BLD-Final | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Tell Riley
|
|
|
Jeff Phone #: ###-####//penetratjions have been caulked//final complete///
|
DOC - Permit Finaled | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | FAIL |
Tell Riley
|
|
|
Jeff Phone #: ###-####//need to seal fire sprinkler riser and conduits at penetration through ceiling in mechanical area//
|
BLD-Final | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by SHERRY BIDDLE//obtain HVAC final inspection//Obtain ESC final inspection//seal penetrations through ceiling at fire sprinkler riser in mechanical area//
|
BLD-Framing/Rough-in | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Jim Sly
|
|
|
framing and insulation // Mark Phone #: ###-#### FRAME AND ENERGY>>>>PASS
|
FIRE-Sprinkler Rough-in | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok for cover.
|
BLD-Framing/Rough-in | 2/25/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Jim Sly
|
|
|
Sherrie-fire permit was pulled see FIR19-00117 Phone #: ###-#### Framing OK except for 2 straps a portal frame. Need sprinkler rough in approval.
|
Routing - MECHANICAL | 2/11/2019 | | 2/11/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Conference | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | CANC |
Jim Sly
|
|
|
|
BLD-Wall Bracing | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-####
|
BLD-Foundation | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/14/2018 | 10/15/2018 | 10/15/2018 | P | NR |
Brandon Shaw
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/1/2018 | 10/1/2018 | 10/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Inspection Record Card- Bld | | | 9/26/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/25/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 7/30/2018 | 7/30/2018 | 9/25/2018 | | DONE |
Rob Patrick
|
|
|
08/10 sfd L1 ePlan...8/3 Failed: 8/20 Failed for Planning Comment about Easement: 8/29 Planning Comments not Addressed.
|
Routing - PLANNING | 9/25/2018 | | 9/25/2018 | | PASS |
Sue Cummings
|
|
|
Applicant mirrored the house to get driveway away from street, moved the house closer to the front for side laoded garage and the patio is now out of the rear setback. O.K. now SC
|
Routing - PLAN CHECK | 9/25/2018 | | 9/25/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/25/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 8/29/2018 | | 8/29/2018 | | FAIL |
Sue Cummings
|
|
|
Patio still in rear setback and in the rear easement
|
Routing - PLAN CHECK | 8/29/2018 | | 8/29/2018 | | FAIL |
Rob Patrick
|
|
|
Planning Comments not Addressed
|
Routing - PLAN CHECK | 8/20/2018 | | 8/20/2018 | | FAIL |
Rob Patrick
|
|
|
8/20 Failed for Planning Comment about Easement
|
1st review completed | | | 8/3/2018 | | FAIL |
Rob Patrick
|
|
|
Correction Required
|
Routing - PLAN CHECK | 7/30/2018 | | 8/3/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Route to Impact Fee Review | 7/30/2018 | 8/2/2018 | 7/31/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 7/30/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/30/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 7/26/2018 | | 7/26/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 7/25/2018 | | 7/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/24/2018 | | 7/24/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 7/23/2018 | | FAIL |
|
|
|
failed-drawinfs are facing the wrong way-told to face landscape and make sure all correcrtions have been make
|
Intake Approval | | | 7/18/2018 | | FAIL |
Christina Prado
|
|
|
Prescreen failed; need attic vents, correct plan sheet size and code year updated
|
Application received | | | 7/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 5 2018 3:36PM
|
Routing - PLANNING | 7/30/2018 | | | | FAIL |
Sue Cummings
|
|
|
Redued setbacks are for shade structures under 250 s.f. and less than 15 ft. tall. Also, there is a 10 ft. easement along the rear property line.
|