BLD-Final | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Tony Young
|
|
|
Inspection requested via web by Petros Paflias
|
DOC - Permit Finaled | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PART |
Tell Riley
|
|
|
Inspection requested via web by Petros Paflias//need to install smoke and carbon monoxide detectors per plans//all other parts of permit are complete//
|
BLD-Final | 7/3/2019 | 7/8/2019 | 7/8/2019 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Petros Paflias. Needs electrical final first.
|
BLD-Conference | 7/3/2019 | 7/8/2019 | 7/3/2019 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Petros Paflias Inspection cancelled from web by: Petros Paflias
|
BLD-Energy code compliance | 9/24/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 9/20/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Brandon Shaw
|
|
|
Air/foam seal needed...
OK to cover
|
OVERRIDE | | | 9/14/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/14/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/14/2018 | 9/14/2018 | 9/14/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 9/14/2018 | 9/14/2018 | 9/14/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/14/2018 | | 9/14/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/14/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/14/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/14/2018 | | DONE |
|
|
|
changes to the patio
|
CHANGE STATUS TO (REV) | | | 9/14/2018 | | DONE |
|
|
|
waiting for walking zoning activity to pass
|
CHANGE STATUS TO (ISS) | | | 9/14/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/12/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/12/2018 | | 9/12/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/12/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2018 | | DONE |
Josh Bogle
|
|
|
min 1 hr plan mod fee
|
Permit Ready to Issue | | | 9/12/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/12/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/12/2018 | | DONE |
|
|
|
|
BLD-Conference | 9/9/2018 | 9/11/2018 | 9/11/2018 | A | NR |
Mike Jordan
|
|
|
Wall Bracing and Framing Phone #: ###-#### Inspection requested via web by Petros Paflias. Will need to go back to plan review to show changes in exterior door and windows as well as approval for site built trusses.
|
BLD-Foundation | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Tony Young
|
|
|
Forms will be set and ready for inspection. Plans are to pour concrete that afternoon after inspection. Phone #: ###-#### Inspection requested via web by Petros Paflias,, monolithic pour,, ok
|
OVERRIDE | | | 6/27/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/27/2018 | 6/27/2018 | 6/27/2018 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 6/27/2018 | 6/27/2018 | 6/27/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/27/2018 | | 6/27/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/27/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/27/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/27/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/27/2018 | | DONE |
|
|
|
|
Application received | | 6/27/2018 | | | |
|
|
|
|