Print Statement | | | 5/1/2019 | | DONE |
|
|
|
|
Third Notice | | 1/12/2019 | 1/22/2019 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Amar
|
Second Notice | | 12/23/2018 | 1/7/2019 | | DONE |
|
|
|
MAILED 1-11-19
|
First Notice | | 12/6/2018 | 12/13/2018 | | DONE |
|
|
|
mailed 12-14
|
Permanent Occupancy | | | 11/26/2018 | | DONE |
|
|
|
|
BLD-Final | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Jim Storey
|
|
|
Cody Phone #: ###-#### oc card signed
|
Zoning Approval | 9/5/2018 | 9/5/2018 | 9/5/2018 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Cody Phone #: ###-####
|
BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Jim Storey
|
|
|
pat Phone #: ###-####
|
OVERRIDE | | | 8/16/2018 | | |
|
|
|
|
Print Occupancy Form | | | 8/16/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/16/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/16/2018 | | 8/16/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 8/16/2018 | | 8/16/2018 | | PASS |
Michael Hanson
|
|
|
Passed per ePlan Dave Haugland. MDH
|
Permit Ready to Issue | | | 8/16/2018 | | DONE |
|
|
|
Need- all met
GC Form
Revsied Cert of Value
|
Plan assigned to (M_H) | 7/12/2018 | | 8/16/2018 | | DONE |
Michael Hanson
|
|
|
08/15 502 L1 ePlan - Pasadena Carports New. 1st review completed - Structural code year incorrect, coverage for loading and unloading ADA locations, missing Van accessible spot and signage. MDH 2nd review Architectural stamp update, update notes, add parking space analysis. MDH
|
Routing - PLANNING | 7/12/2018 | | 8/16/2018 | | PASS |
Michael Hanson
|
|
|
No review required per Susan Riggs ePlan comments. MDH
|
Routing - PLAN CHECK | 8/10/2018 | | 8/10/2018 | | FAIL |
Michael Hanson
|
|
|
Architectural stamp update, update notes, add parking space analysis. MDH
|
Route to Impact Fee Review | 7/26/2018 | 7/29/2018 | 7/27/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 7/12/2018 | | 7/26/2018 | | FAIL |
Michael Hanson
|
|
|
Per Dave Haugland AHJ engineering. MDH
|
1st review completed | | | 7/26/2018 | | FAIL |
Michael Hanson
|
|
|
Structural code year incorrect, coverage for loading and unloading ADA locations, missing Van accessible spot and signage. MDH
|
Routing - PLAN CHECK | 7/12/2018 | | 7/26/2018 | | FAIL |
Michael Hanson
|
|
|
Structural code year incorrect, coverage for loading and unloading ADA locations, missing Van accessible spot and signage. MDH
|
Routing PW Drainage | 7/12/2018 | | 7/20/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 7/12/2018 | 7/12/2018 | 7/16/2018 | | PASS |
Erika Akin
|
|
|
No comments attached. Site approved with building permit. Inspector to field verify carports do not encroach into approved FD access.
|
Routing - Addressing | 7/12/2018 | | 7/12/2018 | | PASS |
Doug Chausow
|
|
|
Added new address: 3026 S Owyhee St
|
Routing - PUBLIC WORKS | 7/12/2018 | | 7/12/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 7/12/2018 | | 7/12/2018 | | PASS |
Michael Zawacki
|
|
|
Approved. No prep inspection required.
|
Intake Approval | | | 7/12/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/12/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/12/2018 | | DONE |
|
|
|
|
Routing - Design Review | 7/12/2018 | | 7/12/2018 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 6/29/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. All construction drawings must be minimum 18"x24" sheet size.
|
Application received | | | 6/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 26 2018 5:35PM
|