BLD-Final | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
DOC - Permit Finaled | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 2/20/2019 | 2/20/2019 | 2/20/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.7
|
FIRE-Final Inspection | 2/14/2019 | 2/19/2019 | 2/19/2019 | P | CANC |
Troy Cobbley
|
|
|
No fire life safety sign off required. Ryan-please for the access code Phone #: ###-####
|
BLD-Energy code compliance | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Jim Sly
|
|
|
Ryan'' Phone #: ###-####
|
BLD-Framing/Rough-in | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Jim Sly
|
|
|
Chad Phone #: ###-####
|
BLD-Wall Bracing | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Jim Sly
|
|
|
Chad Sargent Phone #: ###-####
|
BLD-Footing | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Jim Sly
|
|
|
Bryan Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/13/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/12/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 9/6/2018 | 9/6/2018 | 9/12/2018 | | DONE |
Rob Patrick
|
|
|
9/7 Failed: Mulptiple Corrections Required
|
Telephone call | | | 9/12/2018 | | DONE |
|
|
|
Left a message for Chad informing him that this permit is ready and the fee amount due for issuance
|
Routing - PLAN CHECK | 9/12/2018 | | 9/12/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 9/12/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/12/2018 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 9/11/2018 | | DONE |
|
|
|
Two copies of sheets A-1, A-2, A-3 and S-1. taken to Rob
|
Routing - PLAN CHECK | 9/4/2018 | | 9/7/2018 | | FAIL |
Rob Patrick
|
|
|
Multiple Corrections Required
|
Routing - MECHANICAL | 9/6/2018 | | 9/6/2018 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 8/31/2018 | | 9/4/2018 | | FAIL |
Troy James
|
|
|
Emailed corrections to Dustin Mori
|
Routing - PLANNING | 8/30/2018 | | 8/31/2018 | | PASS |
Rob Patrick
|
|
|
|
Routing - Addressing | 8/29/2018 | | 8/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2018 | | 8/30/2018 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 8/29/2018 | 9/4/2018 | 8/29/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Route to Impact Fee Review | 6/27/2018 | 6/30/2018 | 6/29/2018 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Plan assigned to (RDP) | 6/27/2018 | 6/27/2018 | 6/29/2018 | | CANC |
Rob Patrick
|
|
|
Applicant cannot build this house plan on this lot per planning so he said he would build this house on a different lot and re-submit a new floor plan set for this permit number.
|
Routing - PLAN CHECK | | | 6/29/2018 | | FAIL |
Rob Patrick
|
|
|
Applicant cannot build this house plan on this lot per planning so he said he would build this house on a different lot and re-submit a new floor plan set for this permit number.
|
1st review completed | | | 6/29/2018 | | FAIL |
Rob Patrick
|
|
|
Applicant cannot build this house plan on this lot per planning so he said he would build this house on a different lot and re-submit a new floor plan set for this permit number.
|
Routing - PLANNING | 6/28/2018 | | 6/28/2018 | | FAIL |
Jeff Lowe
|
|
|
approval of ROS18-00006 requires that parcels A/B share a driveway on the common Lot line. site plan does not show home utiliziing shared driveway.
|
Routing - Addressing | 6/27/2018 | | 6/28/2018 | | PASS |
Doug Chausow
|
|
|
The correct property parcel number is being used.
|
Routing - PUBLIC WORKS | | | 6/28/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/27/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/27/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/27/2018 | | DONE |
|
|
|
|
Application received | | 6/27/2018 | | | |
|
|
|
|