BLD-Blower Door Test Results | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
4.0
|
BLD-Final | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
A bond will be completed early this morning for the landscaping/ hillside. Tisha should have all the info. Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch ***bond have been recorded. blh ###-####*** blower door 4.0
|
DOC - Permit Finaled | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 1/9/2019 | 1/9/2019 | 1/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | NR |
Dave Hannah
|
|
|
Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Final | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | CANC |
Tony Young
|
|
|
Fire should pass after lunch Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
BLD-Energy code compliance | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to insulate
|
BLD-Framing/Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | CANC |
Brandon Shaw
|
|
|
Previous inspection entry should be Fail, not Cancel.
|
BLD-Framing/Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | CANC |
Brandon Shaw
|
|
|
Need straps at breaks in double top plates... Provide continuous bearing to footing for 3 ply beam, supporting 3 ply box truss, up stairs hallway... Need air/foam seal... See red paint
|
BLD-Wall Bracing | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PEND |
Brandon Shaw
|
|
|
Interior shear to be as per plans...
See red paint
|
BLD-Wall Bracing | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PART |
Jim Storey
|
|
|
Can you also please do a courtesy framing inspection while you were there so we can fix any items that may need to be done thank you Phone #: ###-#### Inspection requested via web by bryan murdoch exterior ok
|
BLD-Foundation | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | DONE |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PART |
Mike Jordan
|
|
|
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo. Basement walls ok. Noted footing on garage foundation had vertical reinforcement at 4ft. oc. Approved plans and engineering shows verts at 18 inches oc. Spoke to Kaleb Jones with Performance engineers, he noted that 4ft. verts in this area only is ok. Kaleb to send me new deatl with his stamp showing this.
|
BLD-Footing | 8/2/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 7/31/2018 | 7/31/2018 | 7/31/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/25/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/24/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 7/18/2018 | 7/18/2018 | 7/24/2018 | | DONE |
Brian McGowan
|
|
|
07/16 sfd L2 Paper- Corrections Required
|
Telephone call | | | 7/24/2018 | | DONE |
|
|
|
called to let know permit is ready and how much is owed-left message on his phone
|
Routing - PLAN CHECK | 7/24/2018 | | 7/24/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/24/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/24/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/24/2018 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 7/20/2018 | | DONE |
|
|
|
Resubmittals received 2 of sheets A-201, A-202, S-101, S-101, S-107, S-108, S-110 & 2 STRUC CALCS-took to Brian McGowan
|
Routing - MECHANICAL | 7/19/2018 | | 7/19/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - FIRE | 7/18/2018 | 7/18/2018 | 7/18/2018 | | PASS |
Tim Frost
|
|
|
|
1st review completed | | | 7/18/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | 6/27/2018 | | 7/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | | | 7/18/2018 | | FAIL |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 7/16/2018 | | DONE |
|
|
|
Two copies of Suez letter and BS-101. Stamped and taken to plan reviewers desk.
|
Routing - FIRE | 7/6/2018 | 6/27/2018 | 7/9/2018 | | FAIL |
Erika Akin
|
|
|
7/16 New SFH paper plans
|
Routing - Erosion and Sediment | 7/5/2018 | | 7/6/2018 | | PASS |
Andy J. Long
|
|
|
ESC site plan with map and narrative approved. Site preparation inspection is REQUIRED. Certified RP designated.
|
Routing - MECHANICAL | 7/2/2018 | | 7/5/2018 | | FAIL |
Chad Schwendiman
|
|
|
Window U value, and floor R value doesn't match rescheck. Emailed Legands mechanical.
|
Routing - PLANNING | 7/3/2018 | | 7/3/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 7/2/2018 | | 7/3/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 6/27/2018 | | 7/2/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 6/27/2018 | 6/30/2018 | 6/28/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (RDP) | 6/27/2018 | 6/27/2018 | 6/27/2018 | | DEFR |
Rob Patrick
|
|
|
7/16 sfd L2 Paper
|
Plans ACCEPTED BY PLAN TECH | | | 6/27/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/27/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/27/2018 | | DONE |
|
|
|
|
Routing - Addressing | 6/27/2018 | | 6/27/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Sewer Rating | 6/27/2018 | | 6/27/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | 6/27/2018 | | | |
|
|
|
|