BLD-Blower Door Test Results | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | DONE |
Tell Riley
|
|
|
4.1 ACH 50
|
BLD-Final | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//corrections made//
|
DOC - Permit Finaled | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//post blower door ACH//seal penetrations at garage/dwelling separation wall//add pipe bollard to protect mechanical//
|
BLD-Energy code compliance | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Tell Riley
|
|
|
ok to cover
|
BLD-Framing/Rough-in | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Tell Riley
|
|
|
HVAC is now done and need to change status from Pending. Phone #: ###-#### Inspection requested via web by Braden Holbrook//HVAC rough passed//
|
BLD-Framing/Rough-in | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PEND |
Dave Hannah
|
|
|
Need final inspection...plans and truss engineering are in the south east corner of the garage if you need them. Also, waiting on some confusion with HVAC crawl duct work that I’m hoping you can work around. Phone #: ###-#### Inspection requested via web by Braden Holbrook ok to insulate after mec roungh in is signed off
|
Routing - MECHANICAL | 6/20/2019 | | 6/20/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 5/22/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook
|
BLD-Wall Bracing | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook
|
BLD-Foundation | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Jim Sly
|
|
|
I called for an inspection earlier in the week but didn’t see any details. Maybe it’s already been inspected. Thanks for the help. Phone #: ###-#### Inspection requested via web by Braden Holbrook
|
BLD-Footing | 3/26/2019 | 3/26/2019 | 3/29/2019 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook
|
Issue PAID IN FULL permit | | | 2/26/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2019 | | DONE |
|
|
|
called Braden-fees are not all paid-told him once he pays-we need to email him the permits to sign
|
Extend Review Timeline | | | 12/11/2018 | | DONE |
|
|
|
1st approved 180 day extension per Adele. see documents
|
Telephone call | | | 12/5/2018 | | DONE |
|
|
|
voicemail said it was to a braden. asked him to give me a call about expiring permit & to call if he is not with the company listed
|
Meeting | | | 12/5/2018 | | DONE |
|
|
|
Braden sent in request for extension
|
Expiration Notice | 11/23/2018 | 12/14/2018 | 11/23/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 7/12/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 6/25/2018 | 6/25/2018 | 7/12/2018 | | DONE |
Rob Patrick
|
|
|
7/6 sfd L1 ePlan...7/6 Failed: Wall Bracing corrections
|
Routing - PLANNING | 7/12/2018 | | 7/12/2018 | | PASS |
Sue Cummings
|
|
|
site plan OK now
|
Routing - PLAN CHECK | 7/12/2018 | | 7/12/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/12/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 6/25/2018 | | 7/6/2018 | | FAIL |
Rob Patrick
|
|
|
Wall Bracing corrections
|
1st review completed | | | 7/6/2018 | | FAIL |
Rob Patrick
|
|
|
Wall Bracing corrections
|
Route to Impact Fee Review | 6/25/2018 | 6/28/2018 | 6/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/25/2018 | | 6/26/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/25/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/25/2018 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - Addressing | 6/25/2018 | | 6/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/25/2018 | | 6/25/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 6/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2018 9:56PM
|
Routing - PLANNING | 6/25/2018 | | | | FAIL |
|
|
|
Garage needs to be 20 ft. from the edge of a common drive.
|