Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-02286
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 1803 N MOCKBEE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
FIRE SPRINKLERS REQUIRED PER BFD MEMO. HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3439 sq. ft., two story (first story 2110 sq. ft., basement 1329 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 439 sq. ft. of covered patio/porch and a 781 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. REScheck provided for Energy compliance. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results1/9/20191/9/20191/9/2019PPASS
DetailsDave Hannah
4.0
BLD-Final1/9/20191/9/20191/9/2019PPASS
DetailsDave Hannah
A bond will be completed early this morning for the landscaping/ hillside. Tisha should have all the info. Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch ***bond have been recorded. blh ###-####*** blower door 4.0
DOC - Permit Finaled1/9/20191/9/20191/9/2019PPASS
DetailsDave Hannah
PubWorks Occupancy Approval1/9/20191/9/20191/9/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final1/7/20191/8/20191/8/2019PNR
DetailsDave Hannah
Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Final1/4/20191/4/20191/4/2019PCANC
DetailsTony Young
Fire should pass after lunch Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
BLD-Energy code compliance10/15/201810/16/201810/16/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in10/12/201810/12/201810/12/2018PPASS
DetailsBrandon Shaw
Corrections SAT...

OK to insulate
BLD-Framing/Rough-in10/9/201810/9/201810/9/2018PCANC
DetailsBrandon Shaw
Previous inspection entry should be Fail, not Cancel.
BLD-Framing/Rough-in10/9/201810/9/201810/9/2018PCANC
DetailsBrandon Shaw
Need straps at breaks in double top plates...
Provide continuous bearing to footing for 3 ply beam, supporting 3 ply box truss, up stairs hallway...
Need air/foam seal...
See red paint
BLD-Wall Bracing10/9/201810/9/201810/9/2018PPEND
DetailsBrandon Shaw
Interior shear to be as per plans...

See red paint
BLD-Wall Bracing10/2/201810/3/201810/3/2018APART
DetailsJim Storey
Can you also please do a courtesy framing inspection while you were there so we can fix any items that may need to be done thank you Phone #: ###-#### Inspection requested via web by bryan murdoch exterior ok
BLD-Foundation8/9/20188/9/20188/9/2018PDONE
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation8/8/20188/8/20188/8/2018PPART
DetailsMike Jordan
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo. Basement walls ok. Noted footing on garage foundation had vertical reinforcement at 4ft. oc. Approved plans and engineering shows verts at 18 inches oc. Spoke to Kaleb Jones with Performance engineers, he noted that 4ft. verts in this area only is ok. Kaleb to send me new deatl with his stamp showing this.
BLD-Footing8/2/20188/2/20188/2/2018APASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval7/31/20187/31/20187/31/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  7/25/2018 DONE
OVERRIDE  7/24/2018  
Plan assigned to (BJM)7/18/20187/18/20187/24/2018 DONE
DetailsBrian McGowan
07/16 sfd L2 Paper- Corrections Required
Telephone call  7/24/2018 DONE
called to let know permit is ready and how much is owed-left message on his phone
Routing - PLAN CHECK7/24/2018 7/24/2018 PASS
DetailsBrian McGowan
Case Summary (BLD)  7/24/2018 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  7/24/2018 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  7/24/2018 DONE
Permit Ready to Issue  7/24/2018 DONE
met
Plan resubmittals received  7/20/2018 DONE
Resubmittals received 2 of sheets A-201, A-202, S-101, S-101, S-107, S-108, S-110 & 2 STRUC CALCS-took to Brian McGowan
Routing - MECHANICAL7/19/2018 7/19/2018 PASS
DetailsChad Schwendiman
Routing - FIRE7/18/20187/18/20187/18/2018 PASS
DetailsTim Frost
1st review completed  7/18/2018 FAIL
DetailsBrian McGowan
Routing - PUBLIC WORKS6/27/2018 7/18/2018 PASS
DetailsMorgan Webb
Routing - PLAN CHECK  7/18/2018 FAIL
DetailsBrian McGowan
Plan resubmittals received  7/16/2018 DONE
Two copies of Suez letter and BS-101. Stamped and taken to plan reviewers desk.
Routing - FIRE7/6/20186/27/20187/9/2018 FAIL
DetailsErika Akin
7/16 New SFH paper plans
Routing - Erosion and Sediment7/5/2018 7/6/2018 PASS
DetailsAndy J. Long
ESC site plan with map and narrative approved. Site preparation inspection is REQUIRED. Certified RP designated.
Routing - MECHANICAL7/2/2018 7/5/2018 FAIL
DetailsChad Schwendiman
Window U value, and floor R value doesn't match rescheck. Emailed Legands mechanical.
Routing - PLANNING7/3/2018 7/3/2018 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS7/2/2018 7/3/2018 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside6/27/2018 7/2/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Route to Impact Fee Review6/27/20186/30/20186/28/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Plan assigned to (RDP)6/27/20186/27/20186/27/2018 DEFR
DetailsRob Patrick
7/16 sfd L2 Paper
Plans ACCEPTED BY PLAN TECH  6/27/2018 DONE
Intake Approval  6/27/2018  
Recd Pcfee & Taken To Pln CK  6/27/2018 DONE
Routing - Addressing6/27/2018 6/27/2018 PASS
DetailsDoug Chausow
Routing PW Sewer Rating6/27/2018 6/27/2018 PASS
DetailsMorgan Webb
Application received 6/27/2018