Permit NumberBLD18-02135
StatusFinaled
Name STEELBLUE PROS
Site Address 1940 S EAGLESON RD
Project Name1940 Eagleson
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2339 sq. ft., one story single family dwelling with 5 bedrooms, 2 bathrooms, approximately 278 sq. ft. of covered patio/porch and a 886 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results10/10/201910/10/201910/10/2019PDONE
DetailsTell Riley
4.1 ACH 50
BLD-Final10/10/201910/10/201910/10/2019PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Braden Holbrook//corrections made//
DOC - Permit Finaled10/10/201910/10/201910/10/2019PPASS
DetailsTell Riley
BLD-Final9/16/20199/17/20199/17/2019AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Braden Holbrook//post blower door ACH//seal penetrations at garage/dwelling separation wall//add pipe bollard to protect mechanical//
BLD-Energy code compliance7/1/20197/1/20197/1/2019PPASS
DetailsTell Riley
ok to cover
BLD-Framing/Rough-in7/1/20197/1/20197/1/2019PPASS
DetailsTell Riley
HVAC is now done and need to change status from Pending. Phone #: ###-#### Inspection requested via web by Braden Holbrook//HVAC rough passed//
BLD-Framing/Rough-in6/24/20196/24/20196/24/2019PPEND
DetailsDave Hannah
Need final inspection...plans and truss engineering are in the south east corner of the garage if you need them. Also, waiting on some confusion with HVAC crawl duct work that I’m hoping you can work around. Phone #: ###-#### Inspection requested via web by Braden Holbrook ok to insulate after mec roungh in is signed off
Routing - MECHANICAL6/20/2019 6/20/2019 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Wall Bracing5/22/20195/22/20195/22/2019APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Braden Holbrook
BLD-Wall Bracing5/17/20195/17/20195/17/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Braden Holbrook
BLD-Foundation3/28/20193/29/20193/29/2019APASS
DetailsJim Sly
I called for an inspection earlier in the week but didn’t see any details. Maybe it’s already been inspected. Thanks for the help. Phone #: ###-#### Inspection requested via web by Braden Holbrook
BLD-Footing3/26/20193/26/20193/29/2019PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Braden Holbrook
Issue PAID IN FULL permit  2/26/2019 DONE
Inspection Record Card- Bld  2/26/2019 DONE
Telephone call  2/21/2019 DONE
called Braden-fees are not all paid-told him once he pays-we need to email him the permits to sign
Extend Review Timeline  12/11/2018 DONE
1st approved 180 day extension per Adele. see documents
Telephone call  12/5/2018 DONE
voicemail said it was to a braden. asked him to give me a call about expiring permit & to call if he is not with the company listed
Meeting  12/5/2018 DONE
Braden sent in request for extension
Expiration Notice11/23/201812/14/201811/23/2018 DONE
DetailsBrittany Hill
OVERRIDE  7/12/2018  
Plan assigned to (RDP)6/25/20186/25/20187/12/2018 DONE
DetailsRob Patrick
7/6 sfd L1 ePlan...7/6 Failed: Wall Bracing corrections
Routing - PLANNING7/12/2018 7/12/2018 PASS
DetailsSue Cummings
site plan OK now
Routing - PLAN CHECK7/12/2018 7/12/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/12/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  7/12/2018 DONE
met
Routing - PLAN CHECK6/25/2018 7/6/2018 FAIL
DetailsRob Patrick
Wall Bracing corrections
1st review completed  7/6/2018 FAIL
DetailsRob Patrick
Wall Bracing corrections
Route to Impact Fee Review6/25/20186/28/20186/26/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/25/2018 6/26/2018 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  6/25/2018 DONE
Intake Approval  6/25/2018 PASS
Recd Pcfee & Taken To Pln CK  6/25/2018 DONE
DetailsCandy A. Nichols
Routing - Addressing6/25/2018 6/25/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/25/2018 6/25/2018 PASS
DetailsMorgan Webb
Application received  6/17/2018 DONE
Application submitted via PDS Online on Jun 17 2018 9:56PM
Routing - PLANNING6/25/2018   FAIL
Garage needs to be 20 ft. from the edge of a common drive.