BLD-Final | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Mike Jordan
|
|
|
garage code 7530 Phone #: ###-#### Inspection requested via web by Rustin Ray
|
DOC - Permit Finaled | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 2/7/2019 | 2/7/2019 | 2/7/2019 | A | DONE |
Mike Jordan
|
|
|
4.75 ACH @ 50pa
|
BLD-Final | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | PEND |
Mike Jordan
|
|
|
Call for access Phone #: 2089089038 >> Inspection requested via mobile web by Spencer Ray. Needs blower door test and post results. No other issues.
|
BLD-Energy code compliance | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089089038 >> Inspection requested via mobile web by Spencer
|
BLD-Framing/Rough-in | 10/9/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089089038 >> Inspection requested via mobile web by Spencer. All issues have been resolved.
|
BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray. Install all missed blocking and nail as noted previously, see plan for locations. install the (2) 9.5xll LVL at barel vault to pickup interior bearing on A4 trusses. Headers required at closet openings on A5 trusses in bedroom.
|
BLD-Wall Bracing | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Brandon Shaw
|
|
|
Blocking needed at shear panels, see red paint...
|
BLD-Foundation | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Mike Jordan
|
|
|
Daren-would like as late am as possible Phone #: ###-####
|
BLD-Footing | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
Mike Jordan
|
|
|
Daren Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/15/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/15/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/10/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 6/26/2018 | 6/26/2018 | 7/10/2018 | | DONE |
Brian McGowan
|
|
|
7-10 sfd L1 ePlan
|
Routing - PLAN CHECK | 6/26/2018 | | 7/10/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/10/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
|
Routing - Addressing | 7/9/2018 | | 7/9/2018 | | PASS |
Doug Chausow
|
|
|
Application still has incorrect address - but drawings have been corrected.
|
Routing - PUBLIC WORKS | 7/9/2018 | | 7/9/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Reviewer's activity | | | 7/3/2018 | | DONE |
Brian McGowan
|
|
|
Requested applicant resubmit his drawings and documents with the correct Lot and Block information.
|
Routing - MECHANICAL | 6/26/2018 | | 6/28/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 6/26/2018 | 6/29/2018 | 6/27/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/26/2018 | | 6/27/2018 | | FAIL |
Doug Chausow
|
|
|
Drawing are for 2675 S Simbury Pl adj property.
|
Application received | | | 6/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 26 2018 3:14PM
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/26/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/26/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 6/26/2018 | | 6/26/2018 | | PASS |
Sue Cummings
|
|
|
See redline. Move house back so garage is 20 ft. from edge of common drive. FYI: side setbacks are 10 ft. in the R-B zone.
|
Routing - PUBLIC WORKS | 6/26/2018 | | 6/26/2018 | | FAIL |
Morgan Webb
|
|
|
|