Letter of compliance/Occupancy | | | 9/7/2018 | | DONE |
|
|
|
|
BLD-Final | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | DONE |
Tony Young
|
|
|
Final can be done at anytime. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 9/4/2018 | 9/4/2018 | 9/4/2018 | | PASS |
KayCee Babb
|
|
|
per DRH18-00236 revised 8-31-18. Carport was not requested or approved.
|
Plan assigned to (JAB) Josh | 8/31/2018 | 8/31/2018 | 9/4/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/4/2018 | | 9/4/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2018 | | DONE |
Josh Bogle
|
|
|
no fees
|
Permit Ready to Issue | | | 9/4/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/4/2018 | | |
|
|
|
no fees per Josh b
|
Plan Modification Accepted | | | 8/31/2018 | | DONE |
|
|
|
turned in new site plan to show same as the DRH
(Final project does not match plans submitted and approved through DRH18-00236>)
|
Zoning Approval | 8/28/2018 | 8/28/2018 | 8/28/2018 | | FAIL |
KayCee Babb
|
|
|
Final project does not match plans submitted and approved through DRH18-00236.
|
BLD-Final | 8/24/2018 | 8/27/2018 | 8/27/2018 | A | NR |
Dave Hannah
|
|
|
Final can be done at anytime Monday. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch need zoning final
|
BLD-Footing | 8/3/2018 | 8/6/2018 | 8/6/2018 | P | PART |
Tony Young
|
|
|
Footing inspection can be done later in the PM on Monday. Jason will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch// work in progress,, ok
|
BLD-Footing | 8/1/2018 | 8/2/2018 | 8/2/2018 | P | CANC |
Tony Young
|
|
|
Later in the PM would be great for this footing inspection. Jason will be the installer for this and his cell number is ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by rich prasch Inspection cancelled from web by: rich prasch
|
(F) Reprint permit | | | 8/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/1/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/31/2018 | | DONE |
|
|
|
All requirements met
|
Issue PAID IN FULL permit | | | 7/31/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 7/31/2018 | | DONE |
|
|
|
Waiting for details in tidemark to be finished.
|
Plan assigned to (JAB) Josh | 7/5/2018 | 7/5/2018 | 7/30/2018 | | PASS |
Josh Bogle
|
|
|
1st done - patio cover, failed Planning
|
Routing - PLAN CHECK | 7/24/2018 | | 7/30/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2018 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLANNING | 7/24/2018 | | 7/24/2018 | | PASS |
KayCee Babb
|
|
|
per DRH18-00236
|
Routing - PLANNING | 7/11/2018 | | 7/11/2018 | | FAIL |
KayCee Babb
|
|
|
Plans do not match DRH18-00236. Pergolas are different dimensions and not on raised/sunken patios as approved. New plans or historic modification required.
|
Routing - PLAN CHECK | 7/11/2018 | | 7/11/2018 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLANNING | 7/10/2018 | | 7/10/2018 | | FAIL |
KayCee Babb
|
|
|
Plans do not match DRH18-00236. Pergolas are different dimensions and not on raised/sunken patios as approved. New plans or historic modification required.
|
Routing - PLAN CHECK | 7/10/2018 | | 7/10/2018 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLAN CHECK | 7/5/2018 | | 7/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 7/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 7/5/2018 | | 7/5/2018 | | FAIL |
KayCee Babb
|
|
|
Plans do not match those submitted and approved through DRH18-00236.
|
Intake Approval | | | 7/5/2018 | | PASS |
|
|
|
|
Application received | | | 7/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 4 2018 3:56PM
|