BLD-Final | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | DONE |
Tony Young
|
|
|
kevin Phone #: ###-####
|
DOC - Permit Finaled | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | NR |
Jim Sly
|
|
|
Kevin Phone #: ###-#### Need Joist hanger at end of joist nearest West stairway. Need one handrail at West stairway.
|
BLD-Framing/Rough-in | 8/9/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Brandon Shaw
|
|
|
Decking is fire rated
|
BLD-Other | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PART |
Tony Young
|
|
|
floor cover in sun room; Phone #: ###-####, ok to cover floor area
|
BLD-Footing | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
BLD-Footing | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | NR |
Tony Young
|
|
|
Kevin Phone #: ###-####,, needs soils approval from public works
|
PubWorks Subgrade Approval | 7/16/2018 | 7/16/2018 | 7/16/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/12/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/12/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/11/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/29/2018 | 6/29/2018 | 7/11/2018 | | PASS |
Josh Bogle
|
|
|
1st done - Hillside deck - need engineering
|
Telephone call | | | 7/11/2018 | | DONE |
|
|
|
Spoke with Kevin to inform him the permit is ready, we need and RP and what fees are due.
|
Routing - PLAN CHECK | 7/11/2018 | | 7/11/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/11/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Inspection Record Card- Bld | | | 7/11/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/11/2018 | | DONE |
|
|
|
Need
RP- met
|
Routing - PLAN CHECK | | | 7/2/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 7/2/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | | | 6/29/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved, foothills lot. Concrete washout needed or concrete contractor needs to haul away, no washout onto bare ground allowed. Good housekeeping required.
|
Routing PW Grading-Hillside | 6/29/2018 | | 6/29/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 6/29/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/29/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/29/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Jeff Lowe
|
|
|
Briarhill Sub 3 notes allowed setbacks of 5 side, 15 rear
|
Application received | | 6/27/2018 | | | |
|
|
|
|