Permit Information
Permit NumberBLD18-02185
StatusIssued
Name ROTH CONSTRUCTION INC
Site Address 146 W SKYLARK DR
Project Name146 W. Skylark Dr.
Customer Number 
ePlanReviewYes
Description
FIRE SPRINKLERS ARE REQUIRED DUE TO ACCESS DISTANCE (REF: IFC: 503.1)
***Prescriptive component energy approach***WUI Zone A requirements*** Permit to demolish existing singel family dwelling and the construction of a new 5,491 sq. ft., two story (first story 3,168 sq. ft., Below grade 2,323 sq. ft.) single family dwelling with 4 bedrooms, 4 and a half bathrooms, approximately 1,033 sq. ft. of covered patio/porch and a 1,733 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Change Expiration Date Only  5/28/2020 DONE
DetailsJason Blais
A 180 day extension has been granted from 6/15/20. This is the second extension request for an issued permit.
BLD-Aging Inspection5/1/20205/1/20205/1/2020 DEFR
DetailsBrandon Shaw
BLD-Aging Inspection4/30/20204/30/20204/30/2020 DEFR
DetailsBrandon Shaw
Work in progress...
Change Expiration Date Only  12/2/2019 DONE
DetailsJason Blais
A 180 day extension approved from 12/18/19. This is the first extension request for an issued permit.
BLD-Foundation6/20/20196/21/20196/21/2019APASS
DetailsDave Hannah
late morning please- Willie Phone #: ###-####
BLD-Aging Inspection6/7/20196/7/20196/11/2019 PASS
DetailsTony Young
BLD-Footing6/10/20196/11/20196/11/2019APART
DetailsTony Young
Willie Phone #: ###-####,, west footings ok,, work in progress
BLD-Aging Inspection6/6/20196/6/20196/7/2019 PASS
DetailsTony Young
PubWorks Subgrade Approval5/15/20195/15/20195/15/2019 DONE
DetailsMelissa Jannusch
West End Foundation. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Wall Bracing1/22/20191/23/20191/23/2019ACANC
DetailsMike Jordan
Kevin Phone #: ###-####
BLD-Foundation1/23/20191/23/20191/23/2019APASS
DetailsMike Jordan
Kevin Phone #: ###-####
BLD-Footing1/16/20191/17/20191/17/2019APASS
DetailsDave Hannah
1st thing in the AM if possible, kevin Phone #: ###-#### ftgs for house ok
PubWorks Subgrade Approval1/17/20191/17/20191/17/2019 DONE
DetailsMelissa Jannusch
EAST END BASEMENT FND A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Foundation11/16/201811/19/201811/19/2018APASS
DetailsTony Young
retaining wall - Kevin Phone #: ###-####,, 2nd lower wall ok
BLD-Foundation11/13/201811/13/201811/13/2018PPART
DetailsTony Young
Cleeve-pour time 3:00 Phone #: ###-####,, work in progress on 2nd lower from the top on north,, ok
PubWorks Subgrade Approval11/13/201811/13/201811/13/2018 DONE
DetailsMelissa Jannusch
2nd RETAINING WALL. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Foundation10/31/201811/1/201811/1/2018APART
DetailsBrandon Shaw
Back retaining wall
BLD-Conference10/30/201810/30/201810/30/2018PPART
DetailsTony Young
Cleve,, soils ok now upper retaining wall footings
BLD-Footing10/29/201810/30/201810/30/2018ANR
DetailsMike Jordan
Cleve Phone #: ###-####, upper retaining wall. No soils report.
PubWorks Subgrade Approval10/30/201810/30/201810/30/2018 DONE
DetailsMelissa Jannusch
NORTHERN RETAINING WALL. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing10/29/201810/29/201810/29/2018PNR
DetailsTony Young
Cleve Phone #: ###-####,, needs soils approval
BLD-Footing10/26/201810/29/201810/29/2018ANR
DetailsTony Young
Cleve Phone #: ###-####,, needs soils approval
Issue PAID IN FULL permit  8/20/2018 DONE
OVERRIDE  8/3/2018  
Plan assigned to (M_H)6/22/2018 8/3/2018 DONE
DetailsMichael Hanson
07/11 sfd L2 ePlan. 1st review completed - WUI and energy deficiences. MDH
Routing - PLAN CHECK8/3/2018 8/3/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  8/3/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  8/3/2018 DONE
Routing - FIRE8/2/20188/2/20188/2/2018 PASS
DetailsTim Frost
A note has been added to the site plan drawing indicating a NFPA 13D sprinkler system will be installed.
Routing PW Grading-Hillside8/1/2018 8/1/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - MECHANICAL7/25/2018 7/25/2018 PASS
DetailsTroy James
1st review completed  7/11/2018 FAIL
DetailsMichael Hanson
WUI and energy deficiences. MDH
Routing - PLAN CHECK6/22/2018 7/11/2018 FAIL
DetailsMichael Hanson
WUI and energy deficiences. MDH
Routing PW Grading-Hillside6/22/2018 6/29/2018 FAIL
DetailsMelissa Jannusch
Paul,

The following are the revisions requested for hillside review of 146 W skylark Drive BLD18-02185. Please let me know if you have any questions or would like to discuss the revisions more.

1. Please have the geotechnical engineer comment on the suitability of the location of the swales and provide any recommendations to protect downslope homes and structures. Infiltration testing will be required if the area proposed for infiltration is not free draining materials.
2. Have the geotechnical engineer comment if the setbacks for the most recent grading plan meet the setback specifications provided in the geotechnical report.
3. Coordinate with structural engineer to match details for the retaining walls and ensure that the retaining wall heights and embedment depth of the retaining walls are consistent in the grading plans, the structural engineering plans, and the structural engineering calculations.
4. Provide bottom of footing heights for the retaining walls on the grading plan.
5. Please update the landscape plan to match the grading plan. Include revegetation recommendations for the southern slope area in the rear of the home as it will be disturb by grading activities.

You will have to wait to resubmit any plans until the task returns to you in the ePermit system. I will add these comments into the ePermit system as well. Please contact Christina Prado Christina Prado CDPrado@cityofboise.org if you are having problem uploading.

Best,

Melissa
Routing - Erosion and Sediment6/22/2018 6/27/2018 PASS
DetailsMichael Zawacki
Site prep inspection required.
Plan and map do not mention demo of existing buildings.
Routing - MECHANICAL6/22/2018 6/26/2018 FAIL
DetailsTroy James
Emailed corrections to Legends
Route to Impact Fee Review6/22/20186/25/20186/25/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE6/22/20186/22/20186/25/2018 FAIL
DetailsTim Frost
7/11 New SFH ePlan

Fire sprinklers are required due to access distance (Ref: IFC: 503.1.1)

Drawings are to be noted accordingly.
Routing - PLANNING6/22/2018 6/22/2018 PASS
DetailsNicolette Womack
The plans show a second kitchen within the basement floor plan. The home is not approved for a second dwelling unit on site. If a second dwelling unit is desired it is required to obtain approval for an Accessory Dwelling Unit.
Routing - Addressing6/22/2018 6/22/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/22/2018 6/22/2018 PASS
DetailsMorgan Webb
SWR15-01250 FEES PAID FOR SEWER EXTENSION IN 2015. NO NEW FEES.
Plans ACCEPTED BY PLAN TECH  6/22/2018 DONE
Intake Approval  6/22/2018 PASS
Recd Pcfee & Taken To Pln CK  6/22/2018 DONE
Intake Approval  6/21/2018 FAIL
`Please upload plans that do not say: not for construction on them. (Basement Plan, Elevations 1 & 2, Main floor plan, Sections 1-6 and structural details.) Needs to be removed or crossed off)
Application received  6/20/2018 DONE
Application submitted via PDS Online on Jun 20 2018 9:41AM