Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD18-02211
StatusFinaled
Name BERKELEY BUILDING COMPANY INC
Site Address 7651 S WAGONS WEST AVE
Project Name8/1 Bonneville Pointe #2
Customer Number 
ePlanReviewYes
Description
W.U.I. Zone "B" but Zone "A" construction required. Class "A" Roof Required. Permit for the construction of a new 2713 sq. ft., two story (first story 1414 sq. ft., second story 1299 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 421 sq. ft. of covered patio/porch and a 677 sq. ft. attached garage per the approved plans, plan review report and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  12/6/2018 DONE
BLD-Final11/21/201811/26/201811/26/2018PPASS
DetailsJim Storey
Garage code: 0801 Phone #: ###-#### Inspection requested via web by Elena Stephens
DOC - Permit Finaled11/26/201811/26/201811/26/2018PPASS
DetailsJim Storey
BLD-Blower Door Test Results11/26/201811/26/201811/26/2018PDONE
DetailsJim Storey
Garage code: 0801 Phone #: ###-#### Inspection requested via web by Elena Stephens 3.4
BLD-Energy code compliance9/11/20189/11/20189/11/2018PPASS
DetailsJim Storey
Inspection requested via web by Marc Foote
BLD-Energy code compliance9/10/20189/10/20189/10/2018PPART
DetailsJim Storey
Inspection requested via web by Marc Foote one c/n idem fixed other not done north of entry door rim.
BLD-Energy code compliance9/6/20189/7/20189/7/2018PFAIL
DetailsJim Storey
Inspection requested via web by Marc Foote rim at entry not insulated north side and at garage above ceilling drop.
BLD-Framing/Rough-in9/5/20189/5/20189/5/2018PPASS
DetailsJim Storey
Inspection requested via web by Marc Foote framing and gyp boxout at lights ok to cover soffits
Plan Modification Accepted  8/29/2018 DONE
New manual j report
Routing - MECHANICAL8/29/2018 8/29/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing8/18/20188/20/20188/20/2018APASS
DetailsJim Storey
Inspection requested via web by Marc Foote
BLD-Wall Bracing8/15/20188/16/20188/16/2018AFAIL
DetailsJim Storey
Inspection requested via web by Marc Foote no call back #// missing strap per plan and c/n.
BLD-Wall Bracing8/15/20188/15/20188/15/2018PFAIL
DetailsBrandon Shaw
MST172 strap not as per construction set...
Blocking required at shear panels...
Provide city approved set of plans and /or revised Engineering...
BLD-Footing7/17/20187/18/20187/18/2018APASS
DetailsJim Storey
Jared Phone #: ###-####
OVERRIDE  7/12/2018  
Plan assigned to (RDP)6/25/20186/25/20187/12/2018 DONE
DetailsRob Patrick
7/12 sfd L2 ePlan...7/11 Failed for W.U.I. corrections
Issue PAID IN FULL permit  7/12/2018 DONE
Inspection Record Card- Bld  7/12/2018 DONE
Routing - PLAN CHECK7/12/2018 7/12/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/12/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  7/12/2018 DONE
met
Routing - PLANNING7/11/2018 7/11/2018 PASS
DetailsSue Cummings
Letter received 7/9/18
1st review completed  7/11/2018 FAIL
DetailsRob Patrick
Routing - PLAN CHECK7/11/2018 7/11/2018 FAIL
DetailsRob Patrick
Routing - PLAN CHECK6/25/2018 7/11/2018 FAIL
DetailsRob Patrick
W.U.I. corrections required.
Route to Impact Fee Review6/25/20186/28/20186/26/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/25/2018 6/26/2018 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  6/25/2018 DONE
Intake Approval  6/25/2018 PASS
Recd Pcfee & Taken To Pln CK  6/25/2018 DONE
Routing - Addressing6/25/2018 6/25/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/25/2018 6/25/2018 PASS
DetailsMorgan Webb
Intake Approval  6/22/2018 FAIL
Please place documents in the documents folder
Application received  6/21/2018 DONE
Application submitted via PDS Online on Jun 21 2018 4:22PM
Intake Approval  6/21/2018 FAIL
Please place documents in the documents folder (we will take out of drawings folder when task is sent back to us). Please update your energy code to the 2015 code and please label crawl space/attic access.
First Notice 12/16/2018   
Routing - PLANNING6/25/2018   FAIL
The letter of satisfaction has NOT been sign for the subdivision