Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-02256
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2526 E WARM SPRINGS AVE
Project NameWinslow B
Customer Number 
ePlanReviewYes
Description
***Total UA trade-off energy approach*** Permit for the construction of a new 1918 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 175 sq. ft. of covered patio/porch and a 649 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/19/20192/20/20192/20/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Blower Door Test Results2/19/20192/20/20192/20/2019ADONE
DetailsBrandon Shaw
ACH50- 4.9
DOC - Permit Finaled2/20/20192/20/20192/20/2019PPASS
DetailsBrandon Shaw
BLD-Energy code compliance12/3/201812/7/201812/7/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in12/3/201812/5/201812/5/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Wall Bracing11/19/201811/20/201811/20/2018APASS
DetailsDave Hannah
Rudy Phone #: ###-####
BLD-Wall Bracing11/19/201811/19/201811/19/2018PNR
DetailsDave Hannah
Rudy Phone #: ###-#### no plans on site
BLD-Foundation9/11/20189/11/20189/11/2018PPASS
DetailsDave Hannah
Manny Phone #: ###-####
BLD-Footing9/6/20189/7/20189/7/2018APASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval9/6/20189/6/20189/6/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  7/24/2018 DONE
Inspection Record Card- Bld  7/24/2018 DONE
OVERRIDE  7/23/2018  
Permit Ready to Issue  7/23/2018 DONE
met
Routing - PLAN CHECK7/20/2018 7/20/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/20/2018 DONE
DetailsMichael Hanson
Plan assigned to (M_H)7/13/2018 7/20/2018 DONE
DetailsMichael Hanson
07/16 sfd L2 ePlan. 1st review completed - ESC requires additional information. MDH
1st review completed  7/16/2018 FAIL
DetailsMichael Hanson
ESC requires additional information. MDH
Routing - PLAN CHECK6/27/2018 7/16/2018 FAIL
DetailsMichael Hanson
ESC requires additional information. MDH
Routing - Addressing6/27/2018 7/16/2018 PASS
DetailsMichael Hanson
Passed per ePlan. MDH
Plan assigned to (RDP)6/27/20186/27/20187/13/2018 DEFR
DetailsRob Patrick
7/16 sfd L2 ePlan. 1st review completed - ESC requires additional information. MDH
Routing - MECHANICAL6/27/2018 6/29/2018 PASS
DetailsTroy James
Routing PW Grading-Hillside6/27/2018 6/29/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Route to Impact Fee Review6/27/20186/30/20186/28/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE6/27/20186/27/20186/27/2018 PASS
DetailsTim Frost
Routing - PLANNING6/27/2018 6/27/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/27/2018 6/27/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment6/27/2018 6/27/2018 PASS
DetailsMichael Zawacki
Site exempted from hillside ESC, platted as flat land
Plans ACCEPTED BY PLAN TECH  6/27/2018 DONE
Intake Approval  6/27/2018 PASS
Recd Pcfee & Taken To Pln CK  6/27/2018 DONE
Application received  6/25/2018 DONE
Application submitted via PDS Online on Jun 25 2018 12:45PM