BLD-Final | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Storey
|
|
|
Blower door test complete and on site, handrail installed. Call for access. Phone #: ###-#### Inspection requested via web by Josh Peppersack
|
DOC - Permit Finaled | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | DONE |
Jim Storey
|
|
|
Blower door test complete and on site, handrail installed. Call for access. Phone #: ###-#### Inspection requested via web by Josh Peppersack 3.85
|
BLD-Final | 4/12/2019 | 4/16/2019 | 4/16/2019 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Peppersack no handrail
|
BLD-Blower Door Test Results | 4/12/2019 | 4/16/2019 | 4/16/2019 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Peppersack not done
|
BLD-Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Peppersack// needs the blower door test results,, handrail in the garage
|
BLD-Energy code compliance | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Storey
|
|
|
Insulation re inspection Phone #: ###-#### Inspection requested via web by Josh Peppersack
|
BLD-Energy code compliance | 1/21/2019 | 1/22/2019 | 1/22/2019 | P | DEFR |
Dave Hannah
|
|
|
Insulation re inspection Phone #: ###-#### Inspection requested via web by Josh Peppersack out of time
|
BLD-Energy code compliance | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PART |
Tony Young
|
|
|
Frame re inspection and insulation inspection. Phone #: ###-#### Inspection requested via web by Josh Peppersack,,, see notes on sticker,, fix roof leak and replace wet insulation,, fix insulation where frame fixes occured
|
BLD-Framing/Rough-in | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PART |
Dave Hannah
|
|
|
Josh Phone #: ###-#### c/n on site ok to insulate
|
BLD-Wall Bracing | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
shear // Josh Phone #: ###-####,, porch soffit area ok
|
BLD-Wall Bracing | 11/19/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Tony Young
|
|
|
Jimmy Phone #: ###-####
|
BLD-Foundation | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 9/7/2018 | 9/7/2018 | 9/7/2018 | A | PART |
Tony Young
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell,, work in progress,, ok
|
BLD-Footing | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | CANC |
Tony Young
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Thursday, September 06, 2018.
|
Issue PAID IN FULL permit | | | 8/22/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/21/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 7/26/2018 | 7/26/2018 | 8/21/2018 | | DONE |
Brian McGowan
|
|
|
07/26 sfd L1 ePlan - Corrections Required
|
Routing - PLAN CHECK | 8/21/2018 | | 8/21/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/21/2018 | | DONE |
|
|
|
met
|
Routing - Erosion and Sediment | 7/26/2018 | | 7/26/2018 | | PASS |
Andy J. Long
|
|
|
ESC general permit. No ESC plan required. Must designate ESC Responsible Person.
|
1st review completed | | | 7/26/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/13/2018 | | 7/26/2018 | | FAIL |
Brian McGowan
|
|
|
Wall bracing needs to be done in 2015 IRC Code
|
Route to Impact Fee Review | 7/13/2018 | 7/16/2018 | 7/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 7/13/2018 | | 7/16/2018 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 7/13/2018 | | 7/16/2018 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 7/13/2018 | | 7/13/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 7/13/2018 | | 7/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/13/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2018 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/13/2018 | | PASS |
|
|
|
|
Plan assigned to (M_H) | 7/13/2018 | | 7/13/2018 | | DEFR |
Michael Hanson
|
|
|
07/26 sfd L1 ePlan
|
Intake Approval | | | 7/12/2018 | | FAIL |
|
|
|
Plans must be uploaded as individual sheets and have correct file names.
Energy prescriptive needs to have 2015 IRC.
|
Application received | | | 7/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 5 2018 2:31PM
|