BLD-Final | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Andrew Phone #: ###-####
|
DOC - Permit Finaled | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PEND |
Brandon Shaw
|
|
|
Corrections SAT... Pending ELE final... No issues with building final
|
BLD-Framing/Rough-in | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | FAIL |
Mike Jordan
|
|
|
Andrew Phone #: ###-####. Complete lateral bracing on A01 and A02 trusses as per the truss engineering.
|
BLD-Footing | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Mike Jordan
|
|
|
Andrew Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/2/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/25/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/21/2018 | 6/21/2018 | 6/25/2018 | | PASS |
Josh Bogle
|
|
|
due 6/27 - ADU?, paper plan
|
1st review completed | | | 6/25/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/25/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/25/2018 | | DONE |
|
|
|
Need RP
|
Telephone call | | | 6/25/2018 | | DONE |
|
|
|
called Andrew and told him permit is ready, fee due and need RP. Gave info to sign up for class
|
Routing - PLAN CHECK | 6/21/2018 | | 6/25/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLANNING | 6/21/2018 | | 6/22/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing Walk-In (Zoning) | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Josh Bogle
|
|
|
Candy took in - level two
|
Telephone call | | | 6/21/2018 | | DONE |
|
|
|
talked to Andrew-he knows that Josh B can not do his permit as a walk in if he's not here-it may be Wed next week befor he gets it. I explained that he could come in tomorrow anytime before 3:30 or next week if he wants to go thru as a walk in
|
Application received | | 6/21/2018 | | | |
|
|
|
|