Permit Information
Permit NumberBLD18-02303
StatusFinaled
Name VICTORY WINDOW & REMODELING
Site Address 5926 N COLLISTER DR
Project NameHellstern sunroom & deck
Customer Number 
ePlanReviewNo
Description
WUI - Hillside - Permit to build a 112sq' Sunroom & 380sq' deck with cable guard in the location of an existing deck. All work per plans, notes, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/27/20188/28/20188/28/2018ADONE
DetailsTony Young
kevin Phone #: ###-####
DOC - Permit Finaled8/28/20188/28/20188/28/2018PPASS
DetailsTony Young
BLD-Final8/23/20188/23/20188/23/2018PNR
DetailsJim Sly
Kevin Phone #: ###-####
Need Joist hanger at end of joist nearest West stairway. Need one handrail at West stairway.
BLD-Framing/Rough-in8/9/20188/10/20188/10/2018PPASS
DetailsBrandon Shaw
Decking is fire rated
BLD-Other7/23/20187/24/20187/24/2018APART
DetailsTony Young
floor cover in sun room; Phone #: ###-####, ok to cover floor area
BLD-Footing7/16/20187/17/20187/17/2018APASS
DetailsTony Young
Kevin Phone #: ###-####
BLD-Footing7/13/20187/16/20187/16/2018ANR
DetailsTony Young
Kevin Phone #: ###-####,, needs soils approval from public works
PubWorks Subgrade Approval7/16/20187/16/20187/16/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  7/12/2018 DONE
(F) Reprint permit  7/12/2018 DONE
OVERRIDE  7/11/2018  
Plan assigned to (JAB) Josh6/29/20186/29/20187/11/2018 PASS
DetailsJosh Bogle
1st done - Hillside deck - need engineering
Telephone call  7/11/2018 DONE
Spoke with Kevin to inform him the permit is ready, we need and RP and what fees are due.
Routing - PLAN CHECK7/11/2018 7/11/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  7/11/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  7/11/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/11/2018 DONE
DetailsJosh Bogle
ESC yes - Energy no
Inspection Record Card- Bld  7/11/2018 DONE
Permit Ready to Issue  7/11/2018 DONE
Need
RP- met
Routing - PLAN CHECK  7/2/2018 FAIL
DetailsJosh Bogle
1st review completed  7/2/2018 FAIL
DetailsJosh Bogle
Routing - Erosion and Sediment  6/29/2018 PASS
DetailsMichael Zawacki
Waiver request approved, foothills lot. Concrete washout needed or concrete contractor needs to haul away, no washout onto bare ground allowed. Good housekeeping required.
Routing PW Grading-Hillside6/29/2018 6/29/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Plans ACCEPTED BY PLAN TECH  6/29/2018 DONE
Intake Approval  6/29/2018 PASS
Recd Pcfee & Taken To Pln CK  6/29/2018 DONE
Routing Walk-In (Zoning)6/27/20186/27/20186/27/2018PPASS
DetailsJeff Lowe
Briarhill Sub 3 notes allowed setbacks of 5 side, 15 rear
Application received 6/27/2018