Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-02321
StatusFinaled
Name CBH HOMES
Site Address 6991 W COHO DR
Project Name1-6 Fork South
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2,740 sq. ft., two story (first story 1,532 sq. ft., second story 1,208 sq. ft.) single family dwelling with 6 bedrooms, 2 and a half bathrooms, approximately 62 sq. ft. of covered patio/porch and a 780 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/7/20193/7/20193/7/2019APASS
DetailsMike Jordan
door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled3/7/20193/7/20193/7/2019PPASS
DetailsMike Jordan
All issues resolved.
BLD-Blower Door Test Results3/7/20193/7/20193/7/2019ADONE
DetailsMike Jordan
3.93ACH @ 50pa.
BLD-Final2/26/20192/27/20192/27/2019PFAIL
DetailsMike Jordan
Door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide code compliant landing and stairs from rear door. install the handrails. Install the 20 min. door and smoke seal.
BLD-Energy code compliance1/15/20191/16/20191/16/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in1/15/20191/15/20191/15/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in1/14/20191/14/20191/14/2019AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Remove insulation for framing inspection.
BLD-Framing/Rough-in1/10/20191/10/20191/10/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Mech. rough in inspection has failed.
BLD-Framing/Rough-in1/8/20191/10/20191/10/2019ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Framing/Rough-in1/7/20191/8/20191/8/2019ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Mech rough in inspection has failed.
Plan Modification Accepted  1/2/2019 DONE
resubmitted manual j report
Routing - MECHANICAL1/2/2019 1/2/2019 PASS
DetailsTroy James
New manual j report
BLD-Wall Bracing12/20/201812/21/201812/21/2018PPASS
DetailsMike Jordan
Matt Phone #: ###-####
BLD-Foundation11/26/201811/27/201811/27/2018PNR
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing11/21/201811/26/201811/26/2018PPASS
DetailsMike Jordan
Dane Phone #: ###-####
Issue PAID IN FULL permit  8/21/2018 DONE
Inspection Record Card- Bld  8/21/2018 DONE
OVERRIDE  8/7/2018  
Plan assigned to (BJM)7/2/20187/2/20188/7/2018 DONE
DetailsBrian McGowan
1st Review Complete - 07/16 sfd L1 ePlan
Routing - PLAN CHECK8/7/2018 8/7/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  8/7/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/7/2018 DONE
Routing - PLAN CHECK7/2/2018 7/16/2018 FAIL
DetailsBrian McGowan
1st review completed  7/16/2018 FAIL
DetailsBrian McGowan
Route to Impact Fee Review7/2/20187/5/20187/3/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL7/2/2018 7/3/2018 PASS
DetailsChad Schwendiman
Routing - PLANNING7/2/2018 7/2/2018 PASS
DetailsColleen T Carroll
Routing - Addressing7/2/2018 7/2/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/2/2018 7/2/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  7/2/2018 DONE
Recd Pcfee & Taken To Pln CK  7/2/2018 DONE
Intake Approval  7/2/2018 PASS
Application received  6/29/2018 DONE
Application submitted via PDS Online on Jun 29 2018 8:49AM