BLD-Final | 10/3/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Code is 4908 in case you get there before I do but please call. Final grading inspection by engineer as well as by Melissa Jannusch has been completed with letter submitted. Gutter test done. Ready for final . Thank you. Phone #: ###-#### Inspection requested via web by Robert Bruno
|
DOC - Permit Finaled | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.25
|
FIRE-Final Inspection | 10/3/2019 | 10/4/2019 | 10/3/2019 | P | CANC |
Jim Page
|
|
|
Code is 4908 but I always lie to be on site during an inspection so please call. Gutter test and civil sign off already done. Phone #: ###-#### >> Inspection requested via web by Robert Bruno Inspection cancelled from web by: Robert Bruno
|
PubWorks Occupancy Approval | 9/24/2019 | 9/24/2019 | 9/24/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 5/31/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
Jim Storey
|
|
|
Wui soffits Phone #: ###-#### Inspection requested via web by Robert Bruno can light fire protection alt. not aproved by bfd r greives. do not cover.
|
BLD-Energy code compliance | 5/25/2019 | 5/28/2019 | 5/28/2019 | A | PASS |
Brandon Shaw
|
|
|
Insulation. Phone #: ###-#### Inspection requested via web by Robert Bruno
|
DOC - Permit Finaled | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | PASS |
Brandon Shaw
|
|
|
Detached Garage only, remaining ELE is for main house...
|
CHANGE STATUS TO (ISS) | | | 5/28/2019 | | DONE |
|
|
|
reopen per brandon
|
BLD-Framing/Rough-in | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | PEND |
Brandon Shaw
|
|
|
Need ais/ foam seal
|
BLD-Foundation | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | CANC |
Brandon Shaw
|
|
|
Please schedule for late morning and call Jay with any questions. Phone #: ###-#### Inspection requested via web by Admin Assistant
|
BLD-Wall cover | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Stevie Phone #: ###-####
|
BLD-Foundation | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Footing | 12/24/2018 | 12/26/2018 | 12/26/2018 | A | PASS |
Jim Storey
|
|
|
Request 11:00 inspection Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 12/21/2018 | 12/21/2018 | 12/21/2018 | | DONE |
Jason C. Taylor
|
|
|
**Crawlspace/Basement ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Retaining wall
|
BLD-Footing | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears retainning wall ftg ok
|
Plan assigned to (RDP) | 8/17/2018 | 8/17/2018 | 10/17/2018 | | DONE |
Rob Patrick
|
|
|
09/05 sfd L2 ePlan...8/27 Failed and returned to Bruno...9-13 Failed; Corrections Required
|
PubWorks Subgrade Approval | 10/10/2018 | 10/10/2018 | 10/10/2018 | | DONE |
Melissa Jannusch
|
|
|
FOR NORTH RETAINING WALL. A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 9/24/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/24/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/19/2018 | | |
|
|
|
|
Routing - FIRE | 9/19/2018 | 9/19/2018 | 9/19/2018 | | PASS |
Erika Akin
|
|
|
Attached comments and alternate to case
|
Plan assigned to (RDP) | 9/19/2018 | 9/19/2018 | 9/19/2018 | | DONE |
Rob Patrick
|
|
|
per Eplan and plan check pass
|
Permit Ready to Issue | | | 9/19/2018 | | DONE |
|
|
|
met
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/14/2018 | | 9/14/2018 | | PASS |
Rob Patrick
|
|
|
|
Routing - FIRE | 9/13/2018 | 9/13/2018 | 9/13/2018 | | FAIL |
Erika Akin
|
|
|
Plans need to be updated to reflect requirements of the approved alternate
|
Routing - PLAN CHECK | 9/13/2018 | | 9/13/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections required
|
Routing PW Grading-Hillside | 9/13/2018 | | 9/13/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Routing - PLANNING | 9/7/2018 | | 9/7/2018 | | PASS |
Nicolette Womack
|
|
|
|
1st review completed | | | 8/27/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - FIRE | 8/17/2018 | 8/17/2018 | 8/24/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing PW Grading-Hillside | 8/17/2018 | | 8/23/2018 | | FAIL |
Melissa Jannusch
|
|
|
Comply with planning and zoning setback requirements and CFH approval letter and separate walls by 5 feet.
|
Routing - PLAN CHECK | 8/17/2018 | | 8/23/2018 | | FAIL |
Rob Patrick
|
|
|
Applicant needs to upload new retaining wall dwgs.
|
Route to Impact Fee Review | 8/17/2018 | 8/20/2018 | 8/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/17/2018 | | 8/20/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/17/2018 | | 8/20/2018 | | FAIL |
Nicolette Womack
|
|
|
Multiple retaining walls within the side yard setback shall be separated by 5 feet.The width of the driveway within the front yard setback shall not exceed 33’.
|
Routing - Addressing | 8/17/2018 | | 8/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/17/2018 | | 8/17/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/17/2018 | | 8/17/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 8/17/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/17/2018 | | PASS |
|
|
|
|
Intake Approval | | | 7/27/2018 | | FAIL |
|
|
|
Please wait for the CFH18-00069 appeal period July 30th @5 pm to end, to resubmit for this building permit.
Please separate the erosion and grading plans, so they are individual sheets.
|
Application received | | | 6/25/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 25 2018 3:13PM
|