Change Expiration Date Only | | | 5/28/2020 | | DONE |
Jason Blais
|
|
|
A 180 day extension has been granted from 6/15/20. This is the second extension request for an issued permit.
|
BLD-Aging Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 | | DEFR |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 4/30/2020 | 4/30/2020 | 4/30/2020 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
Change Expiration Date Only | | | 12/2/2019 | | DONE |
Jason Blais
|
|
|
A 180 day extension approved from 12/18/19. This is the first extension request for an issued permit.
|
BLD-Foundation | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Dave Hannah
|
|
|
late morning please- Willie Phone #: ###-####
|
BLD-Aging Inspection | 6/7/2019 | 6/7/2019 | 6/11/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Footing | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PART |
Tony Young
|
|
|
Willie Phone #: ###-####,, west footings ok,, work in progress
|
BLD-Aging Inspection | 6/6/2019 | 6/6/2019 | 6/7/2019 | | PASS |
Tony Young
|
|
|
|
PubWorks Subgrade Approval | 5/15/2019 | 5/15/2019 | 5/15/2019 | | DONE |
Melissa Jannusch
|
|
|
West End Foundation. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Wall Bracing | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | CANC |
Mike Jordan
|
|
|
Kevin Phone #: ###-####
|
BLD-Foundation | 1/23/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Mike Jordan
|
|
|
Kevin Phone #: ###-####
|
BLD-Footing | 1/16/2019 | 1/17/2019 | 1/17/2019 | A | PASS |
Dave Hannah
|
|
|
1st thing in the AM if possible, kevin Phone #: ###-#### ftgs for house ok
|
PubWorks Subgrade Approval | 1/17/2019 | 1/17/2019 | 1/17/2019 | | DONE |
Melissa Jannusch
|
|
|
EAST END BASEMENT FND A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Tony Young
|
|
|
retaining wall - Kevin Phone #: ###-####,, 2nd lower wall ok
|
BLD-Foundation | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PART |
Tony Young
|
|
|
Cleeve-pour time 3:00 Phone #: ###-####,, work in progress on 2nd lower from the top on north,, ok
|
PubWorks Subgrade Approval | 11/13/2018 | 11/13/2018 | 11/13/2018 | | DONE |
Melissa Jannusch
|
|
|
2nd RETAINING WALL. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PART |
Brandon Shaw
|
|
|
Back retaining wall
|
BLD-Conference | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PART |
Tony Young
|
|
|
Cleve,, soils ok now upper retaining wall footings
|
BLD-Footing | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | NR |
Mike Jordan
|
|
|
Cleve Phone #: ###-####, upper retaining wall. No soils report.
|
PubWorks Subgrade Approval | 10/30/2018 | 10/30/2018 | 10/30/2018 | | DONE |
Melissa Jannusch
|
|
|
NORTHERN RETAINING WALL. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | NR |
Tony Young
|
|
|
Cleve Phone #: ###-####,, needs soils approval
|
BLD-Footing | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | NR |
Tony Young
|
|
|
Cleve Phone #: ###-####,, needs soils approval
|
Issue PAID IN FULL permit | | | 8/20/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/3/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 6/22/2018 | | 8/3/2018 | | DONE |
Michael Hanson
|
|
|
07/11 sfd L2 ePlan. 1st review completed - WUI and energy deficiences. MDH
|
Routing - PLAN CHECK | 8/3/2018 | | 8/3/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 8/3/2018 | | DONE |
|
|
|
|
Routing - FIRE | 8/2/2018 | 8/2/2018 | 8/2/2018 | | PASS |
Tim Frost
|
|
|
A note has been added to the site plan drawing indicating a NFPA 13D sprinkler system will be installed.
|
Routing PW Grading-Hillside | 8/1/2018 | | 8/1/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - MECHANICAL | 7/25/2018 | | 7/25/2018 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 7/11/2018 | | FAIL |
Michael Hanson
|
|
|
WUI and energy deficiences. MDH
|
Routing - PLAN CHECK | 6/22/2018 | | 7/11/2018 | | FAIL |
Michael Hanson
|
|
|
WUI and energy deficiences. MDH
|
Routing PW Grading-Hillside | 6/22/2018 | | 6/29/2018 | | FAIL |
Melissa Jannusch
|
|
|
Paul,
The following are the revisions requested for hillside review of 146 W skylark Drive BLD18-02185. Please let me know if you have any questions or would like to discuss the revisions more.
1. Please have the geotechnical engineer comment on the suitability of the location of the swales and provide any recommendations to protect downslope homes and structures. Infiltration testing will be required if the area proposed for infiltration is not free draining materials.
2. Have the geotechnical engineer comment if the setbacks for the most recent grading plan meet the setback specifications provided in the geotechnical report.
3. Coordinate with structural engineer to match details for the retaining walls and ensure that the retaining wall heights and embedment depth of the retaining walls are consistent in the grading plans, the structural engineering plans, and the structural engineering calculations.
4. Provide bottom of footing heights for the retaining walls on the grading plan.
5. Please update the landscape plan to match the grading plan. Include revegetation recommendations for the southern slope area in the rear of the home as it will be disturb by grading activities.
You will have to wait to resubmit any plans until the task returns to you in the ePermit system. I will add these comments into the ePermit system as well. Please contact Christina Prado Christina Prado CDPrado@cityofboise.org if you are having problem uploading.
Best,
Melissa
|
Routing - Erosion and Sediment | 6/22/2018 | | 6/27/2018 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
Plan and map do not mention demo of existing buildings.
|
Routing - MECHANICAL | 6/22/2018 | | 6/26/2018 | | FAIL |
Troy James
|
|
|
Emailed corrections to Legends
|
Route to Impact Fee Review | 6/22/2018 | 6/25/2018 | 6/25/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/22/2018 | 6/22/2018 | 6/25/2018 | | FAIL |
Tim Frost
|
|
|
7/11 New SFH ePlan
Fire sprinklers are required due to access distance (Ref: IFC: 503.1.1)
Drawings are to be noted accordingly.
|
Routing - PLANNING | 6/22/2018 | | 6/22/2018 | | PASS |
Nicolette Womack
|
|
|
The plans show a second kitchen within the basement floor plan. The home is not approved for a second dwelling unit on site. If a second dwelling unit is desired it is required to obtain approval for an Accessory Dwelling Unit.
|
Routing - Addressing | 6/22/2018 | | 6/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/22/2018 | | 6/22/2018 | | PASS |
Morgan Webb
|
|
|
SWR15-01250 FEES PAID FOR SEWER EXTENSION IN 2015. NO NEW FEES.
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/22/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/22/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/21/2018 | | FAIL |
|
|
|
`Please upload plans that do not say: not for construction on them. (Basement Plan, Elevations 1 & 2, Main floor plan, Sections 1-6 and structural details.) Needs to be removed or crossed off)
|
Application received | | | 6/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 20 2018 9:41AM
|