Third Notice | | 4/13/2019 | 4/15/2019 | | DONE |
|
|
|
This permit finaled on the web by Jay Lundergan
|
Second Notice | | 3/21/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
First Notice | | 2/18/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12
|
BLD-Final | 2/7/2019 | 2/8/2019 | 2/8/2019 | A | PASS |
Mike Jordan
|
|
|
Gary Phone #: ###-####. All issues have been resolved. Ok for perm occ.
|
Permanent Occupancy | | | 2/8/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Gary Phone #: ###-####
|
BLD-Final | 1/29/2019 | 1/31/2019 | 1/31/2019 | P | FAIL |
Mike Jordan
|
|
|
Gerla Phone #: ###-####. Provide code compliant handrails on ramp and all stairs.
|
FIRE-Final Inspection | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety until the knox box is provided.
Gary Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Brandon Shaw
|
|
|
Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Mike Jordan
|
|
|
Gary Phone #: ###-####. Interior steel stud framed walls be stage and front of house ok.
|
BLD-Other | 11/12/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Mike Jordan
|
|
|
Gary is the on-site superintendent. This is for the insulation inspection for the exterior walls. Phone #: ###-#### Inspection requested via web by Mark Fledderjohann
|
BLD-Framing/Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
Mike Jordan
|
|
|
Gary Phone #: ###-####. Interior steel stud framed walls only ok.
|
BLD-Framing/Rough-in | 10/3/2018 | 10/5/2018 | 10/5/2018 | A | PASS |
Mike Jordan
|
|
|
Gary-framing in ceiling only-or ###-#### Calvin Phone #: ###-####. New framed openings in roof structure for new RTU's and curbs. All work done per the New engineering provided by performance engineers.
|
BLD-Conference | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | DONE |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Contractor wants to hardlid the ceiling. Will need to show how to ventilate the created attic and maintain the 1 inch airgap at roof deck. Will also need to verfiy adequate fire sprinkler clearances with the fire inspector.
|
BLD-Footing | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Mike Jordan
|
|
|
Gary Gerla Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/13/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/13/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/15/2018 | 8/15/2018 | 9/12/2018 | | PASS |
Carl Westfall
|
|
|
(2nd done) 08/21/18 (L3 - 15 days) (ePlan - 27 sheets) Faith Christian Center
|
Routing - MECHANICAL | 9/5/2018 | | 9/12/2018 | | PASS |
Troy James
|
|
|
|
Routing Off Site - STRUCTURAL | 9/5/2018 | | 9/12/2018 | | PASS |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/12/2018 | | DONE |
|
|
|
MET
NEED
GC FORM
|
Telephone call | | | 9/12/2018 | | DONE |
|
|
|
sent email info@mussellconstruction.com informing 302 form is still needed before issuance
|
Routing - PLAN CHECK | 9/4/2018 | | 9/5/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 9/5/2018 | | 9/5/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00317
|
Plan resubmittals received | | | 9/4/2018 | | DONE |
|
|
|
|
1st review completed | | | 8/30/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 8/30/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/1/2018 | | 8/30/2018 | | FAIL |
Carl Westfall
|
|
|
Pass pending structural
|
Routing - FIRE | 8/1/2018 | 8/1/2018 | 8/29/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 8/1/2018 | | 8/23/2018 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Plan Reviewer's activity | | | 8/21/2018 | | DONE |
|
|
|
Uploaded revised sheets. Left message for Dave Haugland letting him know that I had uploaded structural sheets for his review.
|
Plan assigned to (CJW) | 8/1/2018 | 8/1/2018 | 8/11/2018 | | PASS |
Carl Westfall
|
|
|
* 08/21/18 (L3 - 15 days) (ePlan - 27 sheets) Faith Christian Center
|
Routing - MECHANICAL | 8/1/2018 | | 8/8/2018 | | FAIL |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/1/2018 | | 8/6/2018 | | PASS |
Michael Zawacki
|
|
|
Interior TI. No ESC required.
|
Routing - PLUMBING | 8/1/2018 | | 8/2/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC
|
Routing - PLANNING | 8/1/2018 | | 8/2/2018 | | PASS |
Susan Riggs
|
|
|
No review required
|
Routing - Design Review | 8/1/2018 | | 8/2/2018 | | FAIL |
Katelyn Menuge
|
|
|
Please add notes that seats in the sanctuary will not exceed 365 at this time, and all new rooftop equipment will be screened from view to comply with the Design Review requirements.
|
Routing - PUBLIC WORKS | 8/1/2018 | | 8/2/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 8/1/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/1/2018 | | DONE |
|
|
|
Jeff, as this is a change in use for this space please contact ACHD to verify whether any ACHD impact fees are due. The city will require documentation whether fees are due or not. If fees are due they may be paid to ACHD prior to the issuance of the permit or to the city at the time the permit is issued.
|
Routing - Addressing | 8/1/2018 | | 8/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 7/9/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Provide completed and signed 518 checklist document.
2. Provide completed and signed 304 registered design professional form.
3. New exterior door requires Design Review approval. Complete the DR process through boisecity.org (Andrea Tuning X7078)
4. Provide wall bracing detail (how are new interior wall connected to existing structure)
5. Provide completed, stamped, and signed 310 form for steel beam.
|
Application received | | | 7/3/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 3 2018 11:31AM
|