BLD-Final | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Jim Sly
|
|
|
Garage code 0807 Phone #: ###-#### Inspection requested via web by Elena Stephens Blower Door Test 4.4
|
DOC - Permit Finaled | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | CANC |
Jim Storey
|
|
|
Garage code 0807 Phone #: ###-#### >> Inspection requested via web by Elena Stephens Inspection cancelled from web by: Elena Stephens
|
BLD-Energy code compliance | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Wall Bracing | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Footing | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Brandon Shaw
|
|
|
Jerrad Phone #: ###-####
|
OVERRIDE | | | 8/3/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/3/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/3/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 7/6/2018 | 7/6/2018 | 8/2/2018 | | DONE |
Brian McGowan
|
|
|
2nd REVIEW COMPLETE 7-6 sfd L1 ePlan
|
Routing - PLAN CHECK | 8/2/2018 | | 8/2/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLANNING | 7/25/2018 | | 7/25/2018 | | PASS |
Sue Cummings
|
|
|
The application has been correted. All good now
|
Routing - PLAN CHECK | 7/24/2018 | | 7/24/2018 | | PASS |
Brian McGowan
|
|
|
Did not resolve all corrections
|
Routing - PLAN CHECK | 7/12/2018 | | 7/12/2018 | | FAIL |
Brian McGowan
|
|
|
All required corrections were not resolved.Corrections
|
Routing - MECHANICAL | 7/10/2018 | | 7/10/2018 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 7/6/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/25/2018 | | 7/6/2018 | | FAIL |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 6/25/2018 | 6/28/2018 | 6/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/25/2018 | | 6/26/2018 | | FAIL |
Troy James
|
|
|
emailed correction to legends
|
Plan assigned to (RDP) | 6/25/2018 | 6/25/2018 | 6/25/2018 | | DEFR |
Rob Patrick
|
|
|
7/6 sfd L1 ePlan
|
Routing - Addressing | 6/25/2018 | | 6/25/2018 | | PASS |
Doug Chausow
|
|
|
Incorrect Lot/Block, it should be Lot 14 Blk 5 (the parcel # is correct)
|
Routing - PUBLIC WORKS | 6/25/2018 | | 6/25/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/25/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/25/2018 | | DONE |
|
|
|
|
Application received | | | 6/22/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 22 2018 9:50AM
|
Intake Approval | | | 6/22/2018 | | FAIL |
|
|
|
only app is uploaded
|
Routing - PLANNING | 6/25/2018 | | | | FAIL |
|
|
|
The letter of satisfaction has NOT been signed for the subdivision
|
Routing - PLANNING | 7/9/2018 | | | | FAIL |
|
|
|
Still no letter of satisfaction for the sub.
|
Routing - PLANNING | 7/13/2018 | | | | FAIL |
|
|
|
Site plan / application address don't match.
|