BLD-Final | 10/16/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Thomas Bond
|
DOC - Permit Finaled | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 10/16/2018 | 10/17/2018 | 10/16/2018 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Thomas Bond Inspection cancelled from web by: Thomas Bond
|
BLD-Framing/Rough-in | 7/17/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Jim Sly
|
|
|
Thomas Phone #: ###-#### Frame and Energy OK........Pending Electr, Plumb. and Mech rough in approvals.
|
Routing Walk-In (BLD) | 7/2/2018 | 7/2/2018 | 7/2/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/2/2018 | | 7/2/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/2/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/2/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/2/2018 | | DONE |
|
|
|
|
Meeting | | | 7/2/2018 | | DONE |
|
|
|
homeowner started permit online as window/siding permit. changed to 406 remodel permit.
|
Application received | | | 6/26/2018 | | DONE |
|
|
|
This permit was created on the web by Tom Bond
|