BLD-Final | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 11/27/2018 | 11/27/2018 | 11/27/2018 | A | DONE |
Mike Jordan
|
|
|
4.2ACH @ 50pa
|
BLD-Energy code compliance | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | DONE |
Jim Storey
|
|
|
Mike phone 208 371 5373
|
BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Wall Bracing | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Dave Hannah
|
|
|
Shear // Mike Phone #: ###-####
|
BLD-Wall Bracing | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | FAIL |
Mike Jordan
|
|
|
shear // Mike Phone #: ###-####. Fasteners over driven ongarage portal frame. mising blocking on shear wall at front bedroom. Needs portal frame at back.
|
BLD-Foundation | 7/29/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Jim Sly
|
|
|
As early as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
Issue PAID IN FULL permit | | | 7/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/3/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 6/19/2018 | 6/19/2018 | 7/3/2018 | | DONE |
Rob Patrick
|
|
|
7/2 sfd L1 Paper...7/2 Failed for Energy table Corrections.
|
Inspection Record Card- Bld | | | 7/3/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2018 | | DONE |
|
|
|
called Mike to let know permit is ready and how much permit is-left message on his cell
|
Plan resubmittals received | | | 7/3/2018 | | DONE |
|
|
|
Two sheets of 1 of 5 and 5 of 5. taken to Rob
|
Routing - PLAN CHECK | 7/3/2018 | | 7/3/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 7/3/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/3/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/25/2018 | | 7/2/2018 | | FAIL |
Rob Patrick
|
|
|
Energy Table corrections required.
|
1st review completed | | | 7/2/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections to Energy Table required and misc other corrections.
|
Routing - MECHANICAL | | | 6/25/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 6/19/2018 | 6/22/2018 | 6/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 6/19/2018 | | 6/20/2018 | | PASS |
Nicolette Womack
|
|
|
15' rear setback required along all portions of the building.
See Fire Access Memo from RJ in ROS17-00019 dated 4-17-17.
|
Routing - Addressing | 6/19/2018 | | 6/19/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 6/19/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/19/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/19/2018 | | DONE |
|
|
|
|
Application received | | 6/19/2018 | | | |
|
|
|
|