Site Address 3201 W AIRPORT WAY
Project NameBoise Airport - Server Room
Customer Number 
ePlanReviewYes
Description
(BOISE AIRPORT – SERVER ROOM HVAC UPGRADE) Permit is to remodel the HVAC system in various location within the Boise airport by utilizing the existing AHU-3 to serve cooling into the existing server room. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select mechanical ductwork and controls, installation of new mechanical ductwork, fire/smoke dampers and various mechanical work, electrical work and plumbing work. Note: the corridor is rated and to be maintained protected by any mechanical penetrations with fire/smoke dampers or ducts crossing corridor constructed of steel not less than 0.019 inch (26 gauge) in thickness and there are no openings serving the corridor. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  4/19/2019 DONE
sent 3rd late notice
Print Statement  3/14/2019 DONE
sent 2nd late notice
Print Statement  2/6/2019 DONE
sent 1st late notice
Print Statement  11/21/2018 DONE
Print Statement  10/25/2018 DONE
First Notice9/24/20189/24/201810/12/2018 DONE
DetailsJim Storey
mailed 10-15-18
BLD-Final9/21/20189/24/20189/24/2018APASS
DetailsJim Storey
Final - Call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen meet troy
DOC - Permit Finaled9/24/20189/24/20189/24/2018PPASS
DetailsJim Storey
FIRE-Final Inspection9/21/20189/24/20189/24/2018APASS
DetailsTroy Cobbley
Life safety passed.


Final - Call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen call jim so we can go at the same time 301
BLD-Final9/19/20189/21/20189/21/2018ADEFR
DetailsJim Storey
Final - Call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen
BLD-Final9/13/20189/14/20189/14/2018ANR
DetailsJim Storey
call 30 in ahead for escort - Luke Phone # ###-#### Inspection requested via web by Brandon Sorensen no fire alarm permit amd insp. /lifr saftey fireb insp// no bld insp.
BLD-Final8/28/20188/29/20188/28/2018ACANC
DetailsJim Storey
call 30 in ahead to escort /// Luke Phone #: ###-####-called TVR to let know all subs needed to call and attach the sub to bldg permit. None were attached so he cancelled this insp until he could get it all sorted out
Issue PAID IN FULL permit  8/21/2018 DONE
Inspection Record Card- Bld  8/21/2018 DONE
Plan assigned to (JG)8/9/20188/9/20188/17/2018 PASS
DetailsJavier Guzman
8/15 L1 Boise Airport - Server Room ePlan
Routing - PLAN CHECK8/9/2018 8/17/2018 PASS
DetailsJavier Guzman
1st review completed  8/17/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/17/2018 DONE
Permit Ready to Issue  8/17/2018 DONE
CARLW@TVRINC.NET
MET
need
GC Form
Revised cert of value
Routing - MECHANICAL8/9/2018 8/13/2018 PASS
DetailsTroy James
Routing - Addressing8/9/2018 8/10/2018 PASS
DetailsDoug Chausow
Routing - PLUMBING8/10/2018 8/10/2018 PASS
DetailsBill VanDegrift
Routing - PLUMBING8/10/2018 8/10/2018 PASS
DetailsBill VanDegrift
perplans and ISPC
Routing - PUBLIC WORKS8/9/2018 8/9/2018 PASS
DetailsMorgan Webb
Intake Approval  8/9/2018 PASS
DetailsJavier Guzman
Intake Approval  8/7/2018 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Plans are missing the signature and date on the stamp.
Verify new file are named exactly the same as the original or the software will not version them. Multiple versions of the same document will not be accepted...
Intake Approval  7/25/2018 FAIL
DetailsMichael Hanson
Missing signature and date on stamp. MDH
Application received  6/29/2018 DONE
Application submitted via PDS Online on Jun 29 2018 12:39PM