BLD-Final | 2/13/2019 | 2/13/2019 | 2/14/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 2/14/2019 | 2/14/2019 | 2/14/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 2/13/2019 | 2/13/2019 | 2/14/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.19
|
PubWorks Occupancy Approval | 1/9/2019 | 1/9/2019 | 1/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PASS |
Tony Young
|
|
|
sofit- les Phone #: ###-####
|
BLD-Energy code compliance | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Other | 10/12/2018 | 10/12/2018 | 10/12/2018 | A | DONE |
Brandon Shaw
|
|
|
See Documents for Special inspection for installation of anchor bolts...
|
BLD-Framing/Rough-in | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | FAIL |
Brandon Shaw
|
|
|
Bearing points to be continuous to foundation... Header at office window to be (2) 9 1/2 LVL...
OK to insulate
|
BLD-Wall Bracing | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | FAIL |
Brandon Shaw
|
|
|
Anchor bolts in both garages are bent and in tension- Need Engineering approval or install new bolts...
|
BLD-Foundation | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 8/5/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 8/3/2018 | 8/3/2018 | 8/3/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/6/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 6/19/2018 | 6/19/2018 | 7/6/2018 | | DONE |
Rob Patrick
|
|
|
7/6 sfd L2 ePlan
|
Routing - PLAN CHECK | 6/19/2018 | | 7/6/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 7/6/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/6/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/19/2018 | 6/22/2018 | 6/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/19/2018 | 6/19/2018 | 6/20/2018 | | PASS |
Tim Frost
|
|
|
|
Routing PW Grading-Hillside | 6/19/2018 | | 6/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - Erosion and Sediment | 6/19/2018 | | 6/20/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home. Site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/19/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/19/2018 | | PASS |
|
|
|
|
Routing - MECHANICAL | 6/19/2018 | | 6/19/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/19/2018 | | 6/19/2018 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 6/19/2018 | | 6/19/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/19/2018 | | 6/19/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 6/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 18 2018 5:04PM
|