Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-02141
StatusFinaled
Name CANYON CREST HOMES
Site Address 1699 N MOCKBEE PL
Project Name5-1 Sherman Hollow
Customer Number 
ePlanReviewYes
Description
FIRE SPRINKLERS REQUIRED - See BFD memo dated 11-29-2007
***WUI Zone A requirements***Prescriptive component energy approach*** Permit for the construction of a new 1,885 sq. ft., two story (first story 1,283 sq. ft., below grade 602 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 308 sq. ft. of covered patio/porch and a 680 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results12/12/201812/13/201812/13/2018PPASS
DetailsTony Young
3283 code Phone #: ###-#### Inspection requested via web by David Wipper// 3.76
DOC - Permit Finaled12/13/201812/13/201812/13/2018PPASS
DetailsTony Young
c of o issued
BLD-Final12/12/201812/13/201812/13/2018PPASS
DetailsTony Young
3283 code Phone #: ###-#### Inspection requested via web by David Wipper// B D 3.76
PubWorks Occupancy Approval12/13/201812/13/201812/13/2018 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final12/12/201812/12/201812/12/2018PPART
DetailsTony Young
3283 code Phone #: ###-#### Inspection requested via web by David Wipper,, ok just needs to verify public works hillside approval
BLD-Other10/3/201810/4/201810/8/2018ADONE
DetailsTony Young
Sofit - Larry Phone #: ###-####
BLD-Other9/27/20189/27/20189/27/2018PPART
DetailsJim Storey
sofit- Larry Phone #: ###-#### need fire rated listings for can lights.
BLD-Energy code compliance9/26/20189/27/20189/27/2018APASS
DetailsDave Hannah
Larry Phone #: ###-####
BLD-Framing/Rough-in9/21/20189/21/20189/21/2018PPART
DetailsTony Young
Larry Phone #: ###-####,, see paint,, tighten all nuts in the sill plate bolts,, seal holes in the plates,, add hanger on upstairs hip ridge jack,, fire block the double wall top plates,, (can be insulation),, see paint,, will need one more tenting inspection from the sprinkler inspector prior to energy code passing for cover,, ok to insulate after fixes
BLD-Wall Bracing9/17/20189/18/20189/18/2018PPART
DetailsTony Young
Shear wall re inspection Phone #: ###-#### Inspection requested via web by David Wipper,, exterior ok now
BLD-Wall Bracing9/12/20189/13/20189/13/2018APART
DetailsMike Jordan
Shear // Larry Phone #: ###-####. exterior shear nailing ok. Noted one simpson STHD 14 placed in wrong location in middle of lower window, soyth wall. Will need to have engineer provide alternate fix. Will verify on framing inspection.
BLD-Wall Bracing9/11/20189/12/20189/12/2018ANR
DetailsDave Hannah
Shear // Larry Phone #: ###-####
BLD-Foundation8/6/20188/6/20188/6/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing7/31/20187/31/20187/31/2018APASS
DetailsBrandon Shaw
BLD-Footing7/30/20187/31/20187/31/2018AFAIL
DetailsBrandon Shaw
Need subgrade approval
PubWorks Subgrade Approval7/31/20187/31/20187/31/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing7/27/20187/30/20187/30/2018APEND
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, needs approval from the office 1st,,
BLD-Footing7/27/20187/27/20187/27/2018PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, needs soils
OVERRIDE  7/20/2018  
Inspection Record Card- Bld  7/20/2018 DONE
Issue PAID IN FULL permit  7/20/2018 DONE
Plan assigned to (M_H)7/18/2018 7/20/2018 DONE
DetailsMichael Hanson
07/09 sfd L2 ePlan. 1st review completed by Josh 07/09. 2nd review completed 07/18. MDH
Routing - PLAN CHECK7/20/2018 7/20/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/20/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  7/20/2018 DONE
met
Routing - FIRE7/18/20187/18/20187/18/2018 PASS
DetailsTim Frost
Fire sprinklers are required on this project.
Plan assigned to (JAB) Josh7/9/20187/9/20187/18/2018 DEFR
DetailsJosh Bogle
1st done - sfd L2 ePlan from Brian
Plan assigned to (BJM)6/20/20186/20/20187/9/2018 DEFR
DetailsBrian McGowan
7-9 sfd L2 ePlan
Routing - PLAN CHECK6/20/2018 7/9/2018 FAIL
DetailsJosh Bogle
1st review completed  7/9/2018 FAIL
DetailsJosh Bogle
Routing - MECHANICAL6/20/2018 6/22/2018 PASS
DetailsChad Schwendiman
Route to Impact Fee Review6/20/20186/23/20186/21/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Grading-Hillside6/20/2018 6/21/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - FIRE6/20/20186/20/20186/20/2018 FAIL
DetailsTim Frost
Plans ACCEPTED BY PLAN TECH  6/20/2018 DONE
Recd Pcfee & Taken To Pln CK  6/20/2018 DONE
Intake Approval  6/20/2018 PASS
Routing - PLANNING6/20/2018 6/20/2018 PASS
DetailsSue Cummings
Eaves may hang into setback not more than 2 ft.
Routing - Addressing6/20/2018 6/20/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/20/2018 6/20/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment6/20/2018 6/20/2018 PASS
DetailsMichael Zawacki
Foothills home, site prep inspection required.
Application received  6/18/2018 DONE
Application submitted via PDS Online on Jun 18 2018 10:48AM
Intake Approval  6/18/2018 FAIL
CAT II