Permit Information
Permit NumberBLD18-02192
StatusFinaled
Name TRADEWINDS GENERAL CONTRACTING INC
Site Address 2264 S BLUESTEM LN
Project Name 
Customer NumberDEMO BLD18-01417
ePlanReviewYes
Description
FLOODPLAIN - PROVIDE ELEVATION CERTIFICATES AS REQUIRED- Permit for the construction of a new 6697 sq. ft., two story (first story 4070 sq. ft., second story 2627 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 1662 sq. ft. of covered patio/porch and a 1791 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/21/20207/22/20207/22/2020APASS
DetailsBrandon Shaw
screened // Jason Phone #: ###-####
DOC - Permit Finaled7/22/20207/22/20207/22/2020PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval7/21/20207/21/20207/21/2020 DONE
DetailsJason C. Taylor
The final Elevation Certificate has been received and is acceptable. Final occupancy may be approved by the building department. Jason Taylor ###-####
Elevation Cert Rec'd-Final  7/21/2020 DONE
The final Elevation Certificate has been received and is acceptable. Final occupancy may be approved by the building department. Jason Taylor ###-####
BLD-Final7/15/20207/15/20207/16/2020PNR
DetailsBrandon Shaw
Need PW approval...
BLD-Aging Inspection4/24/20204/24/20204/24/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days4/24/20204/24/20204/24/2020PDONE
DetailsBrandon Shaw
Per phone conversation with contractor, final inspections to be at theendof May thru to June...
BLD-Aging Inspection12/12/201912/12/201912/12/2019 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days12/12/201912/12/201912/12/2019PDONE
DetailsBrandon Shaw
BLD-Aging Inspection12/11/201912/11/201912/11/2019 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days12/11/201912/11/201912/11/2019ACANC
DetailsBrandon Shaw
BLD-Energy code compliance7/30/20197/30/20197/30/2019PPASS
DetailsBrandon Shaw
Jason Phone #: ###-####
BLD-Framing/Rough-in7/30/20197/30/20197/30/2019PPASS
DetailsBrandon Shaw
Jason Phone #: ###-####
Elevation Cert Rec'd-Midconst  7/17/2019 DONE
The second Elevation Certificate has been received and is acceptable. Framing inspection may be scheduled for the building department. Jason Taylor ###-####
BLD-Framing/Rough-in7/12/20197/15/20197/15/2019ANR
DetailsBrandon Shaw
Need Flood Elevation cert. submitted and approved by PW...
BLD-Framing/Rough-in7/12/20197/12/20197/12/2019PDEFR
DetailsJim Storey
Jason-pleae call when on way Phone #: ###-#### to monday out of time.
BLD-Wall Bracing6/27/20196/28/20196/28/2019APASS
DetailsTell Riley
Jason Phone #: ###-####//shear nailing ok//
BLD-Aging Inspection4/10/20194/10/20194/10/2019 PASS
DetailsJim Storey
BLD-Foundation11/27/201811/27/201811/27/2018PPASS
DetailsJim Storey
Matt Phone #: ###-####
BLD-Footing11/19/201811/20/201811/20/2018APASS
DetailsDave Hannah
Matt Phone #: ###-####
Issue PAID IN FULL permit  10/3/2018 DONE
Inspection Record Card- Bld  10/3/2018 DONE
Telephone call  10/2/2018 DONE
Called GC to ask who the RP will be. Left message with front desk.
OVERRIDE  9/25/2018  
Plan assigned to (BJM)8/24/20188/24/20189/25/2018 DONE
DetailsBrian McGowan
09/12 sfd L2 ePlan- 1st review Complete- Must pass PW for Floodplain.
PLANS/APPL TAKEN TO FRONT DESK  9/25/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/25/2018 DONE
NEED- met
RP - ONE GIVEN EXPIRED
Routing PW Flood Plain9/19/2018 9/19/2018 PASS
DetailsJason C. Taylor
NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to framing/occupancy approval. Jason Taylor ###-####
Elevation Cert Rec'd-Prelim  9/19/2018  
Routing - PLAN CHECK8/24/2018 9/18/2018 PASS
DetailsBrian McGowan
1st review completed  9/12/2018 DONE
DetailsBrian McGowan
Routing PW Flood Plain8/24/2018 8/28/2018 FAIL
DetailsJason C. Taylor
Need Civil Drawings uploaded for review. Jason Taylor ###-####
Routing - PLANNING8/24/2018 8/28/2018 PASS
DetailsDavid Moser
Approval for the house only, the landscaping in 200 foot setback requires River System Application approval
Routing - MECHANICAL8/24/2018 8/27/2018 PASS
DetailsTroy James
Routing - PUBLIC WORKS8/24/2018 8/24/2018 PASS
DetailsMorgan Webb
Intake Approval  8/24/2018 FAIL
Please upload a Erosion & Sediment Control Narrative along with the Erosion plan.
Plans ACCEPTED BY PLAN TECH  8/24/2018 DONE
Intake Approval  8/24/2018 PASS
Recd Pcfee & Taken To Pln CK  8/24/2018 DONE
Intake Approval  8/21/2018 FAIL
DetailsChristina Prado
ePlan prescreen - needs ESC plan, narrative, CFH approval letter, Elevation Cert & correct naming conventions
Meeting  8/14/2018 DONE
Per property owner & designer - plans moved to online submittal. CFH has been issued and plans must be redesigned
Plan Reviewer's activity  8/10/2018  
See Floodplain/Boise River determinations as per Hal and Jason.
Plan assigned to (BJM)6/20/20186/20/20186/29/2018 CANC
DetailsBrian McGowan
7-9 sfd L2 paper -- cancelled review need CFH first//leg
Routing PW Flood Plain  6/29/2018 FAIL
DetailsJason C. Taylor
per JCT brought up plans. Need CFH approval
Telephone call  6/29/2018 DONE
called Trey Hoff and let him know review is cancelled. Need to do CFH approval first.
Route to Impact Fee Review6/20/20186/23/20186/21/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Sewer Rating6/21/2018 6/21/2018 PASS
DetailsMorgan Webb
Routing - Addressing6/20/2018 6/21/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  6/20/2018 DONE
Intake Approval  6/20/2018 FAIL
changed intake approval to failed on 6/29/18. Should not have been accepted, need CFH before submit//leg
Recd Pcfee & Taken To Pln CK  6/20/2018 DONE
Application received 6/20/2018