BLD-Final | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Jim Storey
|
|
|
Screened- call for access Tyler Phone #: ###-####
|
DOC - Permit Finaled | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Jim Storey
|
|
|
Tyler *screened* Phone #: ###-####
|
BLD-Wall Bracing | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Jim Storey
|
|
|
Shear inspection garage. Fire wall and truss engineering complete. Drywaller will hang two layers below when dried in. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand nail hanger to truss
|
BLD-Energy code compliance | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Tony Young
|
|
|
Tyler Phone #: ###-####.. seal pack ok also
|
BLD-Framing/Rough-in | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | PASS |
Jim Storey
|
|
|
*screened* Tyler Phone #: ###-####-3572
|
BLD-Wall Bracing | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | FAIL |
Jim Storey
|
|
|
shear garage- Tyler *Screened* Phone #: ###-####
|
Fees Due Hold | 5/5/2020 | | 5/5/2020 | | DONE |
|
|
|
|
Routing - MECHANICAL | 5/4/2020 | | 5/4/2020 | | PASS |
Troy James
|
|
|
|
Telephone call | | | 5/4/2020 | | DONE |
|
|
|
**Two PERMITs with plan mod fee BLD19-00490**
|
Plan Modification Accepted | | | 5/1/2020 | | DONE |
|
|
|
plan mod - Manual J per Kyle Lepper of LPR Architecture
|
BLD-Foundation | 4/21/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Jim Storey
|
|
|
screened // Pat Phone #: ###-####
|
BLD-Footing | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PART |
Jim Storey
|
|
|
screened // Chris Phone #: ###-#### wip garage
|
BLD-Wall Bracing | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Jim Storey
|
|
|
Plans are on the south unit in a black tube. Please call after inspection Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Wall Bracing | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | NR |
Tell Riley
|
|
|
Call for virtual inspection if possible. Or call ahead of time and we can leave for your safety. No workers have been exposed or diagnosed with Covid 19. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand/need shear plans//
|
BLD-Footing | 1/27/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Bob Archibald
|
|
|
stem wall // Scott Phone #: ###-####
|
BLD-Footing | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Jim Storey
|
|
|
SCOTT Phone #: ###-####
|
BLD-Foundation | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | FAIL |
Jim Storey
|
|
|
Scott Phone #: ###-#### ground frozen do not place concrete
|
OVERRIDE | | | 1/13/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 1/3/2020 | 1/3/2020 | 1/13/2020 | | DONE |
Rob Patrick
|
|
|
plan mod...01/08 waiting for applicant to upload.
|
Routing - PLAN CHECK | 1/13/2020 | | 1/13/2020 | | PASS |
Rob Patrick
|
|
|
Add 1 hour of review time. See Agency Document.
|
Routing - PLANNING | 1/13/2020 | | 1/13/2020 | | PASS |
Katelyn Menuge
|
|
|
Plan Mod Pass
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/13/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approved
|
CHANGE STATUS TO (ISS) | | | 1/13/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/3/2020 | | DONE |
|
|
|
Kyle Lepper from LPR Architecture requested a plan mod via email to include revisions to the separation wall construction, floor plan changes to the lower level and revised foundation details.
|
Issue PAID IN FULL permit | | | 12/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/23/2019 | | DONE |
|
|
|
|
Meeting | | | 12/23/2019 | | DONE |
|
|
|
as of 1pm 12/23 waiting for signed permit for this permit, bld19-00490 was sent back.
|
Telephone call | | | 12/20/2019 | | DONE |
|
|
|
received GC form from Kyle Lepper (kyle@lprarchitecture.com
Let him know we still need 306
|
Telephone call | | | 12/17/2019 | | DONE |
|
|
|
Spoke with a Tyler who wanted to pay fees. informed him we still need the GC to turn in a 302 and 306 form before we can add in the rest of the fees.
|
Meeting | | | 12/16/2019 | | DONE |
|
|
|
sent email to kyle@lprarchitecture.com, tony@tkboise.com and tyler@mbuilt.co informing permit will expire in 9 days and will either need to pay for the permit or submit at a later date (granted 2 extensions)
|
Meeting | | | 12/6/2019 | | DONE |
|
|
|
sent email to kyle@lprarchitecture.com, tony@tkboise.com and tyler@mbuilt.co informing permit will expire in 19 days and will either need to pay for the permit or submit at a later date (granted 2 extensions)
|
Telephone call | | | 11/19/2019 | | DONE |
|
|
|
left message for kyle and emailed kyle, anthony & tyler informing them this permit will expire 12-25 and has already be granted the two 180 day extensions we allow
|
Extend Review Timeline | | | 6/26/2019 | | DONE |
|
|
|
1st approved 180 day extension per adele. see documents
|
Extend Review Timeline | | | 6/26/2019 | | DONE |
|
|
|
Final approved 180 day extension per adele. see documents
|
Telephone call | | | 6/18/2019 | | DONE |
|
|
|
spoke with kyle and tony informing them that this permit is now 170 days pass the date. tony stated he sent the email to tisha. had them send to permits and to request two extentions if they are not going to pick the permit up in the next 10 days
|
Meeting | | | 6/18/2019 | | DONE |
|
|
|
Tony Koonce sent in letter for request of two extension. forward to adele
|
Telephone call | | | 5/21/2019 | | DONE |
|
|
|
Left a message for Tyler informing him that this permit is now 142 days past the expiration date. asked him to give me a call back to go over extension or void. Tried calling Tony(anthony) but phone number provided does not work
|
Telephone call | | | 5/21/2019 | | DONE |
|
|
|
Tyler called back. stated the person in charge of the project went on vacation yesterday. recommended he send in a request for extension since the permit is not 142 days past. Tyler stated he can not do anything since he's not in charge
|
Meeting | | | 3/27/2019 | | DONE |
|
|
|
sent an email to tyler informing him that this permit is 87 days past the expiration date and recommended sending in an extension request. see documents
|
OVERRIDE | | | 3/25/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 2/20/2019 | 2/20/2019 | 3/25/2019 | | DONE |
Rob Patrick
|
|
|
03/11 sfd L2 ePlan..Townhouse; 03/05 Failed; Corrections Req'd
|
Routing - PLAN CHECK | 3/25/2019 | | 3/25/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2019 | | |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/25/2019 | | DONE |
|
|
|
do not issue without BLD19-00490
need GC form
met
need RP
|
1st review completed | | | 3/5/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 2/20/2019 | | 3/5/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PUBLIC WORKS | 2/20/2019 | | 2/22/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 2/22/2019 | | 2/22/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 2/20/2019 | 2/23/2019 | 2/21/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 2/20/2019 | | 2/21/2019 | | FAIL |
Troy James
|
|
|
Window u-value should be max of .310.
Cfm design for cooling is too much.
|
Routing - PLANNING | 2/20/2019 | | 2/21/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Addressing | 2/20/2019 | | 2/21/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 2/20/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/13/2019 | | FAIL |
|
|
|
- Land Records Parcel Activity form states the second address is TBD. We need the new address and parcel number before this building permit can start review. If you have questions about the address please contact Ada County or our address department at ###-####.
-Please provide a second application and uploaded into this permits documents. (do not apply for another permit, just need to fill out another application with the second address and homes information)
-Please provide a Manual J for each townhome.
|
Meeting | | | 2/13/2019 | | DONE |
|
|
|
Spoke with Doug in addressing, the second address will show up in tidemark 2/14/19. (second permit will need to be created once it is tidemark)
|
Application received | | | 7/3/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 3 2018 8:42AM
|
Intake Approval | | | 7/3/2018 | | FAIL |
|
|
|
-Need to apply for a ROS with P&Z before submitting for the BLD. Once the ROS is complete a second 402 app is needed.
-Need a Stair section showing treads, risers, handrials & guard requirements.
Will need to do a full prescreen once ROS is passed and the second BLD is created.
|
Meeting | | | 7/3/2018 | | |
|
|
|
Spoke with Susan Riggs (she informed the applicant):
They need to talk to Ada County about the original two 25 ft lots (from warranty deed).
They will need two parcel numbers and a new address for the new lot. They will need to submit a DRH for substandard lots.
|